Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Slides:



Advertisements
Similar presentations
Signing LOI for ILD detector concept at ILC Deadline LOI submits march 31st 2009.
Advertisements

The SiD concept Yannis Karyotakis LAPP Annecy / IN2P3 March 21 st ‘05.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
ILCSC and WWS News David J. Miller: ILCSC news for MDI workshop, 6 January ILCSC Membership Recent ILCSC meetings Worldwide Study Plans.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
General news CLIC detector and physics meeting at LC2013, May 30 th 2013 Lucie Linssen L. Linssen, CLIC detector & physics meeting, May 30th
Charge to the SiD Workshop Andy White University of Texas at Arlington.
Status Report of the LCC Detector R&D task force Maxim Titov (CEA Saclay) Jan Strube (Tohoku University)
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
7 August, 2006Gakujyutsu Sousei Monthly Meeting1 The Detector Chapter of The Detector Concept Report 学術創成定例月会議 8月7日 宮本彰也.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
M. Oreglia, ALCPG07, 23 Oct 2007Slide 1 (of 1) Introduction to SiD; Preparing for a LOI Quick overview of SiD Charge to SiD speakers Substance of.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
1J. Brau - ILCSC Meeting - Beijing - August 19, 2004 Organizing the Global Experimental Program The ILCSC has asked the Worldwide Study, as its Physics.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
1 IRES, version 0: an overview Vladimir Markhonko United Nations Statistics Division The Oslo Group on Energy Statistics Fifth meeting, Cork, Ireland,
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
International Recommendations for Energy Statistics (IRES): A progress report Fourth Meeting of the UN Committee of Experts on Environmental-Economic Accounting.
J. Brau SiD Workshop (RAL) April 14, Recent Developments on Global Detector Coordination.
The FDES revision process: progress so far, state of the art, the way forward United Nations Statistics Division.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
SiD Vertexing and Tracking Contribution to the LOI Bill Cooper Marcel Demarteau Ron Lipton Rich Partridge Dong Su For the SiD Vertex/Tracking Group SiD.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
ILD LoI (Calorimeter part) 2008/12/14 K. Kawagoe.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008.
KA12 Marcel Demarteau Fermilab DOE Site Visit August 23,
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Relations with concept groups
Oct 22 Group Leaders Planning meeting
Mark Palmer for the CESRTA Collaboration
SiD Calorimeter R&D Collaboration
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Preparations for the SiD Workshop at Fermilab, April 9-11
CLIC-ILC BDS & MDI work.
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
The SiD Detector Outline Overview
January Collaboration Meeting
Technical Design Report preparation
The DBD: Outline and Scope
LCLS Linac Technical Design Review Charge
Exit Capacity Substitution and Revision
Presentation transcript:

Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia

Philip Burrows SiD Workshop, SLAC 2/03/092 Thanks! To the very many SiD colleagues who have worked hard to provide results + material for the LoI! i.e. ALL of you!

Philip Burrows SiD Workshop, SLAC 2/03/093 The Good News! ‘Public’ draft of LoI:

Philip Burrows SiD Workshop, SLAC 2/03/094 This Workshop Invite comments + feedback on LoI Dedicated talks on each section Talks on benchmarking results Sessions for revision + editing Dedicated session for general discussion – Tuesday 17.00

Philip Burrows SiD Workshop, SLAC 2/03/095 Outline Reminder of LoI scope History of drafting process Status of LoI Suggested action plan for completion

Philip Burrows SiD Workshop, SLAC 2/03/096 Reminder of scope (Yamada Oct ) ‘Loi should contain: information on proposed detector, its overall philosophy, its sub-detectors and alternatives, and how these will work in concert to address the ILC physics questions’

Philip Burrows SiD Workshop, SLAC 2/03/097 Reminder of scope (Yamada Oct ) ‘Evaluation of detector performance should be based on physics benchmarks … some same for all LoIs … some chosen to emphasise the particular strengths of the proposed detector’

