49 th EWG Meeting, Gyeongju, Korea June 22-26, 2015.

Slides:



Advertisements
Similar presentations
Copyright © 2011 APEC Secretariat Report to 41 st EWG Meeting Vancouver 9-12 May, 2011 Presented by Luis Enrique Vertiz Program Director.
Advertisements

APEC Project Management: Concept Note Development to The Full Project Proposal Presented by Khemrutai Khemmarat Department of International Economic Affairs.
2006/TPT-WG-28/HOD/006 PROJECT MANAGEMENT – For Information – APEC Secretariat 28 th APEC Transportation Working Group Meeting Vancouver, Canada 5-8 September.
Governance and delivery through Opt-In Organisations.
GEF Expanded Constituency Workshop
Florida Atlantic University Overview of Operating Budget Process Presentation to the Florida Atlantic University Foundation, Inc. Board of Directors February.
Second Independent Evaluation Roles / Responsibilities & Relationships.
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
‘safer sustainable communities’ ‘safer sustainable communities’ ‘safer sustainable communities’ Proposal for Sustaining the CEOs’ Forum to 2013 Tony Pearce.
REPORT TO GRPE 68 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document No. GRPE (68 th GRPE, 9-10 January, 2014,
APEC Communications & Public Affairs 15 th ATCWG Meeting 3 March 2011 APEC Secretariat.
Project Application Guidance Hendrix.edu/CSFC. Summary Overview of the CSFC Committee Meetings Committee Membership Funding Sources Funding Guidelines.
MSc STUDENTS MUST REGISTER VIA MINERVA FOR EPIB 690 or BIOS 690 (THESIS COMPONENT – REQUIRED COURSE) Only register for this course ONCE.
Letter of intent By to predefined format (Word file, see guidelines) Chair Scientific Committee Coordination EO To all members of.
APEC Project Management Workshop Presented by Rongvudhi Virabutr Department of International Economic Affairs Ministry of Foreign Affairs 19 July 2010.
REVIEW OF CMS “INITIAL APPROVAL” OF RHP PLAN AND FOLLOW-UP REQUIREMENTS May 8, 2013 REGION 10.
Copyright © 2010 APEC Secretariat. Project Management : Implementation and Monitoring Presented by (Art) Phanpob Plangprayoon.
Matching Grants. Address humanitarian conditions that benefit a community in need Direct Rotarian involvement Match at least two countries (host and international)
FAO/WHO Codex Training Package Module 2.6 FAO/WHO CODEX TRAINING PACKAGE SECTION TWO – UNDERSTANDING THE ORGANIZATION OF CODEX 2.6 How does Codex elaborate.
FOR PROGRAMS AT THE 2016 ALA ANNUAL CONFERENCE IN ORLANDO JUNE 23-28, 2016 ACRL 2016 Program Planning.
2015 A PPLICATION P ROCESS FOR APEC-F UNDED P ROJECTS Chen-Sheng Ho, Ph.D. Associate Research Fellow Chinese Taipei APEC Study Center Taiwan Institute.
APEC Project Circle Presented by Khemrutai Khemmarat Department of International Economic Affairs Ministry of Foreign Affairs 15 December 2010.
APEC Secretariat Presented by Luis Enrique Vertiz © 2011 APEC Secretariat Report to EWG 42 Kaohsiung.
The Global Fund - Proposal Process & Round 8 February 19, 2008.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
APEC Secretariat Presented by Penelope Howarth, Program Director, APEC Secretariat EWG49 - June 2015, Gyeongju, Korea Copyright © 2015 APEC Secretariat.
© Commonwealth of Australia 2003 The Quality Assessment Framework.
May, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan Report on APEC Low-Carbon Model Town Task Force.
