Magnets Technologies for NOνA Transfer Line (& RR30 section) July 21-23, 2009.

Slides:



Advertisements
Similar presentations
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Advertisements

Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
11 October 2006Basic Layout of LER G. de Rijk1 Basic Layout of LER  The basic idea  VLHC type magnets  LER in the LHC tunnel  Layout  LER experiment.
Magnets for the ESRF upgrade phase II
Magnet designs for the ESRF-SR2
ALPHA Storage Ring Indiana University Xiaoying Pang.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
Magnet designs for Super-FRS and CR
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Accelerator Physics Issues Shekhar Mishra Sept 17-19, 1996 Main Injector DOE Review.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
F James T Volk June Permanent Magnets for Linear Colliders James T Volk Fermilab.
Adiabatic eRHIC Extraction June 3, 2015Stephen Brooks, eRHIC meeting1 With emittance growth analysis.
Extraction from the Delivery Ring November 19, 2013 J. Morgan.
NLC - The Next Linear Collider Project Oct 01 MAC James T Volk October 2001 MAC meeting Magnet Systems for the NLC James T Volk October 26, 2001.
Magnet Design & Construction for EMMA
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Proposed Conventional Sextupole for Installation at A0 Introduction (Dean Still) Reasons for installation- Reduce I in S6 feeddown sextupole circuit at.
Some Value Engineering Proposals For LBNE Beamline.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
XFEL X-Ray Free-Electron Laser Bernward Krause MEA WP-12: Warm Magnets WPL: B. Krause.
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Principals of fast injection and extraction R. Apsimon.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
MI Beam Loss upon Acceleration 5E11/div 11BLMA=LM GeV/c 9.8GeV/c Start of Ramp Fast loss ~10 ms Slow loss.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Emittance reduction by a SC wiggler in the ATF-DR September 16 th, 2009 Yannis PAPAPHILIPPOU and Rogelio TOMAS ATF2 weekly meeting.
F James T Volk Arpil Permanent Magnets for Linear Colliders James T Volk Fermilab.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
Linac4 Tech. Design Committee 10 th October 2006 Thomas Zickler AT/MEL/MI/tz 1 Magnets for Linac4 Th. Zickler CERN 6 th Linac4 Technical Design Committee.
Linac4 MAC 29 th January 2008 Thomas Zickler AT/MCS/MNC/tz 1 Magnets for Linac4 Th. Zickler CERN Linac4 Machine Advisory Committee 28 th - 30 th January.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
Slip stacking in Recycler Ioanis Kourbanis 9/14/11.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
A new QF1 magnet for ATF3 Alexey Vorozhtsov
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Some Design Considerations and R &D of CEPCB Dipole Magnet
Test of a Permanent Magnet Quadrupole Placed in a Dipole Field
J-PARC main ring lattice An overview
Warm magnets for LHeC / Test Facility arcs
The design schemes of the low field dipole magnets
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Arc magnet designs Attilio Milanese 13 Oct. 2016
Target and Horn status report
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
CHEN, Fusan KANG, Wen November 5, 2017
Magnets for the ESRF upgrade phase II
Main magnets for PERLE Test Facility
Compact and Low Consumption Magnet Design The DESY Experience
Junji Urakawa (KEK) for ATF International Collaboration
SCU Next Phase Meeting July 8, 2014.
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Fusan Chen, Wen Kang, Mei Yang*
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Electron Collider Ring Magnets Preliminary Summary
The MEIC electron ring as the large ion booster
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Status of RCS eRHIC Injector Design
Presentation transcript:

Magnets Technologies for NOνA Transfer Line (& RR30 section) July 21-23, 2009

Magnet Count Summary TypeComment Total Required From Tunnel Available From Storage Construct New Modify Existing RQNxRecycler style 20 in. permanent magnet quad All Somewhat PDSNew SmCo5 style double dipole PDDPDD 8 Gev style double dipole, existing style PDDWPDD dipole design, reduced field MGSRecycler dispersion suppressor mirror magnet ADCWModified B1 style to open aperture MLAWMI style injection Lambertson, new, modified ILAMI style Lambertson MQTOld MR style quad trim HDCOld MR style horizontal corrector used in Recycler VDCOld MR style vertical corrector used in Recycler MCHLEP Horizontal corrector MCVLEP vertical corrector 22000

