Famous Frank’s Queuing Michael Dettloff- Sam Ross Marc

Slides:



Advertisements
Similar presentations
WORKING ENVIRONMENT. FLEXIBLE WORK PRACTICES Society, lifestyles and attitudes in the world have changed and work practices have had to change as well.
Advertisements

Capacity Planning and Queuing Models
Exponential Distribution
Fridge-tag® recording sheet
3. 7 MBPF. Orange Juice Inc. produces and markets fruit juice
Module C8 Queuing Economic/Cost Models. ECONOMIC ANALYSES Each problem is different Examples –To determine the minimum number of servers to meet some.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
Direct Time Study Sections: Direct Time Study Procedure
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Capacity Planning and Queuing Models.
The Central Limit Theorem Section Starter Assume I have 1000 pennies in a jar Let X = the age of a penny in years –If the date is 2007, X = 0 –If.
Nur Aini Masruroh Queuing Theory. Outlines IntroductionBirth-death processSingle server modelMulti server model.
Histograms & Summary Data.  Summarizing large of amounts of data in two ways: Histograms: graphs give a pictorial representation of the data Numerical.
SimLean Educate Interlude 1 – Level the Load Using an example of a generalised simulation of a theatre process.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
Project 2: ATM’s & Queues
Direct Time Study Chapter 13 Sections: Direct Time Study Procedure
Measuring Time.
Let’s learn how to tell time! Created by: D. Baker©2009.
 FACTS :  Departure time : Tuesday 30th September, 2014 at 8.30 pm  Length of flight : 6 hours, 56 minutes  Seoul is 2 hours ahead of Surabaya  ARRIVAL.
Flight Traveling By Emily. Surabaya – Auckland Departure time: Monday, September 29 th at 3:00 a.m. Length of flight: 9 hours and 16 minutes Auckland.
MY fLIGHT pLAN By Josephine. DeStInAtIoNDuRaTiOnTiMe ZoNe Surabaya  Singapore2 hours 13 minutesSingapore is 1 hour ahead of Surabaya Singapore  Suva11.
Time Time is used to compare the durations of events and then intervals between them.
Presentation Timer Select a time to count down from the clock above 60 min 45 min 30 min 20 min 15 min 10 min 5 min or less.
Presentation Timer Select a time to count down from the clock above 60 min 45 min 30 min 20 min 15 min 10 min 5 min or less.
Queuing Models and Capacity Planning
Time Zone BY: Karina / 5C. Surabaya TO Beijing Monday, 17 September 2012 at am Surabaya – Makasar : Length of flight : 6 hours and 30 minutes Beijing.
Purdue University Recreational Sports Center Queuing Megan Jarrett- Cody Jones –
TECH581 Analyze Presentation Fall 2008 Date: 11/11/08 Team Members: xxxxx xxxxx Sound Removed.
Project 2: ATM’s & Queues. ATM’s & Queues  Certain business situations require customers to wait in line for a service Examples:  Waiting to use an.
1 Queuing Analysis Overview What is queuing analysis? - to study how people behave in waiting in line so that we could provide a solution with minimizing.
On your mark! Get Set! READ!! Get your books ready and join us in some reading fun! Our teachers will help kick-off this event with a Pajamas & Reading.
Science Fair Project What is expected?. What is the Scientific Method? The scientific method is a way to ask and answer scientific questions by making.
1 QUEUES. 2 Definition A queue is a linear list in which data can only be inserted at one end, called the rear, and deleted from the other end, called.
Queuing Queues are a part of life and waiting to be served is never really pleasant. The longer people wait the less likely they are to want to come back.
Lesson Objective Understand how we can Simulate activities that have an element of chance using probabilities and random numbers Be able to use the random.
Welcome to College Mathematics Math 1332 Professor von Holstein.
Question 14 Exercise page 341 Carwash. This records our frustration with trying to match our answer with the back of the book. Learning did happen.
Chapter 1 – Science and Measurement
Let’s Tell Time!. What is Time made up of? A.M. Between midnight and afternoon P.M. Between noon and midnight.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Samples from Team Working Agreements Design Process – Mockups.
+ STEM FAIR Parent Information Night. + What is a Good Question? A good question usually begins with one of the following words: Does, Which, What, Do,
Teaching Time. This evening we will be… showing how maths strategies develop across the year groups show you the school’s calculations policy and how.
Time Vocabulary Do you have the time to review? Analog Clock A device for measuring time by moving hands around a circle for showing hours, minutes,
Science Fair Informational Night
Simulation in Healthcare Ozcan: Chapter 15 ISE 491 Fall 2009 Dr. Burtner.
 Recall your experience when you take an elevator.  Think about usually how long it takes for the elevator to arrive.  Most likely, the experience.
Harry’s Queue Patterns Chris Meyer: Joe Stinolis: Mark Burchnall
Uniform Problem A subway train on the Red Line arrives every 8 minutes during rush hour. We are interested in the length of time a commuter must wait.
LANGUAGE ARTS This week we will continue our unit, “On the Farm and Farm Animals.” We will discuss why farms and farm animals are so important to people.
Mass / g Time / min
CONFIDENTIAL1 Good Afternoon! Today we will be learning about Calendar and Years Let’s warm up : Complete the conversion tables: Hours478 Minutes 1) Calculate.
TIME AND CLOCK Made for third graders. LET’S LEARN ABOUT TIME There are 24 hours in a day, and these hours are divided into a.m. and p.m. a.m. meaning.
My Plan to Go to Around the world By: Benedict/5C.
CIS 2033 based on Dekking et al. A Modern Introduction to Probability and Statistics B: Michael Baron. Probability and Statistics for Computer Scientists,
COE Biology Review of Key Terms Reliability Validity Field Study.
12hour and 24hour time Can you convert the times?
Lesson Concept: Histograms and Stem-and-Leaf Plots
Models of Traffic Flow 1.
Do you have the time to review?
Measurement Method & Combined Results Obtained for Vehicle Flows and Queues measured in Quorn 16th and 23rd April 2018.
Transportation Engineering Basic Queuing Theory February 18, 2011
How long must the plant operate on peak days?
Car Park Survey April 21st-23rd 2016.
مهندسی مجدد فرآیندهای تجاری
Queuing Models and Capacity Planning
Elapsed Time.
A film starts at 13:45 and lasts for 1 hour and 35 minutes
Local Habitat Sampling
Do you have the time to review?
Presentation transcript:

Famous Frank’s Queuing Michael Dettloff- Sam Ross Marc

The Famous Franks group analyzed the queuing line at Famous Franks Food Truck. We determined how long it takes for someone getting in line to get their food. This was done by counting the number of people in line every minute for one hour, along with the time it takes random people to get their food throughout the hour. To collect the data, we used a stopwatch, a notebook, and a pen/pencil. At 11:30pm, one group member started the stopwatch, and another group member recorded the number of people in line. Every minute for the next hour (until Midnight), the person with stopwatch let the other group member know when a minute is up, and the number of people in line was recorded. Every five minutes, the person that was at the back of the line was timed to see how long it takes for them to get their food. That gave us twelve queue wait time recordings. From this data taken, our group was able to determine the average wait for a person, and determine the longest queuing time was as well as when the longest wait was. We plotted the queue length versus time and also the queue wait time versus time. The data was collected on a Thursday, Friday, and Saturday night. The Experiment

Location of Famous Franks

Data Collection The data was collected October 15 th, 16 th, and 17 th The data was collected from 11:30pm to 12:30am on those given dates Task: 11:30pm – 12:00am -Mike: Stopwatch -Ross: Recorder 12:00am – 12:30am -Sam: Stopwatch -Marc: Recorder The power point was completed by all members of the group Resources Used: Notebook, pen/pencils, stopwatch, clipboard, Famous Franks

Thursday ResultsFriday Results

Saturday Results

Photos of Famous Frank’s

Our Famous Frank’s group expected to learn about the effect on the queue wait time, caused by the queue length. We felt that the Famous Frank’s Line demonstrated how capacity is dealt with and how the queue varies with time. The results that were calculated from the data is: –THURSDAY: Average Queue Length-3.76 people, Average Queue Wait minutes –FRIDAY: Average Queue Length- 4.1 people, Average Queue Wait minutes –SATURDAY: Average Queue Length people, Average Queue Wait – minutes We observed that as the queue length became larger there was a less amount of people forming at the rear. When the queue length was short, people were more willing to join the line. Its was observed that the queue time was not dependent on what the costumer ordered. This was not what we had expected. However the reason for this was because the orders were given out based upon when they were finished not when they were ordered. RESULTS

The peak 15 min different for all three nights DayPeak 15 minPeak 15 min x 4PHF Thursday: 12:15-12:3083 people0.68 Friday:11:47-12:0296 people0.64 Saturday12:03-12:1890 people 0.68 These results Confirm that there is a common Peak Hour Factor but not a common Peak 15 min. The results we obtained were both what we expected and not what we expected. The data recorded proved that queue line are dependent on the arrival rate, the service rate and the total time shut down are all important factors. We also found that in food services factors such as patience, item ordered, hunger and location are all very important in the determination of the queue line. In the food industry people are more willing to get food if it is easier and less apt to get food if it is more difficult. RESULTS Continued