Early Career Internal Review Measurement of Double DVCS using SuperBigBite Spectrometer Nuclear Physics Alexandre Camsonne.

Slides:



Advertisements
Similar presentations
Workshop on N* excitations at high Q 2 with CLAS12 Page 1 Workshop on N* Excitations at High Q 2 Welcome to Participants in the Workshop on Nucleon Resonance.
Advertisements

LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Micromegas for CLAS12 Central Detector - Update Franck Sabatié November 19th 2009 Micromegas option for the Central Detector Why, Where, How ? R&D milestones.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” LC-TPC-LBL 18-Oct Tracking Detector R&D at Cornell University and.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
TE/MPE/EM/PMT Collaborations Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
Neutron Structure Functions and a Radial Time Projection Chamber The Structure of the Neutron The BoNuS Experiment at CLAS A New Proton Recoil Detector.
Possibility for Double DVCS measurement in Hall A Alexandre Camsonne SBS Meeting June 4 th 2013.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
CERN workshop upgrade Aida fund Transfer to industry Rui De Oliveira 4/13/20111Rui De Oliveira.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
RESEARCH and DEVELOPMENT for CBM (at LHE JINR) Yu.V. Zanevsky Laboratory of High Energies JINR, Dubna - NEW INFRASTRUCTURE - FAST GAS DETECTORS - DIPOLE.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
WP4 STATUS AND OUTLOOK Hartmut Hillemanns TTN Meeting, December
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Developing Imaging Calorimeters for a SiD-Flavor Lepton Collider Jacob Smith Linear Collider Physics School Ambleside,England 2009.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
Transverse Momentum Dependence of Semi-Inclusive Pion and Kaon Production E : Spokespersons Peter Bosted, Rolf Ent, Hamlet Mkrtchyan 25.5 days.
TPC/HBD R&D at BNL Craig Woody BNL Mini Workshop on PHENIX Upgrade Plans August 6, 2002.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne VI. Nuclear Physics (NP)
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  WBS’s  WBS 1  Funding profile  Schedule  Critical.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne November 18 th 2011 VI. Nuclear.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Early Career Internal Review Research and development in superconducting detectors and associated electronics for high rates experiments. Study of radiation.
1/28 VISITS TO COMPASS / NA58 Seminar for guides 9 March 2005 Susanne Koblitz Gerhard Mallot.
LAPP Introduction Catherine ADLOFF for Yannis KARYOTAKIS.
Stephen Wood NPS Collaboration Meeting November 19, 2014 Hall C Status And Lab Perspective on NPS.
Feasibility studies for DVCS and first results on exclusive  at COMPASS DVCS studies Physics impact Experimental issues Recoil detector prototype Exclusive.
TPC R3 B R3B – TPC Philippe Legou Krakow, February nd
Hall A Update Thia Keppel User Group Board of Directors January 2015.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Development of 100 MHz trackers
Electronics for GEM R&D at the University of Virginia
U.Frankenfeld GSI Darmstadt
Recent DHCAL Developments
IHEP group Shashlyk activity towards TDR
Hall A Compton Electron detector overview
during Fall GMp run (high current)
for meson spectroscopy
Upgrade of the GlueX Spectrometer for Physics with Strange Final States Nuclear Physics Yi Qiang Nov. 13, 2011.
Possible parasitic measurement during Fall GMp run
SOLID Collaboration Meeting
LC Calorimeter Testbeam Requirements
Presentation transcript:

Early Career Internal Review Measurement of Double DVCS using SuperBigBite Spectrometer Nuclear Physics Alexandre Camsonne

Early Career Internal Review Executive Summary/Abstract Measure Double DVCS in muon channel at high luminosity Muon channel allows to increase luminosity since muons can go through large amount of materials Build a bulk Micromegas Laboratory for R&D for muon detector Use 2D shower profile to discriminate between pion and muons using Micromegas readout 1 plane 2m x 1m with 10 cm lead Reuse SuperbigBite magnet, GEM chambers and Hadron calorimeter and add 3 layers of materials and 2D trackers with Neutron detector lead wall

Early Career Internal Review Specific Scientific Aims Better constrain GPDs by having data at xi different from x Allow easy interpretation of the data by having muons in final state Can use as base for muon ID for larger acceptance detector –CLAS12 –SoLID

Early Career Internal Review Sampling calorimeter Prototype of hadron calorimeter using the Micromegas technology for Hadron Calorimeter for EIC with Annecy IN2P3 laboratory 1 m3 detector with 40 layers of iron/micromegas Most cost in readout electronics

Early Career Internal Review Research Impact and Benefits Summarize the impacts and benefits of your proposed research to: Jefferson Lab Measurement of Double DVCS in muon channel Micromegas lab for maintenance and R&D, alternative to GEM with fast turn around Nuclear Physics (and other project offices if applicable) Micromegas licence : production of detector size up to 55 cm x 70 cm Office of Science Detector R&D, reduce cost of detector with industrial partner

Early Career Internal Review Resources Needed Summarize the resources which you will need for the project Your time 50 % If applicable, 3 month/man Designers, 1 month/man Engineers, 7 month/manTechnicians, 5 year post-docs and 5 year graduate students from ODU CEA Saclay : 10 m x 10m Clean room with machines Machine shop : manufacturing detector support Staging area for mounting and testing detector

Early Career Internal Review Schedule and Milestones M : Milestone R : resultQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Machines order 340K Clean room setup 133K Training 3 people 181 K Production 3 people 253K262K428K250K SRS readout 100K HV 156K Small Micromegas prototype 10K Large Micromegas 205K Detector support design Detector support construction 81K Beam in Hall A DVCS A1n Tritium PREX SBS starts Test parasitic, low luminosity Run dedicated experiment Ready to take data Man power : 1.4 M$ Supplies / detector : 1.1 M$