Commissioning Forms & Procedures ESCONDIDA CONSTRUCTION COMPLETION PHASE CIVIL PROCEDURES INSTRUMENTACION PROCEDURES Testing Test of Density In Field Z01.

Slides:



Advertisements
Similar presentations
Mitigation of AC Induced Voltage On Buried Metallic Pipelines
Advertisements

Commissioning Approach Integrated Service Solutions
Electrical & Instrument Construction Department
MEP201 Mechanical Engineering Drawing 1st semester
Setup/Installation/Operation of an Environmental Control Unit (ECU)
1 Reminder: Resistivity (ohms) is the reciprocal to conductivity (micro-Siemens)
Quad Plus Shredder Drive Maintenance Joe Kowalkowski Engineering Manager – Recycling Industry
Activity INDUSTRY OIL EXTRACTION CONSTRUCTION INDUSTRY ENVIRONMENTAL PROTECTION ENERGY SCOPE OF SERVICES 1.
PUMP STATION ELECTRICAL DESIGN
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Power Status Thomas Nehring Conventional Facilities Advisory Committee Review October 5-6, 2010.
Introduction To Programmable Logic Controllers
The art of Engineering
COMPANY PROFILE PYRAMID ENGINEERING PRIVATE LTD. THE COMPANY The Company was established in 2007, with a small group to provide Plant Maintenance, Small.
Page 1 Contracts Overview Ken Blackler 21 May 2015 Assembly and Installation Industry Information Day Disclaimer: The views and opinions expressed herein.
EET Survey of Electronics
MC and Commissioning Preparation
Chapter 18 Foundations.
Chapter 19 Charging Systems.
Pharmaceutical Water Systems Alain Kupferman Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
-P&ID- Piping & Instrument Diagram
E VERY L IFE H AS A P URPOSE… Chillgard ® L Series Refrigerant Monitors.
2 Instructor Training MPTT Flow Loop System VLP-TRN-MPTT.
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT Ed Freeman Engineering Manager 1.
MEP201 Mechanical Engineering Drawing 1st semester
BP, OQ & You. 2 Why do we have OQ? Walnut Creek 3 Bellingham Washington.
Materials And Construction Technology Materials And Construction Technology PALESTINE UNIVERSITY Chapter No.#8 Mechanical Works Dr. Ali Ibrahim Tayeh.
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
Vacuum system.
Section 703 Apparatus Inspection. Procedures The driver/operator should follow a systematic procedure for inspecting apparatus This ensures that all important.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
Grow Your Business 1 st Annual Building Services Outreach Session October 18, 2013.
Aeronautical drafters prepare engineering drawings that detail plans and specifications used in the manufacture of aircraft, missiles, and related parts.
Importance of Maintenance HPDC Foundry
Utility Engineers, PC.  Generation  Transmission  Distribution.
Facts About the Energy Industry  By 2015, 35 percent of the workforce (approximately 200,000 high-skill, high- wage workers) may need to be replaced.
THE IMPORTANCE OF SANITARY SURVEYS by Mary L. Howell, Backflow Management Inc.
WELCOM TO EGIQC. EGIQC Engineering Group For Inspection & Quality Control.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Installation of the T600 at Fermilab CSN2, September 22,
Ross Parkman PE Ryan Wester PE Central Chiller Plant Experience Big Ten and Friends Mechanical and Energy Engineering Conference October 1, 2013.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
TROUBLESHOOTING ELECTRIC MOTORS
Site lay out Tanks area Building area Unloading area GT21 GT22GT23 GT24.
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
AGENDA INDUSTRIAL DAY – Rome
The Control of Hazardous Energy (Lockout-Tagout)
He Plant, LN2 Systems and Commissioing
Chapter 9 Safety Permit Systems
Organization Chart Part II.
Forging new generations of engineers
Module 3 Domestic Heating/MMA Welding
The Control of Hazardous Energy (Lockout-Tagout)
Emergency Electrical Power Supply for Buildings
Forging new generations of engineers
Overarching Commissioning Plan
Testing Plan and Status
Installation Binder / IRR – an example
Heating, Ventilation and Air Conditioning HVAC
Presentation transcript:

Commissioning Forms & Procedures ESCONDIDA CONSTRUCTION COMPLETION PHASE CIVIL PROCEDURES INSTRUMENTACION PROCEDURES Testing Test of Density In Field Z01 Inspection / Tests of Arides in Plant and Work Z04 Modified Proctor Result Z03 Compacted Ground Reception Z02 Inspection of Installations of Boxes, Stairs and Platforms Z07 Control List - Assembly Structure Z06 Resistance of Compression of Concrete Summary Z05 Inspection Report Z10 Buildings Acceptance Z09 Torque Bolts Report Z08 Mortar of Leveling Z11 Reception of Excavation Z14 Inspection Before Placing the Concrete Z13 Drained Control Concretes Z12 Reception Excavations for Structural Foundations Z17 Protocol Reception Compacted Ground Z16 Concrete in Special Climatic Conditions Z15 Paving Inspection Report Z20 Movement of Earth Protocol Z19 Plants Location Tests In Situ Z18 Check List - Gravel Z23 Check List - Asphalt Irrigations Z22 Check List - Primer In Field Z21 Finished Painting Inspection Report Z25 Preparation of Surfaces and Painting Report Z24 Transmitter-Transducer Calibration Test Record (I01) Annunciator Test Record (I04) Local Indicator Test Record (I03) Process Activated Switch Calibration Test Record (I02) Instrument Loop Test Sheet (I06) Motor Operated Control Valve Test Record (I05) P R O C E D U S MECHANICAL PROCEDURES Transmitter-Transducer Calibration Test Record (I01) Annunciator Test Record (I04) Local Indicator Test Record (I03) Process Activated Switch Calibration Test Record (I02) Instrument Loop Test Sheet (I06) Motor Operated Control Valve Test Record (I05) ELECTRICAL PROCEDURES Motor Run-in Data Coupled Test E34 Motor Run-in Data Uncoupled Test E33 CONSTRUCTION TESTING - PHASE ELECTRICAL PROCEDURES ADMINISTRATION PROCEDURES Equipment Bus Insulation-Resistance Test E02Record E04 Equipment HIGH POTENTIAL Test Record Megger Test Record E01 Transformer Oil Dielectric Test Record E20 Overhead Line Tower Test Record E12 Grounding Grid Resistance Test Record E10 Trays/Stairways Porthole Cables Inspection E35 Generator Test Report E-24 Check list-Seals and drainages E38 Check List - Ilumination E37 Conduit on Surface E36 Subterranean Cable Installation Inspection E40 Underground Electrical Canalization Inspection E39 Interrupting Panels 480 Volts Installation E43 Inspection of Installation in field of Collector Bus Duct E42 Check list of field Installation of cable E41 Assembly of Switchgear Inspection E46 Mesh to Earth Inspection E45 Check List of Electrical Inspection of Field Installation E44 Inspection of Installation of Power and Control Electrical Cable E47 Construction A13 System Walkdown Notification- Vendor End-of-Service Notification A11 Corrective Action Required A23 HOUSE KEEPING PROCEDURES INSTRUMENTACION PROCEDURES And Test I10 Fibre Optic Cable Inspection PIPING PROCEDURES Piping Test Record P01 Radiographic Advances in Pipe Welding Record P12 Flushing and Chemical Cleaning P10 Tank Hydrostatic Test Record P02 Radiographic Inspection Status Record P15 Filed Welding Daily Record P14 Thermal Coating Inspection Report P13 Blind Bridles test P18 Heater Piping Record P17 Board Orifice Index P16 Penetrating Liquid Test Record P21 Paint Inspection Record P20 Isolated Bridles Filed Test Record P19 Welding Procedure Specification (Page 1) P24 Record of Radiographic Inspection P23 Soldering Summary Report P22 Welders Summary Report P27 Weld Repair Record P26 Welding Procedure Specification (Page 1) P25 Qualification of Soldering P30 Qualification Soldering Record P29 Approval of Procedures Report P28 Topographic Reception Act P31 CABLE PROCEDURES Continuity Test Record C03 Cable High Power Test Record C02 Megger Test Record C01 MECHANICAL PROCEDURES Mechanical Equipment Belt-Chain Alignment Record M02 Mechanical Equipment Coupling Drive Alignment Record M03 PRE OPERATIONAL TESTING PHASE LUIBRICATION PROCEDURES MECHANICAL PROCEDURES INSTRUMENTACION PROCEDURES Mechanical Equipment Lubrication Record M01 Conveyor General Checklist M20 HVAC Balancing Test Record (Cubic Meter / Min) M06 Mechanical Equipment Test Record M04 Motor Run-in Data Coupled Test M25 Motor Run-in Data Uncoupled Test M24 Transmitter-Transducer Calibration Test Record I01 Annunciator Test Record I04 Local Indicator Test Record I03 Process Activated Switch Calibration Test Record I02 Instrument Loop Test Sheet I06 Motor Operated Control Valve Test Record I05 PRE-COMISSIONING - PHASE DLC/PLC PROCEDURES INSTRUMENTACION PROCEDURES Control Systems Communications Test Form D01 DCS Functional Design Specification D02 DCS - Analog Input D05 DCS - Discrete Output D04 DCS - Discrete Input D03 PLC - Discrete Input D07 DCS - Analog Output D06 PLC - Discrete Output D08 Instrument Calibration I07 Verification of Instruments Record I08 Local Indicator Test Record I12 RTD Test Record I11 Control Valve Calibration Test Record I09 RTD Loop Test I16 Instrument Equipment Inspection I15 ADMINISTRATION PROCEDURES MECHANICAL PROCEDURES Pre-Commissioning Completion Certificate A06 Mechanical Completion Protocol A16 System Walkdown Notification- Pre-Commissioning A14 Turnover Package Review A12 Mechanical Completion Certificate A19 Mechanical Equipment Test Record M04 Compressor Inspection Record M16 HVAC Balancing Test Record (Cubic Meter / Min) M06 HVAC Balancing Test Record (CFM) M05 Pump Test M21 Conveyor General Checklist M20 Agitator or Mixer Inspection Record M18 Motor Run-in Data Uncoupled Test M24 Mechanical Equipment Inspection M23 System Mechanical Checklist M22 Motor Run-in Data Coupled Test M25 ELECTRICAL PROCEDURES Electrical Conduit Inspection Report E-27 Electrical Conductor Inspection Report E-26 Uninterrupted Power Supply System Test Record E-25 COMISSIONING - PHASE GROUP ADMINISTRATION INSTRUMENTACION PROCEDURES Load Test Protocol A25 System Walkdown Notification- Commissioning A15 Commissioning Completion Certificate A07 Instrument Calibration I07 Verification of Instruments Record I08 Local Indicator Test Record I12 RTD Test Record I11 Control Valve Calibration Test Record I09 RTD Loop Test I16 Instrument Equipment Inspection I15 OPERATION - PHASE Operational Establish normal operation Performance tests Prepared by HATCH, based on material from the MEL Phase IV Commissioning Plan