1 Overview of the MYRRHA accelerator & presentation of the MAX project Jean-Luc BIARROTTE CNRS-IN2P3 / IPN Orsay, France EURATOM FP7 MAX project coordinator.

Slides:



Advertisements
Similar presentations
MYRRHA Injector at UCL Dirk Vandeplassche Luis Medeiros Romão SCK CEN MAX International Design Review Brussels, November 2012 Dirk Vandeplassche,
Advertisements

The UK ADSR programme Roger Barlow FFAG08 Manchester, 4 th September 2008.
Didier De Bruyn & Rafaël Fernandez (SCKCEN), Luigi Mansani (Ansaldo), Antony Woaye-Hune (AREVA), Massimo Sarotto (ENEA) & Evaldas Bubelis (KIT) ICAPP’12.
MYRRHA within the EURATOM roadmap MYRRHA Accelerator 1st International design review, SCK-CEN (Brussels, BE), 12-13/11/2012 Roger GARBIL Acting Head of.
HZDR FLUKA activities in support of the MYRRHA Project Short summary with a focus on activation problems Anna Ferrari, Stefan Müller, Jörg Konheiser.
Seminar on ESS29 November Seminar on neutron research centre in the Øresund region (European Spallation Source) 29 November 2002.
Copyright © 2013 SCKCEN MAX School - Frankfurt am Main – 1 st -2 nd October 2013 MYRRHA Multipurpose hYbrid Research Reactor for High-tech Applications.
1Jean-Luc Biarrotte, SPL/ESS meeting, Lünd, June 30, Accelerator design for MYRRHA J-L. Biarrotte, CNRS-IN2P3 / IPN Orsay.
Framatome ANP IP-EUROTRANS Meeting WP 1.5 Progress in safety approach development TEE, March Sophie EHSTER.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – Safety approach Madrid, November Sophie EHSTER.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – ETD Safety approach Safety approach for EFIT: Deliverable 1.21 Stockholm, May Sophie.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Nuclear and Energy Technologies.
Reliability Modeling of an ADS Accelerator SNS-ORNL/Myrrha Linac (MAX project) EuCARD 2, GENEVA (20-21 March 2014 ) CERN.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Yacine Kadi Thorium Energy Conference 2013 Globe of Innovation, CERN, Switzerland October 31, 2013.
URIOT Didier - MYRRHA accelerator 1st International Design Review 11/12/ Instrumentation& operation aspects operation aspects URIOT Didier.
1 st EuCARD 2 annual meeting G Bellodi – CERN WP4 AccApplic Hamburg G Bellodi - CERN / EuCARD2 Annual meeting.
Beam tolerance to RF faults & consequences on RF specifications Frédéric Bouly MAX 1 st Design Review WP1 - Task 1.2 Bruxelles, Belgium Monday, 12 th November.
MA and LLFP Transmutation Performance Assessment in the MYRRHA eXperimental ADS P&T: 8th IEM, Las Vegas, Nevada, USA November 9-11, 2004 E. Malambu, W.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
Copyright © 2014 SCKCEN MYRRHA Multipurpose hYbrid Research Reactor for High-tech Applications A flexible and fast spectrum irradiation facility Eucard2-MAX.
Copyright © 2012 SCKCEN Didier De Bruyn (SCKCEN), with contributions from Rafaël Fernandez (SCKCEN), Luigi Mansani (Ansaldo), Antony Woaye-Hune (AREVA),
Work Package 2 Giacomo Grasso ENEA UTFISSM-PRONOC LEADER Work Package 2 meeting Madrid, May 8, 2012 Current status and organization of the work.
IAEA International Atomic Energy Agency IAEA Activities in the Area of Partitioning and Transmutation Alexander Stanculescu Nuclear Energy Department Nuclear.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
ADSRs and FFAGs Roger Barlow. 7 Jan 2008Workshop on ADSRs and FFAGsSlide 2 The ADSR Accelerator Driven Subcritical Reactor Accelerator Protons ~1 GeV.
The Proposed Materials Test Station at LANSCE Eric Pitcher Los Alamos National Laboratory Presented at the Workshop on High-Power Targetry for Future.
F Project X Overview Dave McGinnis October 12, 2007.
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Fault Tolerance in the MYRRHA superconducting linac
Copyright © 2015 SCKCEN ADS accelerator developments presently on-going for MYRRHA and possibly for the Chinese-ADS Dirk Vandeplassche 1 Eucard-2 — APAE.
Task 2.1: Review of ELSY and Conceptual design & neutronic characterization of the ELFR Industrial Plant Kamil Tuček on behalf of Task 2.1 contributors.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Superconducting Cavity Control & Fault-Compensation Strategy for MYRRHA F. Bouly (LPSC / CNRS), J.-L. Biarrotte (IPNO / CNRS) LLRF-Beam Dynamics Workshop.
Technical Meeting on SP1 DESIGN of IP EUROTRANS FZK December 16, 2003 Presentation of SP1 DESIGN Structure and Contents Up-dates H. Aït Abderrahim.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
A Low Power ADS Demonstrator Hywel Owen School of Physics and Astronomy University of Manchester.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
MYRRHA Prof. Dr. Hamid Aït Abderrahim SCK•CEN
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
1 Superconducting linac design & associated MEBT Jean-Luc BIARROTTE CNRS-IN2P3 / IPN Orsay, France J-Luc Biarrotte, 1st Myrrha design review, Brussels,
Nuclear Physics Researches on HIAF and CIADS facilities in China
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
MARP III R. Schmidt.
General Design of C-ADS Accelerator Physics
ADS reliability requirements
Thales Klystrons for Linacs
Accelerator Reliability requirements for ADS: the MYRRHA project goals
Hosting Orsay Walid KAABI
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Summary of session 5: Innovative Ideas and New R&D
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Challenges and Perspectives of Accelerator Driven Systems (ADS)
European Studies for Nuclear Waste Transmutation
Superbeams with SPL at CERN
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
European Spallation Neutron Source ESNS
CNRS contribution to ESS – 01/02/17
Charge and Agenda of the 18th TAC meeting
Presentation transcript:

1 Overview of the MYRRHA accelerator & presentation of the MAX project Jean-Luc BIARROTTE CNRS-IN2P3 / IPN Orsay, France EURATOM FP7 MAX project coordinator J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

2 1.Background 2.The MYRRHA accelerator concept2.The MYRRHA accelerator concept 3.Review of the MYRRHA linac design3.Review of the MYRRHA linac design J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

3 The MYRRHA project MYRRHA Project Multi-purpose hYbrid Research Reactor for High-tech Applications At Mol (Belgium) Development, construction & commissioning of a new large fast neutron research infrastructure to be operational in 2023  ADS demonstrator  Fast neutron irradiation facility  Pilot plant for LFR technology J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012 See Introduction talk by H. Aït Abderrahim (SCKCEN)

4 The MYRRHA accelerator: background  End 90’s: several collaborative R&D activities worldwide on ADS accelerators (APT/AAA, TRASCO, etc. w/ especially a CEA/CNRS/INFN collaboration)  2001: “The European roadmap for developing ADS for Nuclear Waste Incineration”, European Technical Working Group on ADS (chaired by C. Rubbia, ENEA)  2002: pre-design “Myrrha Draft 1” (cyclotron 350 MeV) J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012  : MYRRHA is studied as one of the 3 reactor designs within the PDS-XADS FP5 project (coord. Framatome/AREVA) (cyclotron turns into linac, first reliability analyses show a need for fault-tolerance capability)

5 The MYRRHA accelerator: background  2005: updated pre-design “Myrrha Draft 2” (linac 350 MeV) J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012  : MYRRHA is studied as the XT-ADS demo within the EUROTRANS FP6 project (coord. FZK) (600 MeV linac conceptual design, R&D activities w/ focus on reliability)  2010: MYRRHA is on the ESFRI list, and officially supported by the Belgium government at a 40% level (384M€, w/ 60M€ already engaged)  : MYRRHA accelerator advanced design phase w/ support from the EURATOM FP7 projects (MAX especially)  : possible construction phase  : possible commissioning phase & progressive start-up

6 MYRRHA within EURATOM FP7: FREYA GUINEVERE experiment SCK●CEN CDT Reactor design SCK●CEN MAX Accelerator design CNRS J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012 See Conclusion talk by R. Garbil (EC)

