Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.

Slides:



Advertisements
Similar presentations
EMMA Magnet Design Ben Shepherd Magnetics and Radiation Sources Group ASTeC STFC Daresbury Laboratory.
Advertisements

Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
Eddy Current Septum Magnet Optimization Powering Options of SMH42 and the Influence of the Septum Thickness on the Fringe Field Zsolt SZOKE (TE/ABT/SE)
SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
Method of beam extraction from a synchrotron by the instrumentality of multilayer Cu-Fe shield Bondarenko Alexey.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
FCC-hh Injection and Extraction
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
MSI-V J. Borburgh, B. Balhan, E. Carlier, J.M. Cravero, B. Goddard, D. Nisbet, P. Van Trappen, F. Velotti.
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
R&D ON STRIPLINES FOR THE CLIC DR KICKERS C. Belver-Aguilar (IFIC) Acknowledgements: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M. Barnes (CERN) ICFA Beam.
Design of electrostatic septum for slow extraction from J-PARC main ring 2005, March 2nd ICFA septa workshop 2005 Acc. Lab., KEK M. Tomizawa, Y. Arakaki,
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Liesbeth Vanherpe, Olivier Crettiez, Alexey Vorozhtsov, Thomas Zickler Quadrupole Electro-magnets for Linac4 at CERN ATS Seminar, CERN, July 11, 2013.
Magnet Design & Construction for EMMA
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
ESS | A Preliminary Feasibility Assessment of Power Converters and Magnets for Beam Raster System| | Carlos A. Martins, ESS Preliminary Feasibility.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
Comparing current waveforms and shielding options for SMH42 Zsolt Szoke LIU-PS Meeting, 16/12/2014.
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
FCC DUMP SYSTEM W. Bartmann, B. Goddard, R. Ostojic FCC Dump Meeting, 14 th Jan
Principals of fast injection and extraction R. Apsimon.
PSB-PS TRANSFER AT 2 GEV - CONCEPTS AND OPTICS W. Bartmann, J. Abelleira et al. ABT LIU Review, 20-Nov-15.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
MSE Pulsed Septum for g-2 and Mu2e Design Review A. Makarov 2/11/2016.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Wim Weterings Remy Noulibos
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
PS2 WG Injection and extraction systems Basics and assumptions
TPS pulse magnet measurement
SMH16 eddy current septum
LINAC4 ADVISORY COMMITTEE
A.Lachaize CNRS/IN2P3 IPN Orsay
Status of the CLIC DR wiggler design and production at BINP
(Beam) Impact of MTE on the PS septa
Challenges of vacuum chambers with adjustable gap for SC undulators
Power converters for 2GeV injection
Arc magnet designs Attilio Milanese 13 Oct. 2016
Septa requirements and suitable septa topologies for FCC
CHEN, Fusan KANG, Wen November 5, 2017
MD Studies for LIU PS Injection
Yingshun Zhu Accelerator Center, Magnet Group
Compact and Low Consumption Magnet Design The DESY Experience
PSB-PS instrumentation for LIU
Beam Injection and Extraction Scheme
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
PS2 Injection/Extraction Layout
Status of CTC activities for the Damping rings
Physics Design on Injector I
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Specifications for the XFEL Beam Switchyard Kickers
Presentation transcript:

Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2

PS injection septum Conventional eddy current device LIU-ABT review 20/11/2015 Status PS injection septa3 LIUPresent Nominal beam energy [GeV] Magnetic length [mm] Septum thickness at the downstream extremity (including magnetic screen) [mm] 5.85 Septum thickness at the upstream extremity (including magnetic screen and bumper septum thickness) [mm] 11n.a. Magnet gap height [mm] Magnet gap width between conductors [mm]95102 Nominal deflection angle [mrad] B gap [T] Integrated field strength [T.m] Peak current for nominal deflection [kA] Field homogeneity in gap ( ʃ B y.dl on straight line wr.t. centre) [%] ± 1.2unknown Pulse length [ms]2 (full wave)3.2 (half sine) Max. induced voltage on magnet terminals when injection bumper is pulsed [mV] 30n.a. Average duty cycle [s]1.2 ppm possibleyesno

Conventional eddy current septum LIU-ABT review 20/11/2015 Status PS injection septa4

Injection septum features LIU-ABT review 20/11/2015 Status PS injection septa5 SMH42 ∫B y dl homogeneity Uses flattened full sine excitation current → less sensitive to timing jitter. Uses soft steel end plates to reduce leak field and improve field homogeneity. Will use copper coated mu- metal beam screen to reduce leak field.