Philip Burrows SiD Workshop, SLAC 2/03/098 Reminder of scope (Yamada Oct ) ‘discussion of integration issues with the machine … state of technological developments for the components … alternative technological options … further R&D should be identified … with timelines and milestones … a preliminary cost estimate’

Philip Burrows SiD Workshop, SLAC 2/03/099 Reminder of scope (Yamada Oct ) ‘In addition, should present: structure of group … resource needs and evolution in time … enable the reader to judge the capacity and seriousness of the groups to carry out the work until the EDR’

Philip Burrows SiD Workshop, SLAC 2/03/0910 Additional questions (IDAG June ) 1. Sensitivity of different detector components to machine background as characterized in the MDI panel. 2. Calibration and alignment schemes. 3. Status of an engineering model describing the support structures and the dead zones in the detector simulation 4. Plans for getting the necessary R&D results to transform the design concept into a well-defined detector proposal. 5. Push-pull ability with respect to technical aspects (assembly areas needed, detector transport and connections) and maintaining the detector performance for a stable and time-efficient operation. 6. A short statement about the energy coverage, identifying the deterioration of the performances when going to energies higher than 500 GeV and the considered possible detector upgrades. 7. How was the detector optimized: for example the identification of the major parameters which drive the total detector cost and its sensitivity to variations of these parameters.

Philip Burrows SiD Workshop, SLAC 2/03/0911 IDAG Mandate (Yamada June ) 1. Are the physics aims of the detector convincing for an experiment at ILC? 2. Is the detector concept suited and powerful enough for the desired physics aims and the expected accelerator environment? Namely, is the arrangement of the employed detector components adequate? 3. Do the mechanism for the push-pull operation, related alignment and calibration methods enable the desired switching process? 4. Is the detector feasible? Namely, is the required R&D for the selected technologies advancing fast enough so that they can be completed during the design phase? Are the estimated cost and the way to obtain it reasonable when examined at the time of LOI? 5. Is the group powerful enough to accomplish the required design work through the technical design phase?

Philip Burrows SiD Workshop, SLAC 2/03/0912 Executive summary (Nov. 08) YIKES!

Philip Burrows SiD Workshop, SLAC 2/03/0913 Updated executive summary $%*&£*%$£!!!!

Philip Burrows SiD Workshop, SLAC 2/03/0914 Updated executive summary $%*&£*%$£!!!! CENSORED

Philip Burrows SiD Workshop, SLAC 2/03/0915 A Brief History Oct 07: Yamada’s charge June 08 (Warsaw): clarified scope issues w. IDAG October 08 (SLAC): agreed basic outline and assigned ‘responsibles’ November 08 (Chicago): discussed status, revised outline, timeline December 08: collected all first-pass materials Jan/Feb 09: 2 drafts to Advisory Group b’marking, tracking, calorimetry, muons, cost, DAQ February : draft to whole SiD group

Philip Burrows SiD Workshop, SLAC 2/03/0916 LoI Framework 1.Introduction 2.Subsystems 3.MDI + global issues 4.Phys. performance/benchmarking 5.Cost estimate 6.R&D issues

Philip Burrows SiD Workshop, SLAC 2/03/0917 LoI Framework (Nov. 08) 1.Introduction (5) 2.Subsystems (45) 3.MDI + global issues (10) 4.Phys. performance/benchmarking (25) 5.Cost estimate (5) 6.R&D issues (5) Total (c. 100)

Philip Burrows SiD Workshop, SLAC 2/03/0918 LoI Framework (Mar 08) 1.Introduction (5) 15 2.Subsystems (45) MDI + global issues (10) 5 4.Phys. performance/benchmarking (25) 37 5.Cost estimate (5) 7 6.R&D issues (5) TBD Total (c. 100)164

Philip Burrows SiD Workshop, SLAC 2/03/0919 LoI Framework 1.IntroductionJaros ILC physics SiD rationale + overview Polarimetry and energy spectrometry ILC environment +backgrounds

Philip Burrows SiD Workshop, SLAC 2/03/0920 Aside on energy + polarimetry Pan-concept ILC note describing E, P systems In LoI we make key points and link to this document

Philip Burrows SiD Workshop, SLAC 2/03/0921 LoI Framework 1.IntroductionJaros ILC physics SiD rationale + overview Polarimetry and energy spectrometry ILC environment +backgrounds Good shape: needs minor edit + new fig.

