S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.

Slides:



Advertisements
Similar presentations
Xcal commissioning Status report and plans Olivier Deschamps Université Blaise Pascal/IN2P3/CNRS Clermont-Ferrand 0 Calorimeter commissioning meeting 16/01/08.
Advertisements

S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)Overview of the system. 2)Discriminating errors. 3)Tricks. RUNNING PRS AND SPD – FIRST DRAFT TUTORIAL.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Muon commissioning status and plans G.P. C. De Plano.
PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Slide 1 / 14 PSFEB Status Report LHCb Clermont Production Test preview of the PreShower Front-End Boards February the 1 rst, 2007.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
26/11/02CROP meeting-Nicolas Dumont Dayot 1 CROP (Crate Read Out Processor)  Specifications.  Topology.  Error detection-correction.  Treatment (ECAL/HCAL.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
SPD status and last operations A. Carboni, A. Comerma, D. Esperante, E. Picatoste et al. 08SEP2009Calo meeting1.
Trigger Tests Patrick Robbe, LAL Orsay, 8 Feb 2012.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Integration and commissioning of the Pile-Up VETO.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
2009: restart the system: few observations. Hw maintenance week:
Calorimeter Upgrade Meeting - News
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007

S.MonteilPS/SPD COMMISSIONING2 COMMISSIONING MEETING – NOVEMBER 2007 PS/SPD SCHEME  Flash LEDs w/ ODIN signal  Tubes response  VFE integrates signal  Transmission to FE Board  Digitalize and correct PS data DAQ L0 PSTELL1 DAQ/ORWELL HIstogramming Recompute the trigger response TRIGGER 40 MHz Trigger cabling Build Trigger Information Go to SPD CB Go to Validation Board

S.MonteilPS/SPD COMMISSIONING3 COMMISSIONING MEETING – NOVEMBER 2007  Flash LEDs w/ ODIN signal PS: All C-side is measured. Many problems found and fixed in a collaborative work with INR. One problem left : on FEB004 in SM4 (innermost). LED triggered signal driven by internal ChannelB from Croc. FIXED. SPD: All detector is measured w/ list of problems reported (LED triggered with a standalone system). 2 boards (64 channels) w/ no signal. Plus 2 groups of 16 channels broken. PLANNED ON WEEK 7 (INR/BCN work) MAIN MESSAGE: MOST LIKELY IN GOOD SHAPE.

S.MonteilPS/SPD COMMISSIONING4 COMMISIONNING MEETING – OCTOBER ) COMMISSIONING THE TUBES/DETECTOR WITH LEDs SYSTEM Tubes are OK. All relevant projects are now fine (LED and HV). See November talk. SPD measured w/ LED week 6 4) COMMISSIONING THE VFE PS: still clock connection concerns (We lose 64 channels in a once), see Valentin’s talk yesterday. SPD: no major concern. Pedestals and noise fine for both systems. Survey : made easy by the cooling system. Keep in mind we will need a « final » access for visual inspection.

S.MonteilPS/SPD COMMISSIONING5 COMMISSIONING MEETING – DECEMBER ) COMMISSIONING THE TEMPERATURE SYSTEM C-side. The water has been made flowing on Monday, 3rd of December. Project PSDCSTEMP is working with FSM installed. The temperature VFE off is around 16 degrees (actually this is the water temperature). Then switch VFE on for temperature measurements.

S.MonteilPS/SPD COMMISSIONING6 COMMISSIONING MEETING – DECEMBER 2007 C-side. 5) COMMISSIONING THE TEMPERATURE SYSTEM

S.MonteilPS/SPD COMMISSIONING7 COMMISSIONING MEETING – DECEMBER 2007 C-side. 1 VFE IS NOT SUPPLIED. NICE, IT ALLOWS TO SEE THE REFERENCE. 5) COMMISSIONING THE TEMPERATURE SYSTEM

S.MonteilPS/SPD COMMISSIONING8 COMMISSIONING MEETING – DECEMBER 2007 C-side. Actually, we see a regulator board not supplied, because of one miscabled fuse. 5) COMMISSIONING THE TEMPERATURE SYSTEM

