Updated Design of TCLD whit reduced jaw length Collimation Upgrade Specification meeting 18-10-2013 L. GENTINI.

Slides:



Advertisements
Similar presentations
ColUSM #51 30 th January, 2015 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, Q. Deliege, V. Baglin, F. Savary.
Advertisements

F. Savary on behalf of the WP11 team Input from V. Baglin, D. Ramos.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
Actuation and Alignment Challenges of LHC Collimators M. Garlaschè on behalf of the EN\MME collimation team 1 st PACMAN Workshop CERN, Geneva, Switzerland.
1 Integration of collimators in the dispersion suppressors Status of 11 T cryo- assembly integration Dec 17, 2013
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Engineering Department ENEN 16/08/2013 LR - BBC Pre-Study 1 STATUS of BBC DESIGN and ENGINEERING : PRELIMINARY RESULTS G. MAITREJEAN, L. GENTINI.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
1 DS Collimators at IR3: mechanical engineering and design LHC Collimation Upgrade Review Alessandro Bertarelli, Alessandro Dallocchio, Delio.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
Collimation Meeting Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Engineering Department ENEN Screwed solutions for the new tertiary collimator jaw assembly Federico Carra (CERN EN/MME) Geneva, 4 th September th.
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
HRM28-TCDI Updates June 24 th, 2015 Fausto Lorenzo Maciariello, F-X Nuiry, R. Ferriere, K. Karagiannis, M. Butcher, G. Vorraro, S. Le Fouest.
A. Bertarelli – R. Perret CERN TS – MME Group 1 CERN European Organization for Nuclear Research Mechanical Engineering and Thermo-mechanical.
HiRadMat Collimator Jaws HRMT23 03/07/2014EN/MME - E. Berthomé1.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Update on TCTP heating H. Day, B. Salvant Acknowledgments: L. Gentini and the EN-MME team.
AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS240. Integration of Moving Beam Pipe and detector box. 1. Re-collection Layout of moving beam pipe.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
Engineering Department ENEN Consequences and Possible Cause of Elevated Collimator Temperatures Collimation Working Group L. Mettler, F. Carra,
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Movable beam pipe and NNC Study & prototype development Manchester 14/12/20091D. FP meeting.
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Two-beam module layout
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
LCWS11 WG4 Fully featured accelerating structure engineering design
L. Gentini, A. Bertarelli, F. Carra
Review on collimator movement with stepping motors
A. Rossi on behalf of the whole team:
Region between TAXN and D2 in HL-LHC IR1/5: Implications on Collimator Design Alessandro Bertarelli, L. Gentini (EN/MME) On behalf of the LHC.
M. Alcaide Leon, Paolo Fessia
HL-LHC Collimators: Components for absorbers 3rd HiLumi Industry Day - May 2017 Warrington - United Kingdom Oliver Aberle – CERN (EN-STI) On behalf of.
EBTF Design Review Technical Meeting Group
TCTW Collimator Design F. Carra1,2 A. Bertarelli, M. Garlasche, L
2th EuCard Col/Mat WP Meeting
The 11T cryo-assembly: summary of design and integration aspects
Review on collimator movement with stepping motors
LARP Phase II Secondary Collimator RC1
Phase II Collimators : design status
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Phase II Secondary Collimator RC-1
LHC Collimator – RF Contact Concept (180o wrap)
LARP Phase II Secondary Collimator RC-0 and RC-1
Collimator design with BPMs (TCTP)
Cu67 Isotope Radiator & Target
Presentation transcript:

Updated Design of TCLD whit reduced jaw length Collimation Upgrade Specification meeting L. GENTINI

Luca Gentini EN/MME 18/10/2013 2/11 Overview Preliminary design study Actuation system Vacuum tank Jaws Cooling system Instrumentation Status

Luca Gentini EN/MME 18/10/2013 3/11 QTC TCLD Unchanged length New collimator length 1280 mm 100 mm Manual quick connecting flange: unavailable remote handling Sector valves Ion pumps Current QTC

Luca Gentini EN/MME 18/10/2013 4/11 Actuation system “V” interconnection points. Collimator replacement without realignment Collimator Support assembly Alignment assembly The support assembly will be the same of the TCDQ

Luca Gentini EN/MME 18/10/2013 5/11 To be changed Recovered Frame -Partially recovered from existing TCLD actuation system Movement -No jaw tilting -Stroke: 0  25 mm -One step motor each jaw -Spring-back: in case of electrical short-cut the jaws must not go in beam direction Instrumentation -3x LVDT (1x each jaw, 1x anti-collision) -3x switch assemblies (1x each jaw, 1x anti-collision) Alignment -Adjusting assembly with 2x laser trackers To be changed Recovered Jaw actuation

Luca Gentini EN/MME 18/10/2013 6/11 BPM cables Extremity RF contacts General -Active length reduced by 200 mm (1000  800 mm) -Brazed jaws -4x screwed tungsten blocs each jaw -Tapering slopes 10°and 15° -Cantilever jaws Cooling system -Square pipes (9 mm edge, CuNi) -3x cooling pipes in the central cross-section Instrumentation -2x temperature probes (TP100) each jaw -2x Beam Position Monitor each jaw -BPM cables: same electrical length of TCTP with different shape RF system -Ferrite tiles + St. steel screens Vacuum tank based on Ph.II collimator BPM 800 mm 1000 mm Old design New design

Luca Gentini EN/MME 18/10/2013 7/11 Tungsten blocs Ferrite tiles RF screens St. Steel Bloc Support Glidcop Back stiffener Glidcop Tank axis Cooling pipes CuNi 40

Luca Gentini EN/MME 18/10/2013 8/11 BPM Tapering slope : 10° RF screen St. Steel Tapering slope : 15° Screen RF contact CuBe C17410 Extremity RF contact CuBe C17410 RF contact CuBe C17410 Screen RF contact CuBe C17410

Luca Gentini EN/MME 18/10/2013 9/11 Ferrite tiles Tungsten blocs Ferrite tiles

Luca Gentini EN/MME 18/10/ / Study3D modelsDrawingsControlsManufacturing Actuation System100%95%70% 60% Jaws80%70%30%0% Tank100% 50%0% Support100% 0% Jacks70% Test tools30% 20%

Luca Gentini EN/MME 18/10/ /11