Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo.

Slides:



Advertisements
Similar presentations
RPC project Upgrade phase I Pierluigi Paolucci. RPC system in the forward region The forward region of the RPC project consists of: 4 disks equipped with.
Advertisements

Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
RPC tasks and manpower P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.
RPC project chart Pigi Paolucci. RPC structure Project Manager1 0 level Deputies - Resource Manager2 0 level Istitution – Editorial – Conference2 0 level.
CERN, 14 May Italy D.Boscherini. Budget disponibile CapitolokE Consumo75 M.E.20 Personale25 Totale120.
Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
RPC M&OB status Pigi Paolucci. Summary 2010 Cash Contributions foreseen CHF 2010 Expenditures (2009 carry over) CHF Present Income Balance.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
Data Quality Monitoring for CMS RPC A. Cimmino, D. Lomidze P. Noli, M. Maggi, P. Paolucci.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
MuonDPG/RPC M. Maggi INFN Bari. DQM tool for the DCS data Control Analysis Tool (CAT) by Cimmino, Lomidze, Paolucci, Polese To 1.Make custom DCS data.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
International Certification Services Pvt Ltd.
Run Coordination Report 4th RPC General Meeting (CMS week) Luigi BENUSSI, Hassan SHAHZAD, Nicolas ZAGANIDIS.
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
CMS Databases P. Paolucci. CMS DB structure HLT-CMSSW applicationReconstruction-CMSSW application FronTIER read/write objects.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
1 st RPC General Meeting 29 March 2011 Pigi Paolucci RPC project status.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
64 th PRC, DESY, Nov 2007 Wolfram Zeuner 1 CMS On Behalf of the DESY-CMS Group Wolfram Zeuner Organization Trigger & DQM Computing – CSA07 Tracker.
Umesh Joshi Fermilab Phase 1 Pixel Upgrade Workshop, Grindelwald August , 2012 CMS Pixel & HCAL Databases (An Overview)
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
Data Quality Monitoring for the CMS Resistive Plate Chamber Detector Anna Cimmino etc etc etc Università degli Studi di Napoli “ Federico II ” & INFN of.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
ALICE RRB-T ALICE Computing – an update F.Carminati 23 October 2001.
Muon Upgrade Simulations Status. Muon Upgrade Goals  Muon upgrades aim to achieve the following:  Sustain triggering at current thresholds up to |h|=2.4.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: Implementation Plan.
CMS Muon detector from LHC to HL-LHC Pigi Paolucci INFN Napoli 1P. Paolucci (CMS group of Napoli) - Jan 2015.
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
D. Piccolomeeting RPC Italia - Ischia september CRAFT08 paper status D. Piccolo Laboratori Nazionali di Frascati INFN.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
Silvia Costantini RPC General Meeting CMS week 15 June 2010.
P. Paolucci G. Pugliese M.Tytgat
Jacek Otwinowski (Data Preparation Group)
HCAL Database Goals for 2009
RPC Data Certification
Monitoring of radiation and environmental parameters at GIF++
Jacek Otwinowski (for the DPG QA tools and WP7 groups)
Online SW, DB & Calibration
Level 1 (Calo) Databases
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
EU Institution Board 1 representative of each participating institute
Handling online information in the LHCb experiment
QA tools – introduction and summary of activities
HV & LV status LV system in W+1 and W+2 is OK
23 Barrel chambers and 12 Endcap chambers
ورود اطلاعات بصورت غيربرخط
DQM for the RPC subdetector
HV & LV status LV system in W+1 and W+2 is OK
23 Barrel chambers and 12 Endcap chambers
Presentation transcript:

Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo K. Bunkowski Tech. Coordinator S. Buontempo deputy Tech. Coordinator S. Buontempo deputy Istitution Board chairman Resource manager P. Paolucci Steering committee Conference Committee chairman Conference Committee chairman Upgrade chairman Upgrade chairman Editorial board chairman Editorial board chairman

