1 ICP – data collection Model work plan Seminar for regional coordinators Washington DC, 17-21 May 2004.

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop MICS4 Technical Assistance.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop The MICS4 Process.
RESULTS BASED PARTICIPATORY BUDGETING South-South Partnership Programs and Peer-to- Peer Learning.
GDP comparison basing on purchasing power parities in the CIS countries.
Regional progress report: Eurostat/OECD September 2005: Washington DC David Baran, ONS - UK.
National manuals Kick-off meeting on Joint Action on the pilot EHES, Luxembourg, 21 January 2010.
Quality assurance Kari Kuulasmaa 1 st EHES Training Seminar, February 2010, Rome.
Neighbourhood Planning - A Local Authority Perspective Beryl Guiver Principal Planning Policy Officer Tom Rice Planning Enquiry Officer.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
Early Warning System for CD Dr Venanzio Vella, Senior Epidemiologist, CEEN.
Regional Coordinators Meeting September 28-30, 2009 Washington DC Data Process, Management, and Transmission Chart, and Access Policy Nada Hamadeh Statistics.
Barbara M. Altman Emmanuelle Cambois Jean-Marie Robine Extended Questions Sets: Purpose, Characteristics and Topic Areas Fifth Washington group meeting.
Team Composition and Team Role Allocation in Agile Project Teams Brian Turrel 30 March 2015.
© The McGraw-Hill Companies, Software Project Management 4th Edition Managing contracts Chapter 10.
1 Walk-in slide. 2 How to Manage a System Upgrade The Good, The Bad and The Ugly of Conversions David Cervelli Managing Consultant April 25, 2006.
AUDIT PROCEDURES. Commonly used Audit Procedures Analytical Procedures Analytical Procedures Basic Audit Approaches - Basic Audit Approaches - System.
Chapter 9 Employee Development
MASTERING THE RFQ PROCESS Genanne Wilson, DJJStu Potlock, DMS Gina Gibson, STOBill Zimmerman, DOHVonnie Allen, AWI Department of Management Services Division.
Regional Coordinators Meeting September 28-30, 2009 Washington DC Machinery & Equipment: Using Exchange Rates as PPPs for M&E.
Software project management
Instructional System Design
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Survey on Institutional Arrangements for NMHSs.
S/W Project Management
THE SUPPORTED EMPLOYMENT PROGRAMME OPPORTUNITIES AND CHALLENGES TOM RONAYNE WRC SOCIAL AND ECONOMIC CONSULTANTS IASE Conference
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
Module CC3002 Post Implementation Issues Lecture for Week 1 AY 2013 Spring.
December To share best practices from the experience of 100 NSDS implemented over the last years. To take into account international community.
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
International Comparison Program (ICP) Overview of 2003 Round Workshop Goals and Objectives Fred Vogel, Global Manager.
Latin America Progress Report Presented to the World Bank Regional Workshop 7 March 2005.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
International Comparison Program Regional Coordinator Workshop Washington, DC May 17-21, 2004.
Planning appeals Peter Ford Head of Development Management Planning Committee Training – 30 th July 2015.
S14: Analytical Review and Audit Approaches. Session Objectives To define analytical review To define analytical review To explain commonly used analytical.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys Addis Ababa,
Compilation of Distributive Trade Statistics in African Countries Workshop for African countries on the implementation of International Recommendations.
New challeges in rules of origin Rafael Cornejo Word Bank Videoconference Washington DC june 16, 2005.
1 A decade of revisions at UNCITRAL Special Course 6 – James Castello Lecture 3 Arbitration Academy PA R I S SUMMER COURSES
A Key Component for ICP 2004 A well-established product list  Compare „ like with like “  Collect prices for relevant products  Establish reliable PPPs.
ICP Progress Report Western Asia Region ICP Regional Coordinators Workshop September 2005 World Bank, Washington D. C.
Latin America Progress Report Presented to the World Bank Regional Workshop 13 September 2005.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
ICP Tool Pack ICP Regional Coordinators’ Meeting Washington, DC May 19, 2004 Vilas Mandlekar The World Bank.
International Auditing and Assurance Standards Board Related Parties ISA Implementation Support Module Prepared by IAASB Staff October 2009.
Project management Topic 2 Planning.
Mid-Decade Assessment of the United Nations 2010 World Population and Housing Census Program Arona L. Pistiner Office of the Associate Director for 2020.
Developing a programme for the implementation of the 2008 SNA and supporting statistics Seminar on Developing a programme for the implementation of the.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of the MICS Process.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
Analytical Review and Audit Approaches
1 Chapter 19: Evaluating Performance Coaching Essentials of Performance Evaluation Making the Evaluation The Appraisal Interview Follow-Up Legal Aspects.
United Nations Regional Workshop on the 2010 World Programme on Population and Housing Censuses: Census Evaluation and Post Enumeration Surveys, Asunción,
1 Lessons Learnt from 2005 ICP-Africa Implementation and Preparation for the 2011 Round ICP Regional Coordinators Meeting, Washington DC, September.
Needs Assessment Instrument Purpose & Elements of Design.
Tracking HIV/AIDS resources in-country: Institutionalization through capacity building and regional networks T. Dmytraczenko and S. De, Abt Associates.
TAG Views on the Specification Lists From Africa and Asia Response of the Technical Advisory Group to a Request to Review Regional Product Lists.
CPS ® and CAP ® Examination Review MANAGEMENT, Fifth Edition By Haney and Mazzola ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River,
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Presenter:- Mrs. Josette Maxwell-Dalsou Chief Economist Economic Planning Ministry of Finance, Economic Affairs and National Development.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
Tasks, responsibilities and ethics of the evaluator Helka Kekäläinen Baku.
Meeting of ICP Regional Coordinating Agencies Brief overview of ICP interim activities African Development Bank March 1, 2015, New York.
Regional Coordinators Meeting
Problems and challenges faced in the implementation of CP work flow
Suggestion for next steps for PGA for REDD+ in Vietnam
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Module 5 The Climate Expert and your role as a consultant
Assumptions INFS 4810.
Presentation transcript:

1 ICP – data collection Model work plan Seminar for regional coordinators Washington DC, May 2004

2 ICP – data collection Model work plan Assumptions and constraints Work plan based on current and past experience Relations among coordinators in Latin America Data collection in South Africa Evaluation of previous ICP round

3 ICP – data collection Model work plan Recorded complaints Imperfect communications upwards and sideways ABS/Stats Canada criticism: poor governance No statement of responsibilities and accountabilities Bottom-up approach lacking

4 ICP – data collection Model work plan A few corrective features: In Latin America: two 1week visits to each participating country before kick off Two consultants per country Consultants specialized by country Also specialized by subject List of goods and services agreed to collectively collectively Emphasis on photos of goods and outlets

5 ICP – data collection Model work plan Timely opportunity in South Africa CPI conversion to interview survey Training in product identification and re-pricing Anomalies, adjustments, and substitutions Validating list of goods and services Seeking out expert advice

6 ICP – data collection Model work plan Constraints faced in Latin America: No subsidy to countries ICP- offshoot of CPI operations FCF conducted by consulting team Likewise for Government expenditure But all countries have CPI Matters of representativeness are tested Number of quotes proportional to variability

7 ICP – data collection Model work plan Plan is not a straitjacket E.g.: times suggested are indicative Sequence of operations: can be reviewed Basis: South African experience Tempered by Latin America Plan is living document Best is to adapt to national circumstances

8 ICP – data collection Model work plan Elements of plan Four different perspectives Regional coordinator National coordinator Supervisor Price collector Designations apply to level – not to people

9 ICP – data collection Model work plan Information flows Upwards and downwards Billboard What must be compared must be known to all Entire exercise transparent Except for individual records But more of that later

10 ICP – data collection Model work plan Time table imposed by regional coordinator National coordinator complies and avoids surprises Few unilateral decisions Except on matters of national legislation

11 ICP – data collection Model work plan Several seminars throughout ICP round Ex-ante to establish list Ex-post to review results of data collection Collective appraisal of parities Opportunity to challenge Accent on transparency

12 ICP – data collection Model work plan Basic documentation required MOU Identification of participants Legal advice Brazilian story – a parenthesis Agreed list of goods and services Understanding involving CPI /NA Credentials and authorities

13 ICP – data collection Model work plan Second stage: lining up one’s ducks Operations manual Translated where necessary Validated list of goods and services Circumstances requiring exceptional treatment Materials: maps, routes, credentials Equipment: hardware and software Photo album

14 ICP – data collection Model work plan Getting there Consulting up Getting agreement down Formalizing agreements Latin American approach SADEC and Mercosur Final coordination Go!

15 ICP – data collection Model work plan First quarter: a realistic pilot Four quarters to get everything right and confirmed End of quarter meeting Weekly reporting on status Early warning of risk in meeting deadline Advice and consent on anomalies

16 ICP – data collection Model work plan End of quarter meeting Review of timeliness Examination of anomalies Assessment of outliers Confirmation of list of goods and services

17 ICP – data collection Model work plan Mid-twelve month period FCF Over second and third quarters: government Manual General and operational supplement Visits to countries Improvements where required

18 ICP – data collection Model work plan Premature to plan last meeting But right to announce intentions Learning from mistakes Settling matters of dissemination Global and regional results Fixity The next round of ICP

19 ICP – data collection Model work plan For time being Take plan home Test against national realities Put in realistic time estimates Discuss difficulties with regional coordinator

20 Schematic representation of plan (1)

21 ICP – data collection Model work plan