Philip Burrows SiD Workshop, SLAC 2/03/0922 LoI Framework 2. Subsystems Vertex + tracking system Calorimeters Magnet Muon system DAQ + electronics Forward detectors

Philip Burrows SiD Workshop, SLAC 2/03/0923 LoI Framework 2. Subsystems Vertex + tracking system Demarteau et al CalorimetersWhite/Frey et al MagnetKrempetz et al Muon systemBand/Fisk et al DAQ + electronicsHaller et al Forward detectors Maruyama/Markiewicz/Nauenberg et al

Philip Burrows SiD Workshop, SLAC 2/03/0924 LoI Framework 2. Subsystems Vertex + tracking system Track digitisation session missing Performance section needs beefing up Major edit

Philip Burrows SiD Workshop, SLAC 2/03/0925 LoI Framework 2. Subsystems Calorimeters Needs rationalising Non-baseline  appendix (?) Major edit

Philip Burrows SiD Workshop, SLAC 2/03/0926 LoI Framework 2. Subsystems Magnet Good shape: minor edit

Philip Burrows SiD Workshop, SLAC 2/03/0927 LoI Framework 2. Subsystems Muon system Non-baseline  appendix (?) Good shape: minor edit

Philip Burrows SiD Workshop, SLAC 2/03/0928 LoI Framework 2. Subsystems DAQ + electronics Good shape: minor edit

Philip Burrows SiD Workshop, SLAC 2/03/0929 LoI Framework 2. Subsystems Forward detectors Good shape: minor edit

Philip Burrows SiD Workshop, SLAC 2/03/0930 LoI Framework 3. MDI + global issues Breidenbach, Oriuno SiD assembly Push-pull

Philip Burrows SiD Workshop, SLAC 2/03/0931 Aside on MDI issues Pan-concept MDI-D note specifying MDI ‘boundary conditions’: See Marco’s talk for details/discussion ILC-Note-2009-nnn March 2009 Version 4, Functional Requirements on the Design of the Detectors and the Interaction Region of an e+e- Linear Collider with a Push-Pull Arrangement of Detectors B.Parker (BNL), A.Mikhailichenko (Cornell Univ.), K.Buesser (DESY), J.Hauptman (Iowa State Univ.), T.Tauchi (KEK), P.Burrows (Oxford Univ.), T.Markiewicz, M.Oriunno, A.Seryi (SLAC)

Philip Burrows SiD Workshop, SLAC 2/03/0932 LoI Framework 3. MDI + global issues Breidenbach, Oriuno SiD assembly Push-pull Good shape: needs minor edit, figures to add

Philip Burrows SiD Workshop, SLAC 2/03/0933 LoI Framework 4. Physics performance + benchmarking Barklow, Nomerotski, Graf Simulation Benchmark reactions Performance results

Philip Burrows SiD Workshop, SLAC 2/03/0934 LoI Framework 4. Physics performance + benchmarking Barklow, Nomerotski, Graf Simulation Benchmark reactions Performance results Await significant update of results [this workshop], then thorough edit

Philip Burrows SiD Workshop, SLAC 2/03/0935 LoI Framework 5. Cost estimateBreidenbach et al

Philip Burrows SiD Workshop, SLAC 2/03/0936 LoI Framework 5. Cost estimateBreidenbach et al Minor edit, figure format, physics vs. cost

Philip Burrows SiD Workshop, SLAC 2/03/0937 LoI Framework 5. Cost estimateBreidenbach et al Minor edit, figure format, physics vs. cost 6. R&D issuesWhite/Brau

Philip Burrows SiD Workshop, SLAC 2/03/0938 LoI Framework 5. Cost estimateBreidenbach et al Minor edit, figure format, physics vs. cost 6. R&D issuesWhite/Brau Lot of R&D text in document – needs collating + rationalising in light of R&D proposals

Philip Burrows SiD Workshop, SLAC 2/03/0939 IDAG Mandate 1. Are the physics aims of the detector convincing for an experiment at ILC?

