Dfernandez Computing & Controls Dec 3/4 MaxIV Control Systems for Accelerators and Automation 2015-12-03 David Fernández. ALBA Computing & Controls.

Slides:



Advertisements
Similar presentations
Data flow: Main operation: From operation mode program via file operators to file operator servers Trigger generator: Trigger information will be distributed.
Advertisements

The Implementation of Top Up Operation at the Australian Synchrotron Light Source Don McGilvery.
P4 Shutter Review May, 2005 P4 – ID Movable Beam Stop and Integral Shutters Presented by K. Beyer and T. Lutes.
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
Beam Diagnostics for ADS Dirk Vandeplassche SCK  CEN EUCARD-2 — MAX Accelerators for ADS CERN, March 2014.
CLS Machine Status Displays System Analyst - Controls Canadian Light Source Inc. web: Perimeter.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
The applications of FA-M3 PLC used in SSRF ZHOU Dayong
XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Francis Perez ALBA Status.
Example The following figure shows a reaction system in which the temperature increases with the feed rate of flow-controlled stream D. Heat is removed.
F. Fernandez 28/10/ Ferran Fernandez WAO2014 Operators training experience at the ALBA synchrotron light source.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
NSLS/BNL PLC Choice Elliott Wolin 6-Jan-2010 Following are a few slides from a much longer presentation BNL chose Allen-Bradley – three month evaluation.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Unit 3a Industrial Control Systems
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
SSRF Beamline Control System
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
LSST Workshop Bremerton, WA August, LSST Workshop Bremerton, WA August, 2015 Camera Protection System Martin Nordby Chief Mechanical Engineer LSST.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
FAIR Accelerator Controls Strategy
DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007 Status of Alba Controls.
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Integrated Testing George Ganetis Integrated Testing ASAC Review October 14-15, 2010.
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
Definition: Automation is the use of control systems for operating equipment with minimal or reduced human intervention. + save labour + reproducibility.
1 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications Infrastructure and Current Status Guobao Shen, Lingyun Yang* Controls Group & Accelerator Physics.
First Workshop on the Operation of LArge Vacuum Systems, April 11-12th 2005, CERN, Geneva, Switzerland G. Y. Hsiung -1 The Vacuum Interlock System for.
I & C.
1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007.
Employment of scada system in water purification and transmission system.
Interlock Systems for Machine Protection Manuel Zaera-Sanz Interlocks Engineer – ICS / Protection Systems AD and ICS Retreat mtg December 2014.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Take 5 for Safety E. Lessard January 19, Credited Controls  Credited controls: controls determined through safety analysis to be essential for.
Machine Protection Requirements and Concept Annika Nordt et al. European Spallation Source ERIC Machine Protection Review, December 2015 Lund, Sweden.
Andreas Lüdeke, Trieste, 24. Sep., WAO '07 Operation Information Management at the Swiss Light Source Andreas Lüdeke of the Swiss Light Source at the Paul.
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Report Technical Director Storage-Ring-Installation Completed
Operations Machine Simulator.
Presented by Li Gang Accelerator Control Group
Operators and Radiation Safety at the Advanced Light Source
1v0.
Controls CBETA controls will extend existing EPICS control system
PLC Workshop Adrian Oates Daresbury Laboratory Warrington Cheshire UK.
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Personnel Safety Systems
Ion Source and LEBT control system topology, Interlock strategy
TS2 PSS Architecture, Concepts of Operations and Interfaces
PLC Front Panel.
MPS commissioning at ESS
The spoke CM tests at FREIA
Safety Analysis and Safety Functions
PLC Front Panel.
E. Michael Saleski PPS and BCS Systems Manager
Safety Readiness Review (SRR) Thomas Hansson, ESH
TS2 PSS; update on concepts of operation and system's architecture
Operation of Target Safety System (TSS)
Radiation Detectors for the PSS1 at ESS
Edwards S1, Arklay C1, Crameri S1, May A2, van Driel R1 and Hyatt AD1.
Presentation transcript:

dfernandez Computing & Controls Dec 3/4 MaxIV Control Systems for Accelerators and Automation David Fernández. ALBA Computing & Controls

dfernandez Computing & Controls Dec 3/4 MaxIV

dfernandez Computing & Controls Dec 3/4 MaxIV Different views at different levels SUBSYSTEMS Power supplies Vacuum RF Insertion Devices Diagnostics (BPM, BLM, etc. (SRM, FS, FCT, Scrappers…) Linac / Booster (both can be subdivided in the subsystems)…... TRANSVERSAL subSYSTEMS Timing/Synchronization, Equipment Protection Sys. Personnel Safety Systems. TRANSVERSAL-SOFTWARE Alarm System Archiving System

dfernandez Computing & Controls Dec 3/4 MaxIV 4 EPS PSS PLC based systems: Equipment protection and Personnel protection

dfernandez Computing & Controls Dec 3/4 MaxIV Personnel Protection –Intrusion –Search procedures –Access control –Radiation monitors Equipment protection –Water interlocks –Temperatures –Actuators –Logic of valves and vacuum itlks –RF, Vacuum Eq. IDs, etc. –Logic of shutters –Interfaces with timing –… Hundreds of signalsThousands of signals

dfernandez Computing & Controls Dec 3/4 MaxIV Interlocks and Equipment protection

dfernandez Computing & Controls Dec 3/4 MaxIV Defining procedures. “Ad hoc”: Injection procedures (Top-Up)

dfernandez Computing & Controls Dec 3/4 MaxIV Timing Injection Filling patterns Top-up …

dfernandez Computing & Controls Dec 3/4 MaxIV Timing

dfernandez Computing & Controls Dec 3/4 MaxIV Start / Stop Orbit feedback.

dfernandez Computing & Controls Dec 3/4 MaxIV Alarm handling Defined by the Operators: Historic archive Manage states, Acknowledgment, actions, persistence, receivers, …

dfernandez Computing & Controls Dec 3/4 MaxIV Alarm handling & Automation

dfernandez Computing & Controls Dec 3/4 MaxIV Alarm handling & Automation (Panic app. HowTo)

dfernandez Computing & Controls Dec 3/4 MaxIV Incidences Operators face a certain number of incidences (logbook(PSI) and RT) “From the CR we heard a noise like a little explosion and immediately after there was the PANIC alarm regarding Bo PS”

dfernandez Computing & Controls Dec 3/4 MaxIV Summary Protection systems Transversal systems Predefined sequences (i.e. filling patterns) Alarm handling. Recovery methods Ways to define and automatize procedures (profit from the experience of the operators) Many thanks!