Project Manager (P. Paolucci) deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo K. Bunkowski Tech. Coordinator S. Buontempo deputy Tech. Coordinator S. Buontempo deputy Physic Valid Tool Resp. Physic Valid Tool Resp. CAF Resp. CAF Resp. P5 Resp. P5 Resp. Maint & repar resp Maint & repar resp Offline D. Piccolo Offline D. Piccolo Online K. Bunkowski Online K. Bunkowski Detector & trigger analysis C. Carillo Detector & trigger analysis C. Carillo Resource manager (P. Paolucci) Steering committee Elect. Coord. Resp. Elect. Coord. Resp. Gas Resp. Gas Resp. Upgrade Resp. Upgrade Resp.

DPG (D. Piccolo) K. Bunkowski DPG (D. Piccolo) K. Bunkowski Run Coordinator (G. Pugliese) deputy Run Coordinator (G. Pugliese) deputy SoftwareValidation/ Data Certification J. Gho SoftwareValidation/ Data Certification J. Gho Detector perfromance Calabria Korea Detector perfromance Calabria Korea Online K. Bunkowski Online K. Bunkowski Offline Piccolo Offline Piccolo Detector & trigger analysis Carrilo Detector & trigger analysis Carrilo Phys Valid Tool S. Costantini Phys Valid Tool S. Costantini Trigger perfromance Korea Warsaw Trigger perfromance Korea Warsaw Calibration Streams Maggi Calibration Streams Maggi WBM Berzano WBM Berzano Run Quality Noise tools Costantini DQM Cimmino DQM Cimmino Skims Tupputi Skims Tupputi Upgrade Simulation Simulation Pavlov Local Reco C. Carrillo Local Reco C. Carrillo DataBase Trigger DB M Szlepper Trigger DB M Szlepper Configuration K. Bunkowski PVSS Detector DB

PEOPLEDPGRun coordinationTechnical coordination D. PiccoloG. PuglieseS. Buontempo deputy K. Bunkowski (Wa) ?? M. Maggi (BA)A. Dimitrov (CERN)* S. Tupputi (BA)A. Colaleo (BA)L. Benussi (LNF) M. Koneki (Wa)L. Benussi (LNF)H. Shahazad (PK) B. Pavlov (SO) P. Iaydjiev (INRNE)* P. Paolucci (elect) K. Lee (KU)H. Shahazad (PK)I. Crotty (CERN) Y. Choi (SKK)N. Zaganidis (Ghent) A. Ocampo (UNI) Detector & trigger analysisCAF/OM C. Carillo (NA)A. Cimmino (GH) C. Calabria (BA)S. Costantini (GH) Tae Jong Kim (KU)N. Zaganidis (Ghent) H. Seo (SKK) Monitoring Tools A. Cimmino (GH) - S. Costantini (GH) M. Rodozov (INRNE)* - U. Berzano* (CERN)

TASKSDPGRun coordinationTechnical coordination D. PiccoloG. PuglieseS. Buontempo Online - K. Bunkowski (Wa)A. Dimitrov (CERN)* PVT - M. Maggi (BA)A. Colaleo (BA)Gas - L. Benussi (LNF) Offline - S. Tupputi (BA)L. Benussi (LNF)H. Shahazad (PK) Trigger - M. Koneki (Wa) P. Iaydjiev (INRNE)* Elect - P. Paolucci Simulation - B. Pavlov (SO)H. Shahazad (PK)I. Crotty (CERN) Database - ?N. Zaganidis (Ghent) Offline - Y. Choi (SKK) - K. Lee (KU) Run Valid - J. Goh (SKK) Detector & trigger analysisCAF/OM Offline - C. Carillo (NA)A. Cimmino (GH) ? - C. Calabria (BA)S. Costantini (GH) ? - Tae Jong Kim (KU)N. Zaganidis (Ghent) ? - H. Seo (SKK) Monitoring Tools DQM - A. Cimmino (GH) – Noise - S. Costantini (Ghent) Noise - M. Rodozov (INRNE)* -WBM - U. Berzano*