Philip Burrows SiD Workshop, SLAC 2/03/0940 IDAG Mandate 2. Is the detector concept suited and powerful enough for the desired physics aims and the expected accelerator environment? Namely, is the arrangement of the employed detector components adequate?

Philip Burrows SiD Workshop, SLAC 2/03/0941 IDAG Mandate 3. Do the mechanism for the push-pull operation, related alignment and calibration methods enable the desired switching process?

Philip Burrows SiD Workshop, SLAC 2/03/0942 IDAG Mandate 3. Do the mechanism for the push-pull operation, related alignment and calibration methods enable the desired switching process? Good on ‘mechanics’ of push-pull More needed on alignment + calibration?

Philip Burrows SiD Workshop, SLAC 2/03/0943 IDAG Mandate 4. Is the detector feasible? Namely, is the required R&D for the selected technologies advancing fast enough so that they can be completed during the design phase? Are the estimated cost and the way to obtain it reasonable when examined at the time of LOI?

Philip Burrows SiD Workshop, SLAC 2/03/0944 IDAG Mandate 4. Is the detector feasible? Namely, is the required R&D for the selected technologies advancing fast enough so that they can be completed during the design phase? Are the estimated cost and the way to obtain it reasonable when examined at the time of LOI? Some work to do outlining R&D scope, timescale …

Philip Burrows SiD Workshop, SLAC 2/03/0945 IDAG Mandate 5. Is the group powerful enough to accomplish the required design work through the technical design phase?

Philip Burrows SiD Workshop, SLAC 2/03/0946 IDAG Mandate 5. Is the group powerful enough to accomplish the required design work through the technical design phase? Not addressed in current draft!

Philip Burrows SiD Workshop, SLAC 2/03/0947 Additional IDAG questions 6. A short statement about the energy coverage, identifying the deterioration of the performances when going to energies higher than 500 GeV and the considered possible detector upgrades.

Philip Burrows SiD Workshop, SLAC 2/03/0948 Additional IDAG questions 6. A short statement about the energy coverage, identifying the deterioration of the performances when going to energies higher than 500 GeV and the considered possible detector upgrades. Not addressed in current draft!

Philip Burrows SiD Workshop, SLAC 2/03/0949 Additional IDAG questions 7. How was the detector optimized: for example the identification of the major parameters which drive the total detector cost and its sensitivity to variations of these parameters.

Philip Burrows SiD Workshop, SLAC 2/03/0950 Additional IDAG questions 7. How was the detector optimized: for example the identification of the major parameters which drive the total detector cost and its sensitivity to variations of these parameters. Cost model well described. More on ‘optimisation’?

Philip Burrows SiD Workshop, SLAC 2/03/0951 LoI Timeline (Nov. 08) November 15: 1 st draft subsystem reports feedback to subsystems December 15: 1 st draft physics/benchmarking chapter identify and fill gaps, iterate etc. January 15: revised subsystem sections focussed collaboration meeting early Feb? February 15: complete draft for collaboration review March 15: final draft ready March 31: submit to Research Director

Philip Burrows SiD Workshop, SLAC 2/03/0952 Suggested timeline for completion March 9: minor edits done March 13: draft R&D chapter draft ‘group structure’ tracking + calorimetry sections benchmarking chapter March 20: FINAL DEADLINE FOR MATERIAL March 25: final draft for review March 31: submit to Research Director

Philip Burrows SiD Workshop, SLAC 2/03/0953 We can do it! To the very many SiD colleagues who have worked hard to provide results + material for the LoI! i.e. ALL of you!