Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)

Slides:



Advertisements
Similar presentations
Slab constructed cup Flatten a lump of clay into a long shape as you will be rolling out a slab long enough to wrap around a tube form. Note: finished.
Advertisements

Prepared by: Vortex Engineering Date: 9.March.2012 Floor Box ™
P15503 Electrophotographic Cascade Test Rig System Level Design Review Dalton MeadBridget Kearney Mike WarrenRuishi Shen Tom WossnerZack Foggetti.
Resources Requirements Technical Approach Introduction Audiophiles often prefer the sound of vinyl records when compared with digital storage methods.
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew.
Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
The Team Clockwise from Left - Rachel Chrash (EE), Min-Shi Hsiao (EE), David Schwartz (Team Lead - IE), Andrew Kearns (EE), Sasha Oliver (CE), Ruth Gay.
Electrophotographic Development and Transfer Station Update Week 2 Progress Report Ben Nguyen Dan Prosser Adam Regula Steve Snyder Amar Mohamed.
P11310: Parabolic Dish Autopoint Solution Project Family Team Leader: Trae Rogers (ME) Project Engineer: Pat Ryan (EE) Kyle Norlin (ME) Chris Reed (CE)
MSD-I Project Review Modular Motion Tracking Sensors 1.
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
Aries Engineering Design Team 06/06/2008 Aries Engineering Design Team Matt Baker Pete Levno Zach Perryman Jessica Pierry Industry Advisor: Ken Millard,
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
R·I·T Kate Gleason College of Engineering Design of a Tensile Load Frame for a Scanning Electron Microscope Senior Design Project Project Manager.
04013 Micro Turbine Senior Design Micro Turbine Senior Design CDR – May 14 th, 2004 Project
Charge Laser Expose Transfer Clean Development Developed Toner Image Charged Background Area Discharged Image Area Photoreceptor.
EDGE™ Project Overview P09503 – Electrophotographic Development and Transfer Station David Schwartz – ISE (Team Lead) Ruth Gay – ME Phillip Lopez – ME.
MSD-II Project Review Modular Motion Tracking Sensors 1.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 3:30Introductions 3:35Project Description 3:45Customer Needs 4:00Risk.
Ground Scouts P09207 Project Manager: Stewart Wadsworth Faculty Guide: Dr. Sahin Starting: Ending:
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
1 February 13, 2009Senior Design I – Detailed Design Review Detailed Design Review Senior Design I Low Energy Printing Project P
P13625 – Indoor AIR Quality Monitor
Electrophotographic Cascade Development Apparatus Detailed Design Review December 9th, 2014 Dalton Mead Michael Warren Thomas Wossner Bridget Kearney Ruishi.
P13621: Conductive Heat Transfer Lab Equipment MSD II: Final Project Review 10 May, 2013 RIT KGCOE.
5.2: Circuits, Ohm’s Law, Electrical Power 2/6/13.
Group 1: Material Testing Device Jobe Dyson Brie Witherspoon John Chandler Brett Newstead.
Problem Statement There are over 25 million children under the age of 5 in the United States, many of these children are taken out to restaurants to eat.
Multidisciplinary Senior Design Project Charles Alexander, Tom Christen, Kim Maier, Reggie Pierce, Matt Fister, Zach Mink Underwater Thermoelectric Power.
R14701: ME Machine Shop Opportunities.  Goal ◦ Top rated ME program and ME machine shop in the nation and eventually the world.  Objectives ◦ Identify.
P16415: Human Powered Centrifuge Amanda Johnson Nathan Corr Pieter Werner Joanna Jayawickrema Laura Pratt.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
The Mighty Arm Post Creators Michael Dunleavy Willie Ho.
FTC Home Page FTC Game Page FTCGAMEPAGEFTCGAMEPAGE.
P15080: Flow Culture System Multi-Disciplinary Senior Design Problem Definition Review September 11, 2014 Collin Burkhart – Lead Mechanical Engineer Katelyn.
P16453 Subsystem Design Loading, Measurement, Control, and Test of a Journal Bearing Test Platform Kris Kidder | John Dolan | Shay Stanistreet | Anthony.
E-NABLE Hand Test Rig P16061 David Schwartz, Tia Parks, Shannon Barry, Samantha Mason, Charles Rumfola.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Magnetically Levitated Propeller Bernie Garcia (ME, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachary Louison.
Magnetically Levitated Propeller Bernie Garcia (Me, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachory Louison.
P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
January 16, 2009Senior Design I - System Level Design Review System Level Design Review Senior Design I Low Energy Printing Project P09505.
Electrophotographic Cascade Development Apparatus Zachary FoggettiBridget Kearney Dalton MeadRuishi Shen Michael WarrenThomas Wossner.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
What has been accomplished at the end of MSD 1 & 2?
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
EDGE™ Final Project Plan Presentation P08043 – Mass Spectrometry Sample Preparation.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Getting Ready for the NOCTI test April 30, Study checklist #1 Analyze Programming Problems and Flowchart Solutions Study Checklist.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
TEAM FREE LEAVY’S Presents
Turbomachinery Flow Visualization P08453
P07203 Dynamometry Laboratory Infrastructure
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Mechanical Subsystems LabVIEW Code for Feedback Loop
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
P08002-Automated Parallel Bars
Collisionless Rimless Wheel (wired)
P15661 Reciprocating Friction Tester Base Subsystem
Project Readiness Review P10029 – Air Muscle Artificial Limb
Final Status Update P09006 – Upper Extremity Exerciser
P11017 Tactile Navigation Interface
P18325: Automated Breast Pump Cleaning System (Team ABC’s)
Low Energy Printing Project Overview
Presentation transcript:

Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME) Project Review - May 12, 2015 Customer/Sponsor: Dr. Marcos Esterman Dr. Shu Chang Faculty Guide: Sarah Brownell

Agenda ●Background ●Project Overview ●Customer Needs ●Engineering Specs ●Concept Selection & Final Product ●Project Status ●Testing Results ●Major Issues and Findings ●Overall Evaluation & Future work ●Recommendations

Background The focus of this project is the redesign and construction of a xerographic device, called an Electrophotographic Cascade Development Apparatus (ECDA). The ECDA is a piece of test equipment that enables the user to determine whether a specific material is able to be printed onto a surface by means of electrophotography. Such a device is currently being used by RIT faculty and graduate students. However, there is much that can be done to improve the device’s functionality. The new design will allow the user to explore options beyond regular toner particles, such as copper, silver, steel, and other metal or metal alloys.

Project Overview - Old Device Old Device ●Results hard to view o Development zone plates irreplaceable o Required functionality not provided ●Parallelism between plates not guaranteed ●Flow of particles impeded due to transfer surface friction ●Particles hard to be collected after testing

Customer Needs Checklist ●The device must be safe to use ●The device must control the flow of particles ●The device must reduce or eliminate particles lost ●The device must allow easy access to the test sample ●The device must automate as many processes as possible ●The device must handle a range of particle sizes ●The device must be easy to use ●The device must handle the required voltage ●The device must handle large particle samples ●The device must transfer particles using electrophotography ●The device must prevent particle clumping ●The device must allow for a range of spacings between the charged and grounded plates ●The device must handle different types of materials ●The device must allow the charged plates to be easily replaced

Original Engineering Specs

Final Engineering Specs Reasons for Changes: ●Time constraint and lack of manpower o we were not able to accomplish the hopper subsystem ●We were not given the desired types of particles to perform the test ●We were not able to find the benchmark to assess the electrical safety score

●Transfer surface o Aluminum plate o Ground to achieve smooth surface finish ●Parallel set o Used to simultaneously raise and lower both sides of the upper charged plate o Ensures upper plate is parallel to lower plate ●Angle - rope & cleat o Allows transfer surface angle to be easily adjusted ●Metal clips for development zone o Provides contact points to deliver charge to the upper and lower plates Concept Selection

Final Product - Our Design ●Results easy to view o Development zone plates removable o Required functionality provided ●Parallelism between plates ●Percentage of particles stuck on the transfer surface greatly reduced (~4%) ●Particles can be collected after testing

Final Product - Our Design Video: /0B8yBiP- JaMe5NDdSeGFvZkE2dU0/0B6O8495bKQ4FfjJZd0R2T19nbmNRMmFTeWtV ODVKdDBnSjF6LWdFY0pjakR4T3hleDg2RkU/0Bx0fpCwe6CadfmJvOHJta0Vi XzN2N3ZsVjlMWEhTOXEwVWNzd3Y2Rmd1cU1RYWFhSVV0ckE

Project Status ●The final product performs electrophotography well o Subsystems of transfer surface and development zone are a success ●We did not have enough time to finish the hopper subsystem ●We were able to establish a continuous angle system ●Budget o Originally $2500, then cut down to $1500

Key Testing Results ●Only requires 48 seconds (on average) to set up the device before running tests ●Only 4.32% of particles per test (on average) are stuck to transfer surface ●Nearly 0% of particles per test are lost through the system ●Only requires less than 2 seconds (on average) to view the results ●Only requires 13 seconds (on average) to swap out the development zone

Major Issues and Findings ●We lost a team member at the beginning of MSD II o Lack of manpower and time constraint caused incompletion of hopper system ●We failed to purchase all our parts with the right thickness at the beginning o Fortunately this did not cause too much machining trouble; machine shop has the material with right thickness

Overall Evaluation & Future Work ●Completed subsystems meet all the critical customer needs and engineering specs ●Future work o Automate the angle system o Connect the device with computer using LabVIEW so it can be fully controlled and evaluated

Learnings & Recommendations ●What have we learned? o Some ideas were too lofty; should have considered time constraints more carefully o Talk to SMEs earlier and more often o Things often take longer than expected; leave time in the project plan to deal with the unexpected ●Recommendations for MSD program o PRP (ours at least) could have been more thorough/accurate/helpful o End of MSD I evaluation process could have been more thorough (we had some catching up to do in MSD II)