Overview of Thesis Submission and Examination Helen Buckley, Research Student Administrator, Graduate Studies Office (GSO).
FAO/WHO Codex Training Package Module 4.2 JOINT FAO/WHO CODEX TRAINING PACKAGE MODULE FOUR – SCIENTIFIC BASIS FOR CODEX WORK 4.2 Requesting, accessing.
ASEAN Regional Forum Intersessional Support Group Meeting Ottawa, April 3-4, 2008.
APEC Project Management Workshop Presented by Rutchanee Uerpairojkit Department of International Economic Affairs Ministry of Foreign Affairs 21 June.
Working Party on Brakes and Running Gear (GRRF) General information Participants/Address list A provisional address list has been prepared: please check.
Project Application 6 th edition Guidebook on APEC Projects Wednesday 15 February 2006.
Copyright © 2010 APEC Secretariat. PROJECT GUIDEBOOK & MULTI YEAR PROJECTS Presented by: NADIRA MAILEWA Director (Program) Project Management Unit (PMU)
ENHANCING OUR UNDERSTANDING OF APEC CONCEPT NOTE & PROPOSAL FORMS Chen-Sheng Ho, Ph.D. Associate Research Fellow Chinese Taipei APEC Study Center TIER.
Copyright © 2010 APEC Secretariat. Report to EWG 47 Kunming, China Jonghan Park Program Director 21 May 2014.
November 2013 Shobu Nagatani Agency for Natural Resources and Energy METI, Japan Progress of the APEC LCMT Project Phase 4 6 th APEC LOW CARBON MODEL TOWN.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
APPLICATION PROCESS FOR APEC-FUNDED PROJECTS Chen-Sheng Ho, Ph.D. Associate Research Fellow Chinese Taipei APEC Study Center Taiwan Institute of Economic.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
Copyright © 2010 APEC Secretariat. Report to EWG 48 Port Moresby, Papua New Guinea Jonghan Park Program Director 19 November 2014.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
AMENDMENTS TO THE PROGRAM COMPLIANCE REVIEW GUIDE July 2006 IFTA Annual Business Meeting.
Copyright © 2010 APEC Secretariat APEC Seminar Institute of Diplomacy and International Affairs Taipei, January 10-11, 2013 Prepared by Steve Chen,
Nunavut Wildlife Research Trust and Studies Fund March 2015.
Copyright © 2012 APEC Secretariat. Presented by: Andrew LLOYD, Program Director PROJECT MANAGEMENT UNIT (PMU) APEC Secretariat APPLYING FOR APEC FUNDS:
1 Earthquake Response Cooperation Program for Energy Supply Systems (Phase 2) Proposed by Chinese Taipei May 18, 2001 APEC EWG 21 Kuala Lumpur, Malaysia.
GTFORCIDI Summary of mandates and proposal for streamlining sectoral ministerial processes.
APEC EGEE&C REPORT TO EWG 52
Overview of APEC project procedures
Annex III to BS/SC/PDF/A(2003)1
Informal document GRE-77-18
Remarks on the Tenure and Promotion Process
Overview of APEC project procedures
Parliament and the National Budget Process
APEC EGEE&C REPORT TO EWG 50
Report by the VICH Steering Committee on issues raised by Forum members during the 1st Outreach Forum meeting Hervé Marion, DVM VICH Secretariat.
Expert Group on New and Renewable Energy Technologies (EGNRET)
Flowchart for External Student Fundraising
WG Chair: Charles Ehrlich, NIST, U.S.A. CIML Member
EGNRET 27 Zhuhai, China 9-11 October 2006 Cary Bloyd
Process Reforms for Session 1, 2018
Peer reviews DIME/ITDG Steering Group 15 February 2019 Claudia Junker
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points
EGNRET 28 Kawasaki, Japan January 29-30, 2006 Cary Bloyd
Joint Meeting: Finance and Appropriations Comittees
APEC Project Management
APEC Project Cycle Overview
TFEIP Methods and Procedures
Presentation transcript:

49 th EWG Meeting, Gyeongju, Korea June 22-26, 2015

 Need to clarify and streamline project proposal process  Seek to ensure proposals are closely aligned with the EWG Strategic Plan and priorities and guidance from Ministers and Leaders  Will clarify process for: ◦ Concept note (CN) endorsement, co-sponsorship and submission, and ◦ Final proposal and quality assessment framework (QAF) review. 2

Endorsed and ranked at 2 nd EWG meeting 2015 Endorsed and ranked at 1st EWG meeting 2016 Project Session 1, 2016 APEC Secretariat Deadline: ~ February Concept Notes to be distributed to Expert Groups/Task Force at least 4 weeks in advance of second 2015 EWG meeting. - Concept Notes to be distributed to EWG 2 weeks in advance of second 2015 EWG meeting. - Concept Notes to be endorsed and ranked by group at second 2015 EWG meeting. Project Session 2, 2016 APEC Secretariat Deadline: ~ July Concept Notes to be distributed to Expert Groups/Task Force at least 4 weeks in advance of the first 2016 EWG meeting. - Concept Notes to be distributed to EWG 2 weeks in advance of the first 2016 meeting. - Concept Notes to be endorsed and ranked by group at the first 2016 EWG meeting. 3

 POs must obtain at least two co-sponsors ◦ Co-sponsorship must be conveyed in writing through the economy’s EWG or Expert Group (EG)/Task Force (TF) representative (PO to provide a copy with the CN) ◦ Self-funded projects must also obtain at least two co-sponsors.  Once co-sponsors are obtained, PO submits CN through the sponsoring economy’s EG or TF member to relevant EG/TF Chair at least four weeks before the EWG meeting. ◦ Chair will circulate group of proposals to EG or TF members for review and endorsement. 4

 EG/TF members should ensure that CNs: ◦ match goals contained in EWG Strategic Plan, ◦ address gaps not already addressed, and ◦ support Energy Ministers’ and Leaders’ goals and priorities.  Note: only if a project does not fit with the responsibilities of a specific EG/TF or is cross- cutting, may it be submitted directly to the EWG for review. ◦ PO must explain to EWG Secretariat why the project is being submitted directly to the EWG rather than through an EG/TF. 5

 Once approved by EG or TF, submit to EWG for endorsement ◦ EG/TF Chair will forward CN to EWG Secretariat, with copy to APEC Secretariat, confirming EG/TF approval. ◦ EWG Secretariat will circulate CN to EWG members for endorsement. ◦ No changes to the CN are permitted after circulation unless these are required by members for endorsement. ◦ Note: unless projects are submitted at least two weeks before an EWG meeting, they will not be considered for endorsement. 6

 EWG Secretariat will submit CNs to EWG Members 2 weeks before the relevant EWG meeting.  EWG members will discuss and rank EWG CNs at relevant EWG meeting, ensuring projects are aligned with the EWG Strategic Plan and Energy Ministers’ and Leaders’ goals and priorities.  Once endorsed by EWG, EWG Secretariat will submit CNs to APEC Secretariat. ◦ EGs and POs should not submit CNs directly.  Note: EWG Members are encouraged to share EWG ranking with their SOM representatives. 7

 The APEC Secretariat will review CNs received from the EWG Secretariat for compliance with the Guidebook for APEC Projects. ◦ Compliant CNs received by the Final Submission Deadline will be referred to the SOM Steering Committee on ECOTECH (SCE) for consideration. ◦ Non-compliant CNs will be referred back to the PO and sponsoring economy representative for amendment. ◦ If non-compliant CNs are corrected and re-submitted prior to the Final Submission Deadline they will be referred to SCE for consideration.  The APEC Secretariat will inform EWG members (including EG/TF Chairs) of the final list of CNs referred to SCE, as ranked by the EWG. 8

 If approved in principle for funding, APEC Secretariat will notify PO and request a full project proposal and QAF. ◦ APEC Secretariat will also notify EWG members of the full list of CNs approved in principle for funding.  Once QAF is completed by at least 2 economies, PO submits the project proposal and Consolidated QAF document directly to APEC Secretariat with copy to EWG Secretariat. ◦ Any member economy, including co-sponsoring economies, may contribute to a QAF. ◦ Note: QAF requests for any economy must go through the economy’s EWG or Expert Group/Task Force representative. 9

 APEC Secretariat submits the Project Proposal and Consolidated QAF to all EWG members (including EG/TF Chairs) for review and endorsement. ◦ Expert Group/Task Force Chairs circulate to their groups.  After the Project Proposal is endorsed by EWG, the APEC Secretariat will proceed with the formal assessment of the endorsed document and referral for approval.  The APEC Secretariat will inform all EWG members (including EG/TF Chairs) of the final list of Project Proposals approved by the Budget and Management Committee. ◦ Expert Group/Task Force Chairs circulate to their groups. 10