S.MonteilPS/SPD COMMISSIONING9 COMMISSIONING MEETING – DECEMBER 2007 Conclusion: Water cooling cools. PSDCSTEMP project is working fine (Maxim Martemiyanov). Temperature on boards (VFE and regulators) is below or about 25 °C. All C-side VFE have been supplied. Few miscabling fixed. All OK. Temperature cut-off has to be DSS-interfaced. I’d suggest 30 °C as a starting value. 5) COMMISSIONING THE TEMPERATURE SYSTEM

S.MonteilPS/SPD COMMISSIONING10 COMMISSIONING MEETING – NOVEMBER ) COMMISSIONING PSFEB (Digitization and data treatment): All PSFEB repaired to cure the delatch problem. All recabled and remeasured. In addition, succesful crate configuration test. Pedestal measurements and subtraction : all measured. Pedestals are stable and noise is satisfactory (PS 1mV, SPD 2 mV). (For other parameters, wait for particles). Scan the phases range (ADC and signal sampling, integration time, sampling the SPD signal). Automated processes exist. Get the adequate synchronization for Croc.

S.MonteilPS/SPD COMMISSIONING11 COMMISIONNING MEETING – OCTOBER ) 1) TIME-ALIGNMENT WITHIN THE BOARDS. Five phasers to be dealt with. Some correlated.Most important.  ADC-FE, the sampling of ADC signal by the FE-PGA.  VFE-ADC, the sampling of VFE signal by the ADC.  VFE, the integration starting time. The Alignment: Fix a  VFE value, scan the allowed (  ADC-FE,  VFE-ADC ) region with pedestals. Fix a correct  ADC-FE, scan the allowed (  VFE -  VFE-ADC ) difference, with LEDs fired by the LHC clock. Select the value for which we get S(BC-1)/S(BC) = 1% ( best  value driven by test beam analysis).

S.MonteilPS/SPD COMMISSIONING12 COMMISIONNING MEETING – OCTOBER ) 1) TIME-ALIGNMENT WITHIN THE BOARDS. Five phasers to be dealt with. Some correlated.Most important.  ADC-FE, the sampling of ADC signal by the FE-PGA.  VFE-ADC, the sampling of VFE signal by the ADC.  VFE, the integration starting time. The Alignment: Fix a  VFE value, scan the allowed (  ADC-FE,  VFE-ADC ) region with pedestals. Fix a correct  ADC-FE, scan the allowed (  VFE -  VFE-ADC ) difference, with LEDs fired by the LHC clock. Select the value for which we get S(BC-1)/S(BC) = 1% ( best  value driven by test beam analysis).

S.MonteilPS/SPD COMMISSIONING13 COMMISIONNING MEETING – OCTOBER ) 1) TIME-ALIGNMENT WITHIN THE BOARDS All C-side is measured. PRS_1 to be completed.

S.MonteilPS/SPD COMMISSIONING14 COMMISIONNING MEETING – OCTOBER ) 2) SYNCHRONIZING CROC All C-side expect PRS_1 is measured. PRS_3 problematic (see Valentin’s talk). PRS_3 Ideal picture (1 board)

S.MonteilPS/SPD COMMISSIONING15 COMMISSIONING MEETING – NOVEMBER ) THE DAQ PATH The two last weeks before Christmas PRS_0 was set on TFC_7 Configure Croc and FEBs at the best measured values. Let FEBs measure the VFE pedestal. Configure the PSTell1 (see StephaneTJ’s talk for a report on problems) Send periodic Trigger. Build the events and ask Orwell to produce a Ntuple (For fun, Olivier D. ran succesfully the presenter). 453 useful events were recorded.

S.MonteilPS/SPD COMMISSIONING16 COMMISSIONING MEETING – NOVEMBER ) THE DAQ PATH The two last weeks before Christmas 13 out 14 boards of PRS_0 FEB_6 is bizarre As an example, look at FEB_4 In that plot, only 64 values of pedestals. We took an even periodic trigger. VFE chips don’t flip.

S.MonteilPS/SPD COMMISSIONING17 COMMISSIONING MEETING – NOVEMBER ) THE DAQ PATH The two last weeks before Christmas As an example, one pedestal of channel 15 (FEB_4). FEB_6 is bizarre. Croc header is an Hcal one as seen in spy memory of Tell1. As a consequence, it is not reconstructed. Must be disabled in Crate configuration. No severe pathology observed elsewhere (no deep scrutiny yet).

