Progetto OPTIMUS PLM and Interoperability in the defense sector Vico Equense (NA) – April, 22 2015 Xenia Fiorentini.

Slides:



Advertisements
Similar presentations
Linking Technology and Defense. Introduction It stands for Product Life Cycle Support It is an International Standard It is an information standard It.
Advertisements

Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Test Automation Success: Choosing the Right People & Process
ITIL: Service Transition
© 2004 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Holistic View of the Enterprise Business Development Operations.
A framework for describing IT Project Management Processes and Tool Set Features Enterprise Project Management Framework.
Development Processes UML just is a modeling technique, yet for using it we need to know: »what do we model in an analysis model? »what do we model in.
Unit Five – Transforming Organizations
Integration of Applications MIS3502: Application Integration and Evaluation Paul Weinberg Adapted from material by Arnold Kurtz, David.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
® IBM Software Group © 2007 IBM Corporation Achieving Harmony IBM's Platform and Methodology for Systems Engineering and Embedded Software Development.
Copyright  Larry Dribin, Ph.D. SE470_EngFlows_v1.ppt SE470 EngFlows - 1 Excellence in Software Engineering Repeatable Level Defined Level Manage.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Introduction to SAP R/3.
Process, Communication, and Certification Padma Venkata
Application of PDM Technologies for Enterprise Integration 1 SS 14/15 By - Vathsala Arabaghatta Shivarudrappa.
Problems with reuse – Increased maintenance costs; lack of tool support; not-invented- here syndrome; creating, maintaining, and using a component library.
Effective Methods for Software and Systems Integration
MDC Open Information Model West Virginia University CS486 Presentation Feb 18, 2000 Lijian Liu (OIM:
New Product Development Management NPDM 11 Mohsen SADEGHI
1 Proposed PLCS TC Organization and Functional Responsibilities Revision
Katanosh Morovat.   This concept is a formal approach for identifying the rules that encapsulate the structure, constraint, and control of the operation.
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
Depuis WS Rome May 2008Courtesy Wolfgang Wilkes May 2008Depuis WS Rome Paul van Exel, Director USPI USPI: Association for the Oil, Gas,
SOFTWARE ENGINEERING BIT-8 APRIL, 16,2008 Introduction to UML.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design.
Rational Unified Process Fundamentals Module 4: Disciplines II.
IEEM 5352 E-Enterprise Integration
© 2008, Integrated Support Systems, Inc. All rights reserved. 1 © 2009, Integrated Support Systems, Inc. All rights reserved. An Implementer's View of.
1 Configuration Management “The Cookbook Approach”
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
ETICS2 All Hands Meeting VEGA GmbH INFSOM-RI Uwe Mueller-Wilm Palermo, Oct ETICS Service Management Framework Business Objectives and “Best.
SCSC 311 Information Systems: hardware and software.
11 Configuration Management Site Configuration Management Case Study.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Odyssey A Reuse Environment based on Domain Models Prepared By: Mahmud Gabareen Eliad Cohen.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Product Life Cycle Support (PLCS) The Information Backbone to transform the Logistics Enterprise PLCS – Applying AIDC Howard Mason Corporate IT Office.
1 Introduction to Software Engineering Lecture 1.
From Objects to Assets: The Fungibility of Knowledge Christopher W. Higgins, Esq.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
ERP Implementation Fundamentals Richard Byrom Oracle Consultant, Speaker and Author
Feb , TRANSATLANTIC ISO AP239 Product Life Cycle Support Land Systems Breakout Group Feb , 2006.
Implementing Parametric CAD in STEP ???? Kenneth E. Wolsey May 16, 2007
Framework for the Creation of Digital Knowledge Resources to meet the Challenges for Digital Future: A Librarian’s Perspective Dr. Harish Chandra Librarian.
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
Independent Insight for Service Oriented Practice Summary: Service Reference Architecture and Planning David Sprott.
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
Slide 1 Service-centric Software Engineering. Slide 2 Objectives To explain the notion of a reusable service, based on web service standards, that provides.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
Synchronise work on DEXs and reference data between PLCS pilots and OASIS/PLCS Workshop #3 10 – 11 November 2004.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Slide 1 of 14© 2015 ENGISIS INTEROPERABILITY FOR PRODUCT LIFECYCLE MANAGEMENT Ing. Xenia Fiorentini PLM and Interoperability in the defense sector.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
1 Industry Specifications and their importance in Product Lifecycle Management (Dr Michael Day & Deborah Jane Ham) (September-2012)
Application of the ISO for BIM Xenia Fiorentini, Engisis.
Introduction to Software Engineering 1. Software Engineering Failures – Complexity – Change 2. What is Software Engineering? – Using engineering approaches.
Technical Operations 12 th July 2010 Dr Phil Spiby Eurostep Limited Integrating Systems Engineering Information with AP233.
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
Technische Universität München © Prof. Dr. H. Krcmar An Ontology-based Platform to Collaboratively Manage Supply Chains Tobias Engel, Manoj Bhat, Vasudhara.
ITIL: Service Transition
Document No: GSC-21_034 Source: ISO/TC 184/SC 4 Industrial data
Setting the Standard for Product Support
The Re3gistry software and the INSPIRE Registry
Geometry Services for ISO – STEP standards linking product definition, management and visualization in the value chain Jean Brangé :
Service-centric Software Engineering
Document No: GSC-21_034 Source: ISO/TC 184/SC 4 Industrial data
Presentation transcript:

Progetto OPTIMUS PLM and Interoperability in the defense sector Vico Equense (NA) – April, Xenia Fiorentini

Agenda The PLM context –Interoperability in the PLM context The PLM context in the defense sector –Interoperability for the defense Cases PRODUCT DATA MODELING AND DEPLOYMENT

The PLM context - recap PLM stands for Product Lifecycle Management –The product lifecycle includes all the phases of the product life, from concept definition to product disposal and recycle –PLM imposes to manage the lifecycle from its beginning Why would anybody want to do PLM? –To optimize the cost of the lifecycle (cost of design, production, maintenance, usage...) –To shorten the time to market –To forecast problems that can arise later –To provide services for the product –To maintain the engineering knowledge of the company in an integrated way and reuse it PRODUCT DATA MODELING AND DEPLOYMENT

The problem (1/2) Several proprietary software applications manage the product data during its whole lifecycle –Applications for requirements modeling, for engineering design, for manufacturing cycles, for maintenance procedures, customer support, etc. PRODUCT DATA MODELING AND DEPLOYMENT

The problem (2/2) The business processes need these applications to communicate and share product data with each other –Internal processes: requirements tracking for certification, integrated logistic support for new types of contracts, reuse of manufacturing capabilities, design for sustainability, engineering changes due to customers complains, etc. –Collaboration with partners, suppliers and customers –Long term archiving Why is the communication between applications a problem? –The applications are proprietary: few companies know how to “access” them –The versions of the same application are often not compatible –The number of involved applications is high just right now. Plus, new applications can be used in the future –Data are sometimes managed by legacy applications PRODUCT DATA MODELING AND DEPLOYMENT

How the problem is commonly solved Migrate legacy applications to a unique application Implement some sort of application programming interface (API) for each application, and then, in each application, implement "glue code" that exploits the APIs of other applications to link them together Design a single database to store the data of multiple applications, and implement each of the applications against this database (or repository) THESE OPTIONS ARE EXPENSIVE (see presentation “Interoperabilità: costi e benefici”) “ This report, prepared for NIST by RTI International and the Logistic Management Institute, estimates the cost of inadequate interoperability in the U.S. capital facilities industry to be $15.8 billion per year.” [Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry, NIST] PRODUCT DATA MODELING AND DEPLOYMENT

Engisis focuses on Interoperability for PLM Use standards and specifications  PLCS (ISO AP 239) and DEX  PDM Schema and ISO AP 233, AP 242, AP 235  ISO  S3000L  NIILS (Italian inter-forces specification for ILS) Assess models against processes We investigate existing product data models and their relationship with the processes. We apply data models to the business context. Deploy common models We apply standard data models for business cases and deploy the product data models to solve your interoperability issues. Use skills and technology  Model-based engineering  Model and ontology for product data  Models transformation  Languages for data and process modeling  Software architecture and programming Train We provide educational services and trainings adapted to each organizational level, from business managers to software implementers. Implement interoperability Assure interoperability between the software applications that manage product data during the whole product lifecycle.  Test cases and data sets  Products PRODUCT DATA MODELING AND DEPLOYMENT

The PLM context in the defense sector Doing PLM in the defense sector is challenging –Products are complex –Products have very long lifecycles –Nobody is responsible for the whole product –Acquisition and Deployment are managed as separate phases –Nobody has ever calculated the total cost of ownership of the products –The actors in the lifecycle are numerous –The actors in the lifecycle are not necessarily known PRODUCT DATA MODELING AND DEPLOYMENT

Interoperability in the defense sector: an example FMECA Analysis Maintenance Tasks FunctionalAnalysis Design From the delivery of a product, to the delivery of capabilities PRODUCT DATA MODELING AND DEPLOYMENT

Interoperability in the defense sector: an example FMECA Analysis Maintenance Tasks FunctionalAnalysis Design From the delivery of a product, to the delivery of capabilities DATA IN STANDARD FORMAT PRODUCT DATA MODELING AND DEPLOYMENT