7 The MAX project J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012 MAX = “Myrrha Accelerator eXperiment, research & development programme” 3 years & coordinated by CNRS  2011 – 2012 – 2013 (February 2011 to January 2014)  Goal of the project = support the transition from the EUROTRANS “conceptual design phase” to the MYRRHA pre-construction “engineering design phase” Pursue the R&D related to ADS-type accelerators, that request a “beyond the state-of-the-art” reliability level  Follow up of FP5 PDS-XADS & FP6 EUROTRANS activities Fine-tune the design of the driver accelerator for the MYRRHA system  To initiate a possible MYRRHA detailed engineering design & subsequent construction phase starting at the end of the MAX project  Key data Call identifier: FP7-FISSION-2010  Collaborative Project – Small/medium-scale Focused (CP-FP) Project cost: 4.9 M€ total cost – 2.9 M€ EU contribution  With a total involvement of about 300 p.m. (8 persons FTE) from 11 partners

8 The MAX project J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012 WP1: Global accelerator design WP2: Injector developments WP3: Main linac developments WP4: System optimisation

9 1.Background1.Background 2. The MYRRHA accelerator concept 3.Review of the MYRRHA linac design3.Review of the MYRRHA linac design J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

10 MYRRHA as an ADS demonstrator Main features of the ADS demo MWth power Highly-enriched MOX fuel Pb-Bi Eutectic coolant & target k eff around 0.95 in subcritical mode 600 MeV, mA proton beam Demonstrate the physics and technology of an Accelerator Driven System (ADS) for transmuting long-lived radioactive waste  Demonstrate the ADS concept (coupling accelerator + spallation source + power reactor)  Demonstrate the transmutation (experimental assemblies) J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

11 Choice of the proton beam energy: 600 MeV  Accelerator cost J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012 Power density deposited in LBE  

12 Choice of the proton beam current: 4mA Current / Energy / Sub-Criticity for a 80 MW therm ADS demo (simulation by ANSALDO) J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

13 MYRRHA proton beam requirements J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012 Proton energy600 MeV Proton beam current2.5 mA (up to 4 mA for burn-up compensation) Allowed beam trip number (>3 sec)<10 per 3-month operation cycle Beam entry into the reactorVertically from above Beam stability on targetEnergy < ±1% Current < ±2% Position & size < ±10% Beam time structureTBD (CW with regular beam interruptions >200µs for k eff monitoring) High power proton beam (up to 2.4 MW) Extreme reliability level

14 The ADS reliability requirement  Beam trips longer than 3 sec must be very rare:  To limit thermal stress & fatigue on the target window, reactor structures & fuel assemblies  To ensure a 80% availability – given the foreseen reactor start-up procedures J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012  Present MYRRHA spécifications: 250h) – derived from the PHENIX reactor operation analysis  Far above present HPPA accelerator performance – MTBF is a few hours at PSI or SNS  Far above present ADS specifications in US or Japan – mainly based on simulations D. Vandeplassche, IPAC2012

15 The ADS reliability requirement  In any case, reliability guidelines are needed for the ADS accelerator design:  Strong design i.e. robust optics, simplicity, low thermal stress, operation margins…  Redundancy (serial where possible, or parallel) to be able to tolerate failures  Repairability (on-line where possible) and efficient maintenance schemes  Beam trips longer than 3 sec must be very rare:  To limit thermal stress & fatigue on the target window, reactor structures & fuel assemblies  To ensure a 80% availability – given the foreseen reactor start-up procedures J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012  Present MYRRHA spécifications: 250h) – derived from the PHENIX reactor operation analysis  Far above present HPPA accelerator performance – MTBF is a few hours at PSI or SNS  Far above present ADS specifications in US or Japan – based on simulations

16 Generic scheme of the European ADS accelerator  Modular SC main linac  Upgradeable concept (demo, transmuter)  Independently-controlled elements  The function of a missing element can be replaced by retuning adjacent elements (“FAULT-TOLERANCE”)  Redundant injector  Fault-tolerance is non applicable (β<0.15)  Minimized number of elements  Spare stand-by injector with fast switching capabilities J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

17 + Operational injector 1: RF + PS + beam ON Warm stand-by injector 2: RF+ PS ON, beam OFF (on FC)  Initial configuration -  The failure is localized in injector The switching magnet polarity is changed (~1s) +  A failure is detected anywhere Beam is stopped in injector 1 by the Machine Protection 0 -  Beam is resumed Injector 2 operational 1 < t 0 +3sec) Failed injector 1, to be repaired on-line if possible Need for an efficient fault diagnostic system ! Strategy for a fault case in the injector J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