S.MonteilPS/SPD COMMISSIONING18 COMMISSIONING MEETING – NOVEMBER Check connectivity (trigger cables) PS NEIGHBOURS (Done, problems found, see yesterday) TVB (on the way, miscabling found, fixed) ECAL1 AND ECAL2 (Started, no problems found so far) 2. Simultaneously get the phasers for incoming data sampling (measuring the allowed intervals and choice a safe phase value). 3. SPD CB backplane connections have been checked OK. 4. Optical link (SPD to selection board) have been checked. 8) COMMISSIONING THE PS/SPD TRIGGER PATH

S.MonteilPS/SPD COMMISSIONING19 COMMISSIONING MEETING – NOVEMBER 2007 OPERATIONS AND PLANNING FOR THE NEXT 4 WEEKS CONCENTRATE ON PRS_0, DEBUG THE WHOLE CHAINS DAQ AND TRIGGER. ONCE HAPPY, ENHANCE THE SYSTEM. Week 4: Power on again and reproduce the latest achievements PS: PSFEB ECS: Update and Tuning. DAQ PATH TEST: Concentrate on TELL1. HARDWARE: Neighbour Trigger cable backplane slot 2 (Pit/Bdg 156). CROC PRS_3 exchange to check the origin of small range. SPD: CB ECS: Installation of SPD CB PVSS Tuning. SW: Installation of the Threshold Scan C++CAT.

S.MonteilPS/SPD COMMISSIONING20 COMMISSIONING MEETING – DECEMBER 2007 Week 5: PS - Complete ECS work. CROC and PSFEB settings. DAQ PATH TEST - Complete TELL1, Orwell, histogramming … TAKE PEDESTALS SPD - Complete ECS work. Bit Error Rate systematic measurements. Threshold_Scan w/ LEDs Generic VFE tests (control, settings, regulator boards). OPERATIONS AND PLANNING FOR THE NEXT 4 WEEKS- C-side

S.MonteilPS/SPD COMMISSIONING21 COMMISSIONING MEETING – DECEMBER 2007 Week 6: PS - Global commissioning week. Data analysis. SPD - Global commissioning week. Common tests of SPD/PS (PRS_2/PRS_3). Sampling phase of SPD data. Time align PS and SPD w/ LEDs. OPERATIONS AND PLANNING FOR THE NEXT 4 WEEKS

S.MonteilPS/SPD COMMISSIONING22 COMMISSIONING MEETING – DECEMBER 2007 Week 7: PS - Make C-side fully operationnal. SPD - LEDs w/ INR SPD and PS - Connectivity test LED by LED w/ dedicated driver board. Check mappings. OPERATIONS AND PLANNING FOR THE NEXT 4 WEEKS

S.MonteilPS/SPD COMMISSIONING23 COMMISSIONING MEETING – DECEMBER 2007 There are specific works which are not mentionned in the mainstream, but mandatory and has to be performed in the periods crates are available : Complete test of all trigger cables. Systematic measurements of the PSFEB phases. Monitoring/Survey of the FE and VFE connections. Access required to reconnect VFE SM2-T01. Should start the time alignment of the trigger path (w/ Rams). Measure Cosmics when possible. OPERATIONS AND PLANNING FOR THE NEXT 4 WEEKS

S.MonteilPS/SPD COMMISSIONING24 COMMISSIONING MEETING – DECEMBER 2007 A-Side : It is not poorly known: both for PS and SPD, Tubes, VFE and FEB channels have been already checked « individually ». It means we are not expecting nasty hardware problems. It is mandatory yet to measure the LEDs for both systems: PS was not measured, SPD showed really weird results. As at some point the works on the two sides compete,. Sergey and Evgueni already started to monitor LED w/ the CAT software. As at some point the works on the two sides compete, we shall aim at making the two actvities quickly as independant as possible. OPERATIONS AND PLANNING FOR THE NEXT 4 WEEKS

S.MonteilPS/SPD COMMISSIONING25 COMMISSIONING MEETING – DECEMBER 2007 A lot has been made. A lot has to be made. C-Side shall be fully operationnal : Week 8. A-side hw checks completed : Week 8. Not a word this week from PS on the monitoring and calibration software, neither on time alignment development or database. In this state of the manpower, we need to rely on unilateral mutualisation of SPD, ECAL,HCAL developments. CONCLUSIONS/MILESTONES