PSB semgrid - wire scanners measurements Emittance working group meeting 13/10/2015 Emiliano Piselli BE-BI-BL.

Slides:



Advertisements
Similar presentations
BE/OP/PSB Section meeting, 23 Oct 2012 Martino Giordano Ferrari - Emiliano Piselli 1 Synoptic Editor & Player …past, requirements, project status, future...
Advertisements

Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB.
Isolde logging data analysis application Andrea Moscatelli Emiliano Piselli Jose-Luis Sanchez Alvarez.
PS wirescanner calibration Student Meeting 10/03/2014 Carolina Bianchini BE-BI-BL.
Numbers
New optics for the PSB measurement line J.L. Abelleira Thanks to B. Mikulec, G.P. De Giovanni, Jean-Francois Comblin MSWG, 13 Feb 2015.
Elias Métral, COULOMB’05, Senigallia (AN), Italy, September 12-16, /29 OBSERVATION OF OCTUPOLE DRIVEN RESONANCE PHENOMENA WITH SPACE CHARGE AT THE.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
1 times table 2 times table 3 times table 4 times table 5 times table
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
1 Experience at ATF To get a low emittance beam Junji Urakawa KEK Circumference: m Arc Cell Type: FOBO Number of Arc Cells: 36 Energy: GeV.
Bernhard Holzer, CERN-LHC Parameter Space for HL-LHC IR8 * IP5 IP1 IP2 IP8 LEB Meeting.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
PS Booster Studies with High Intensity Beams Magdalena Kowalska supervised by Elena Benedetto Space Charge Collaboration Meeting May 2014.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Booster Beam Dynamics Christian Carli On behalf of the team working on and contributing to the study: M. Aiba did all ORBIT simulations (Booster modelling.
WS Calibration (PSB) Student Meeting 11/08/2014 Carolina Bianchini BE-BI-BL.
Specifications for PSB Injection System Upgrade C. Bracco, J. Abelleira on behalf of BTP Acknowledgments: E. Benedetto, C. Carli, V. Dimov, L.M. Feliciano,
Saturday 7ish – refill for RP set-up 9:15 Going for Roman pot alignment. Stefano is coming. 12:10 TOTEM: Alignment of horizontal RPs B2 finished, short.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
G. Ferioli, R. Jung - LHC-BI Review Workshop November 19&20 LHC Screen Profile Monitors G. Ferioli, R. Jung Introduction BTV LHC layout Monitor set-up.
G. Trad on the behalf of the BSRT team LHC BI 2015 summary 13/11/2015.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
LHC LHC performance with low-emittance h=9 beam Focus on emittance preservation M. Kuhn, H. Bartosik, B. Dehning, A. Guerrero Ollacarizqueta, V. Kain,
LHC Emittance Preservation MD 3 - Preliminary Results M. Kuhn, V. Kain, G. Arduini, J. Emery, W. Hofle, A. G. Ollacarizqueta, F. Roncarolo,
Tables Learning Support
Beam Wire Scanner for PS/SPS/PSB Mechanical 3D Model Review (for BE/RF-ABP Impedance meeting 02.Nov.2015) Dmitry Gudkov Mechanical Engineer BE/BI-ML.
ATF Damping Ring in 2010 autumn Multibunch instability study Measurement (S. Kuroda, T. Naito and K. Kubo) and Calculation of ion trapping (Kubo)
Saturday 9 th April 10:24 Finally « 600 » bunches 14:30 Dump the 600 x :00 Loss maps Green light for 800 bunches 18:40 Fill for 800 bunches 20:48.
BWS E. Piselli – J. Emery On behalf of the BWS working group people.
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
LHC LHC Wire Scanners: Updates on Measurement Accuracy Emittance Meeting 18 November 2015 Maria Kuhn – 18 November 2015 Many thanks to G. Baud, E. Bravin,
Instrumentation Status Throughout the Accelerator Complex in Operation’s Point of View B. Mikulec BE/OP Based on input of many colleagues from the.
Statistics 2015 Fixed Target CT/MTE and LHC BRIGHTNESS Eric Veyrunes, Johan Dalla-Costa, Diego Perez.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
PS2 beam parameters and proposal for aperture strategy M. Benedikt , PS2 meeting1Beams and apertures, M.Benedikt.
Operational BWS usage statistics and open issues 2 nd Operational BWS meeting 01/12/2015 E. Piselli – A. Cudny.
LIU Wire Scanner Project
LHC Wire Scanner Calibration
Wire Scanner / A.Demougeot
LIU Wire Scanner Milestones June 2017
Space charge studies at the SPS
ISOLDE Interlocks MSWG 13 August 2013 K. Hanke, E. Piselli KH.
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
Emittance growth AT PS injection
PS wire scanner failures
LHC wire scanners status
PS operational beams 15 September 2017
Monday 14th March Second fill with pilot + 3 nominal bunches
LHC Emittance Measurements and Preservation
Times Tables.
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
LHC Injection and Dump Protection
Wire almost entirely through beam before BLM triggers dump
Transverse emittance measurements
PSB magnetic cycle 160 MeV to 2 GeV
Energy Calibration of the SPS with Proton and Lead Ion Beams
Transverse emittance measurements from FWS
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring
First meeting of the LIS section: Welcome to the new members!!
3 times tables.
6 times tables.
Saturday 1st October 03:05 UPS trip at point 5: 07:00 Visit Access
PSB magnetic cycle 900 ms MeV to 2 GeV
THANK YOU for helping make tonight possible
Presentation transcript:

PSB semgrid - wire scanners measurements Emittance working group meeting 13/10/2015 Emiliano Piselli BE-BI-BL

14/10/2015 Emiliano Piselli 2 Measurements performed Isolde beam Intensity: 180E10, 500E10, 650E10 Vertical & Horizontal 10m/s & 15m/s 20 measurements

14/10/2015 Emiliano Piselli 3 Measurements performed Intensity @15m/s Ring 1 Hor Emittance

14/10/2015 Emiliano Piselli 4 Measurements performed Ring 1 Hor Check calibration tables

14/10/2015 Emiliano Piselli 5 Measurements performed Intensity @15m/s Ring 1 Vert Emittance

14/10/2015 Emiliano Piselli 6 Measurements performed Ring 1 Vert Check calibration table 15m/s

14/10/2015 Emiliano Piselli 7 Measurements performed Intensity @15m/s Ring 2 Hor Emittance

14/10/2015 Emiliano Piselli 8 Measurements performed Ring 2 Hor Check calibration tables

14/10/2015 Emiliano Piselli 9 Measurements performed Intensity @15m/s Ring 2 Vert Emittance

14/10/2015 Emiliano Piselli 10 Measurements performed Ring 2 Vert OK

14/10/2015 Emiliano Piselli 11 Measurements performed Intensity @15m/s Ring 3 Hor Emittance

14/10/2015 Emiliano Piselli 12 Measurements performed Ring 3 Hor Check calibration tables

14/10/2015 Emiliano Piselli 13 Measurements performed Intensity @15m/s Ring 3 Vert Emittance

14/10/2015 Emiliano Piselli 14 Measurements performed Ring 3 Vert Check calibration tables

14/10/2015 Emiliano Piselli 15 Measurements performed Intensity @15m/s Ring 4 Hor Emittance

14/10/2015 Emiliano Piselli 16 Measurements performed Ring 4 Hor Check calibration tables

14/10/2015 Emiliano Piselli 17 Measurements performed Intensity @15m/s Ring 4 Vert Emittance

14/10/2015 Emiliano Piselli 18 Measurements performed Ring 4 Vert OK

14/10/2015 Emiliano Piselli 19 Next... LHC25 beam data analysis LHC50 beam measurements and data analysis Calibration tables regeneration PSB & PS PM saturation measurements …

14/10/2015 Emiliano Piselli 20 Bettina, PSB operators Thanks to...