Interoperability in the defense sector: an example FMECA Analysis Maintenance Tasks FunctionalAnalysis Design From the delivery of a product, to the delivery of capabilities DATA IN STANDARD FORMAT The failure effects of the FMECA are derived from the relationships between the product components and hte functional analysis Maintenance tasks are linked to failure modes, which are detected through the failure effects, they are executed over the components and need equipments and tools PRODUCT DATA MODELING AND DEPLOYMENT

Which standard? ISO TC 184/SC 4 (Industrial data) created a serie of standards. –ISO is the standard for Product Life Cycle Support (PLCS) Define product requirements and configuration, including relationships between parts and assemblies in multiple product structures (as- designed, as-built, as- maintained). Request, define, justify, approve, schedule and capture feedback on work and related resources. Describe and capture feedback on product properties, states, behavior and usage. PLCS Capabilities Product Description Property, State & Behavior Work Management Support Solution & Environment Define the support for a given set of products in a specified environment and define support opportunity, facilities, personnel and organizations. PRODUCT DATA MODELING AND DEPLOYMENT

Case 1: MoD/supplier interoperability for LSA The MoD customizes a commercial tool (SAP) to manage the configuration of both the design of the naval systems and their installation, together with their logistic engineering data The MoD needs to talk with the suppliers –To sync the configurations of the systems, and their logistics parameters –To sync the maintenance plans We build a PLCS adapter to this tool (by following, also, the S3000L specification) PRODUCT DATA MODELING AND DEPLOYMENT

Case 2: PLM Interoperability strategy A multinational company is deploying a PLM strategy. Interoperability is seen as a means to –Give enough freedom and security to each country –Deploy a step-by-step PLM solution –Implement multinational collaboration –Exchange data with suppliers and partners Single sign-on Forum Management of product structures Project management capabilities Search for product data in TAS Manage organization, projects and workflows Register systems Manage mappings Check Assign Query Browse Print ADMINSYS SHARE OPT USER Synchronize eBOM Transfer Technical baseline Synchronize Change Requests Synchronize CCN Synchronize RFD Transfer the as-designed baseline Synchronize Change Proposals  We plan a standard-based share&exchange strategy −We specify ›Collaboration processes ›Functionalities ›Data modeling ›Architecture −We make a Business Case Analysis with real processes, data and systems PRODUCT DATA MODELING AND DEPLOYMENT

Case 3: Coalition/Joint Logistics Interoperability The CLI/JLI project –each military service brings its own assets to repair its weapon systems –assets need to be purchased, stocked, managed and disposed by each military service –we can lower the cost of the repair processes by making the assets shared among the military services in a joint/coalition interoperability logistic scenario The scenario –items are marked through UIDs (Unique Item Identifications) –one military service requires an item to be repaired –another military service repairs it We build interoperability between –The ERP of each military service –The UID registry PRODUCT DATA MODELING AND DEPLOYMENT

16 Interoperability in Public Transportation Systems Thanks! Grazie! Xenia Fiorentini Engisis S.r.l.

Customer : power-plant design and operations Project title: Models interoperability and systems architecture for PLM Project duration: 2 years (ongoing) Partners: an engineering school and an university Project data 3 scenarios per year, each including state of the art, technical proposal and demonstration Modeling of catalogues, CAD data and business rules for PLM Usage of meta-modeling techniques, application of ISO 15926, definition of ontologies, selection of languages for rules expression Approach Analysis and application of standards to exchange product data Modeling and mapping of proprietary data Technical benchmarking of existing solutions Software development and application in real cases Achievements HOW: BUSINESS CASE A PRODUCT DATA MODELING AND DEPLOYMENT

Customer : international defense organization Project title: Coalition logistics interoperability through PLCS Project duration: 6 months Partners: 3 consulting companies Project data Development of use cases, architecture diagrams and test cases Definition of the Business Object model and associated XML schemas Software customization and validation Approach Definition of meta-data for the exchange Use of everyPLM to exchange PLCS data for sharing maintenance capabilities between proprietary tools Software demonstrations in environments with high security requirements Achievements HOW: BUSINESS CASE B PRODUCT DATA MODELING AND DEPLOYMENT

Customer : defense prime contractor Project title: S3000L Proof of concept Project duration: 3 months Partners: support from CALS Italy Project data Analysis of data as currently managed by the customer Application of the Logistic Support Analysis (LSA) business processes: as-is and to-be Usage of the PLCS SDK to implement the S3000L PLCS DEXes Support for sharing achievements and obstacles in international industrial communities Approach Educational sessions: LSA processes and data Development of reference data and mappings Development of an S3000L generator and viewer Feedback reporting to the S3000L community Achievements HOW: BUSINESS CASE C PRODUCT DATA MODELING AND DEPLOYMENT