Announcement Course Exam October 6 th (Thursday) In class: 90 minutes long Examples are posted on the course website.

Slides:



Advertisements
Similar presentations
HVAC 13a CNST 305 Environmental Systems 1 Dr. Berryman
Advertisements

Chapter 3. HVAC Delivery Systems
BUILDING AIR CONDITIONING
CON 4003 Construction Estimating Prof R. V. Locurcio.
Heating, Ventilating, and Air-Conditioning
TYPES OF MECHANICAL SYSTEMS
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Geothermal Retrofit of HVAC Systems
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
Mechanical Engineering Department  Temperature Control  Cooling  Heating  Humidity Control  Humidification  Dehumidification  Air Quality Control.
BASICS OF HVAC Ivy Tech Community College. Definitions – Page 862 HVAC systems are made up of the mechanical equipment such as the furnace, air conditioner,
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Announcement Course Exam October 6 th (Thursday) In class: 90 minutes long Examples are posted on the course website.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Objectives Review/Learn about HVAC Configurations Describing systems and processes in the psychrometric chart Analyze processes in AHU and buildings –Finish.
Air Conditioning Systems
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
SOLAR CHILL SOUTHWEST SOLAR PUMP POWER IN FAN MOTOR PAD MEDIA PUMP BOARD.
Lecture 16: Zone Air Paths and Air Distribution Units
Important variables Water: Air: Conversion:
Designing Solar PV Systems (Rooftops ). Module 1 : Solar Technology Basics Module 2: Solar Photo Voltaic Module Technologies Module 3: Designing Solar.
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
November 19, 2013 Agenda 1.Roll 2.PowerPoint titled: Heat Technology 3.Video “Head Rush: Liquid Nitrogen Balloon”
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
How a Heat Pump Works By: Adam Meeker. What is a Heat Pump? A heat pump is a device which transfers heat energy from one place to another.
N O R T H A M E R I C A C O M M E R C I A L TDP
STUDY ON HVAC SYSTEM STUDY ON HVAC SYSTEM
Why can’t heat be converted completely into work?.
Course project presentation Thursday in class Timing: 4 minutes (strictly controlled) Approximately 1 PowerPoint Slides per minute Content Problem Introduction.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Systems and Applications Basic Types Direct Expansion Air-WaterAll-AirAll-Water.
Lecture Objectives: Discuss Project 1 and Final Project Learn about Photo Voltaic systems –Discuss HW3 Discuss system of equations solvers - learn what.
Announcements 1) Thursday 02/09 In class Midterm Exam - I will be in the classroom at 9:20 AM - Example and solution are posted on the course website 2)
Lecture Objectives: -Discus Final Project -Learn about Solar Systems -HW3 (final HW assignment) -HVAC system.
Lecture Objectives: Discuss exam questions
Final Projects Grading criteria is posted on the course website Preliminary results are due Next Tuesday Final Project delivery on Monday Dec. 7 th –Final.
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Lecture Objectives: Differences in Conduction Calculation in Various Energy Simulation Programs Modeling of HVAC Systems.
Objectives Talk about the final projects Guest Speaker Discuss HW2 and HW3 problems.
Announcement Course Exam: Next class: November 3rd In class: 90 minutes long Examples are posted on the course website.
Final Project Format and Deliverables Examples
Final Project I need your proposal about the final project! It should include –Title –Group members –Objective –Short description –Methodology –Expected.
Announcements Next class is the course evaluation
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Announcement ! Apply if you have interest in
Lecture Announcement Developing Concrete with a Structural and Thermal Insulation Performance and Homogenous and Stratified Approach Dr. Mauricio Lopez.
Lecture Objectives: Discuss exam questions
Lecture Objectives: Photo Voltaic & Solar Hot Water Systems
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Types of HVAC Technology Used in Business Establishments
Lecture Objectives: Discus Final Project Learn about Solar Systems
Lecture Objectives: Answer questions related to HW 4
Lecture Objectives: Finish with HVAC systems
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Discuss Project 1 and Final Project
Notes 7: Using Heat Chapter 6 Section 3 Page 172.
Lecture Objectives: Answer questions related to HW 4
Objectives Discuss Project 1 (eQUEST) Learn about HVAC Systems
October 31st In class test!
Lecture Objectives: Discus Final Project Learn about Solar Systems
Lecture Objectives: Discuss HW4 parts
Announcements Exam 1 Next Class (Thursday, March 14th):
Objective Revie the Cooling Cycle Learn about air distribution systems
Presentation transcript:

Announcement Course Exam October 6 th (Thursday) In class: 90 minutes long Examples are posted on the course website

Lecture Objectives: Answer questions related the Project 1 and the Final Project Continue with Photo Voltaic (PV) and hot water systems Discuss HW3 Learn about the impact of HVAC system on energy consumption - overview HVAC systems

Requirement for the project Undergrad students: Team project (2 or 3 members) Grad students: Individual effort me (till next Friday): Final project group members Project title One paragraph ( words) including - Project objective -Methodology -Expected results Any schematic drawing is welcome

HW3 Design of zero energy house Install a PV system on your house from your project 1-a

PV system Silicon crystal base Tin film

Hot Water Solar

HW3 Redefine house in Project 1 to be more realistic. a) Find the optimum orientation and positioning angle for your PV solar collectors. b) Size the PV system that will enable that your house became net zero energy house. c) Add an electric hot water heater and calculate the new PV system size. d) Size a hot water solar collector system for your hot water consumption. e) Calculate the number of days when you need to use electric heater and how much energy is consumed by the backup electric heater.

eQUEST HVAC Models Predefined configuration (no change) Divided according to the cooling and heating sources Details in e quest help file: For example: DX CoilsNo Heating –Packaged Single Zone DX (no heating) Packaged single zone air conditioner with no heating capacity, typically with ductwork. –Split System Single Zone DX (no heating) Central single zone air conditioner with no heating, typically with ductwork. System has indoor fan and cooling coil and remote compressor/condensing unit. –Packaged Terminal AC (no heating) Packaged terminal air conditioning unit with no heating and no ductwork. Unit may be window or through-wall mounted. –Packaged VAV (no heating) DX CoilsFurnace Packaged direct expansion cooling system with no heating capacity. System includes a variable volume, single duct fan/distribution system serving multiple zones each with it's own thermostatic control. –Packaged Single Zone DX with Furnace Central packaged single zone air conditioner with combustion furnace, typically with ductwork. –Split System Single Zone DX with Furnace Central single zone air conditioner with combustion furnace, typically with ductwork. System has indoor fan and cooling coil and remote compressor/condensing unit. –Packaged Multizone with Furnace Packaged direct expansion cooling system with combustion furnace. System includes a constant volume fan/distribution system serving multiple zones, each with its own thermostat. Warm and cold air are mixed for each zone to meet thermostat control requirements.