Where are they coming from? Existing magnets available from tunnel or storage –MGS, RQNx (re-measure, re-trim) New construction of existing designs –PDD New constructions of modified designs –MLAW, PDDW Modification of existing magnets –ADCW New construction of new design –PDS

Permanent Magnet Quadrupoles (RQN) Modification of existing RQM’s Need 48; including spares 49 are available Issues to be addressed –It will be necessary to re-trim and re-measure all –R&D has occurred and will continue relating to trimming measuring, and brick magnetization –The R&D effort on spares is being used to get us back in the “permanent magnet business”

Permanent Magnet Quadrupoles (RQN)

PDS Why a new dipole? –Need to fit a dipole in an area with small beam separation –Build a magnet with SmCo5 (stronger) instead of Strontium Ferrite Issues –New design –Industry will build a small prototype. From this we will establish the design parameters of the final magnet Injection Line 847 To Recycler 848 MI PDS Vertical switching magnet 8 Gev line V2 (PDD)

PDS Many different designs considered Separation of only~6.25” between MI-8 and RRInj beam centers Must have 2’’x4’’ aperture for beam pipe. Need 2.312kG vs kG of PDD Integrated strength, T-m0.6 Center field, T0.24 SmCo5 residual flux density Br, T0.86 SmCo5 coercive force Hc, kA/m662 Air gap, mm52 Magnet length, m2.5 Magnet width, mm270 Magnet height, mm160 Volume of SmCo5, cu. inch600 Cost of PM material, $ (at 31$/inch3)18,600

PDS

Stretched wire, and rotating coil measurements of strength performed. Temperature dependence measurements completed Analysis underway Internal Design Review expected in August 09

PDD Injection line requires 5 new magnets Existing design, tooling, procedures and measurement –Not used for 10 years –Needs refurbishment

PDD

PDDW Modification to PDD dipoles ~10% of the ferrite bricks (and the corresponding compensator) will be replaced with aluminum blocks (and strips). Will require more tuning than the PDD dipoles. Sufficient strontium ferrite bricks and compensator material exists.

MGS One in the tunnel and one in storage Will need to be measured

Vertical Bend Dipoles (ADCW) –Injection line – 1 each –Extraction line – 2 each –Rebuild old 8GeV line dipole with ~3/4’’ spacer in back leg to open gap. More than enough magnets have been found. The beamline design has been optimized such that heat load and field leakage issues are not a concern. For a ~33mr bend will run at <700 Amps ADCW

Laser cutting of spacer lamination would have been cheaper, however specification were not achieved. Stamping is necessary Vendor stamping of laminations underway (samples expected soon) Coils on old ADC’s were found to be unsecured. This will be address in the modification

ADCW Modeling For ~33mr the magnet needs to run ~670 Amps ADC has run in this range. An unmodified ADC has been measured

ADCW Modeling We have identified a power supply sufficient for 15hz magnet testing purposes, and plan to measure the first magnet at a 15hz pulse rate. Measurement of the 1 st modified ADCW is expected ~ October 2009

MLAW Rotated/Modified Lambertson 5-6 mm gap increase will increase the current requirements by14% over the smaller aperture The required bend, however, will be ~14mr (40% of current bend) The new Lambertson will need to run ~430Amps (currently runs at ~950Amps) Circulating Beam Injected Beam (upstream/Lambertson end) Injected beam (downstream/RR beampipe end) With a modified MLA Solid lines: 6  Dashed lines: 10 

MLAW Two (2) MLAW Lambertson magnets, one for the Recycler injection line and one for the RRMI30 transfer line will be fabricated These will be a modified version of the magnet currently used for injection from MI ‑ 8 to the Main Injector. Spacers to increase

MLA Measurements In the range we will be running the Lambertson, (~430A) the field strength is linear MLA002 has had stretched wire measurements of strength and field shape Summary of MLAW vs MLA model in NOvA docDB doc 3155 ( docdb.fnal.gov:440/cgi- bin/ShowDocument?docid=3155 ) docdb.fnal.gov:440/cgi- bin/ShowDocument?docid=3155

Conclusions No new “groundbreaking” work will occur. Most work consists of modifications of existing magnets or new fabrication of magnets which are either existing designs or modifications to existing designs (MLAW, PDDM, and PDDW). Working with spare permanent magnets will continue to refresh “forgotten” permanent magnet knowledge Fabrication of magnets with SmCo5 can be tricky, but industry has experience with them. Currently we are testing a prototype in order to finalize a production design