Defined SMH42 Position in lattice Magnet aperture Range of displacement system Current precision and stability Field homogeneity Beam emittance blow up, losses at injection Beam impedance measures: copper coated mu-metal beam screen adjacent to septum Space Reservation Request LIU-ABT review 20/11/2015 Status PS injection septa6

Outstanding SMH42 LIU-ABT review 20/11/2015 Status PS injection septa7 Engineering specification ECR Prototype would be useful to benchmark simulations with high precision.

Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa8

Injection bumper septum BSW42 2 GeV systemPresent 1.4 GeV Physical length [mm] Magnetic length [mm] Septum thickness [mm]5>6 Magnet gap height between poles [mm]7090 Magnet gap width between conductors [mm] Nominal deflection angle [mrad]13 Bgap [T]0.375 Integrated nominal field strength [T.m] Field homogeneity in gap w.r.t angular deflection in H [%]± 0.8 Peak current for nominal deflection [kA] Pulse width, half sine [ms] Max. induced voltage on magnet terminals when injection septum is pulsed [mV] 230n.a. Average duty cycle [s]1.2 ppm possibleyes LIU-ABT review 20/11/2015 Status PS injection septa9 ‘Direct drive like’ eddy current device proposed, using soft steel endplates to improve field homogeneity significantly

Field Quality Injection bumper septum Magnet very short w.r.t. aperture: poor field homogeneity due to end fields. Field homogeneity improved by introducing ‘direct drive like’ geometry and additional soft steel field clamps. LIU-ABT review 20/11/2015 Status PS injection septa10

‘Direct drive like’ eddy current septum LIU-ABT review 20/11/2015 Status PS injection septa11

Magnetic undershoot of field With half sine pulse, magnetic field shows in simulations post pulse ripple (undershoot). Presently not confirmed as yet by measurements on prototype. Mitigation to be found. LIU-ABT review 20/11/2015 Status PS injection septa12

Defined Injection bumper BSW42 Current tracking precision and stability. Based on MD measurements with timing variations between -+20 us. Based on jitter measurements on existing equipment. Field homogeneity. Effect of higher harmonics of bumper simulated, but negligible contribution to emittance blow up. No beam screen insert in magnet gap. LIU-ABT review 20/11/2015 Status PS injection septa13

Outstanding BSW42 Cross talk between magnets. First values appear counter intuitive: 30 mV induced on septum, 230 mV on bumper. Magnetic post pulse ripple mitigation. Power convertor characteristics to be finalised. Engineering specification (combined with injection septum). LIU-ABT review 20/11/2015 Status PS injection septa14

Mechanical concept design LIU-ABT review 20/11/2015 Status PS injection septa15 Coil fixation and copper box insulation defined. Remote displacement system planned to be recovered from existing system. EN/MME ‘bureau d’etude’ started. Space Reservation Request submitted.  Vacuum equipment still tbd.

Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa16

Planning Injection septa Functional spec frozen by Christmas 2015 ECR Q Mechanical concept finalised 2015 Mechanical design finished Q Bumper prototype to be built Q Part procurement as from Q Assembly and testing 2017 LIU-ABT review 20/11/2015 Status PS injection septa17

Year PV EV AC Metrics per year in kCHF Cumulative metrics per year in kCHF PI.SMH42 & PI.BSW42 magnets Year PV EV 0 AC 19

Human resources Zsolt leaving 31/1/2015, will depend on Miro and Bruno for calculations. Mike and Jan available to follow up start of project in No technicians available in 2016 once part procurement is to start. EN/MME started in November on mechanical design based on Mike’s conceptual design APT data obsolete. LIU-ABT review 20/11/2015 Status PS injection septa19

Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa20

Conclusion Requirements quasi defined. Concept design well under way. Need for prototype bumper magnet demonstrated by Bruno measuring existing eddy current device. Human resources to be clarified. LIU-ABT review 20/11/2015 Status PS injection septa21

Documentation PS Injection Septa and Bumper  Functional spec: (edms ), In work  SRR: sent for approval ((edms )edms  Engineering spec: to be done  ECR: to be done PS Ring MU41 and MU42 Vacuum Chambers  Functional specification: (edms ), released Functional specification: (edms )  ECR (TE/VSC): (edms ) engineering checkedms LIU-PS meeting 20/10/2015 Status injection equipment22