18  A failure is detected anywhere → Beam is stopped by the MPS in injector at t 0  The fault is localized in a SC cavity RF loop → Need for an efficient fault diagnostic system  New V/φ set-points are updated in cavities adjacent to the failed one → Set-points determined via virtual accelerator application and/or at the commissioning phase  The failed cavity is detuned (to avoid the beam loading effect) → Using the Cold Tuning System  Once steady state is reached, beam is resumed at t 1 < t 0 + 3sec → Failed RF cavity system to be repaired on-line if possible Fast fault-recovery procedure J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

19 1.Background1.Background 2.The MYRRHA accelerator concept2.The MYRRHA accelerator concept 3. Review of the MYRRHA linac design J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

20 Layout of the MYRRHA linac J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

21 Layout of the MYRRHA linac J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

22 WP1 – Global accelerator design J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012 H. Klein (IAP): MYRRHA injector design (Monday 11:00) J-L. Biarrotte (CNRS): SC linac design & associated MEBT (Monday 11:35) F. Bouly (CNRS): Beam tolerance to RF faults (Monday 14:30) L. Perrot (CNRS): High-energy beam lines (Monday 12:10)  from the CDT work D. Uriot (CEA): Instrumentation & operation aspects (Monday 15:00)

23 WP2 – Injector developments J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012 C. Zhang (IAP): Injector layout & beam dynamics (Monday 15:50) H. Podlech (IAP): Cavity development for MYRRHA (Monday 16:25) D. Vandeplassche (SCKCEN): MYRRHA injector at UCL (Monday 17:00) → towards a MYRRHA R&D platform

24 WP3 – Main linac developments J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012 H. Saugnac (CNRS): Spoke cryomodule design (Tuesday 08:30) R. Paparella (INFN): SC elliptical cavities design & associated R&D (Tuesday 09:05) F. Bouly (CNRS): Fault-recovery procedures & associated R&D (Tuesday 09:40)

25 WP4 – System optimisation J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012 N. Chevalier (ACS): Cryogenic system for the MYRRHA linac (Tuesday 10:30) D. Vandeplassche (SCKCEN): RF and control aspects (Tuesday 11:05) A. Pitigoï (EA): Reliability analysis (Tuesday 11:35) L. Medeiros (SCKCEN): Conclusion (Tuesday 13:50) → Roadmap towards MYRRHA accelerator construction

26 Charge to the review: Q/A Q: What is the goal of the MAX Euratom FP7 project (Feb 11 – Jan 14)?  Deliver a consolidated reference layout of the MYRRHA linac in 2014 so as to initiate its engineering design and subsequent construction phase Q: What is the goal of this MYRRHA linac review ?  Review, at MAX mid-project, the design choices and the technical progress made so far and give recommendations for the forthcoming activities Q: What documentation does the review team need to consider ?  Because we have no fully consistent TDR-like document yet, the review is to be made on the basis of the slides shown at the meeting. Nevertheless, possibly useful additional documentation has also been made available. o EUROTRANS final report on XT-ADS accelerator design (March 2010) o Already issued MAX deliverables: Project presentation (March 2011), Detailed work programme (April 2011), Cryogenic analysis (Jan 2012), Injector conceptual design (Fev 2012) o CDT deliverables on: Myrrha HEBT design (Feb 2012) and instrumentation needs (March 2012) J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

27 Charge to the review: Q/A Q: On which specific points should the review team focus in particular ?  Besides a critical analysis (Findings/Comments/Recommendations) of the various technical contributions, we would like the review team to answer specifically to the following questions: 1)May the adopted general philosophy and methodology lead to the design of a highly reliable accelerator? 2)Are the different design choices appropriate for such a machine? 3)Is the R&D programme coherent, adequately focused and efficient at this stage of the project? 4)In a more global view, what should be the essential points of concern for the MYRRHA project team in the two following years ( ) to prepare for the accelerator construction? J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012

28 Thank You for your kind involvement ! J-Luc Biarrotte, 1st Int. MYRRHA accelerator design review, Brussels, November 12th, 2012