Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.

Slides:



Advertisements
Similar presentations
Developing the Learning Contract
Advertisements

Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
Migrant Education Comprehensive Needs Assessment
Standards Definition of standards Types of standards Purposes of standards Characteristics of standards How to write a standard Alexandria University Faculty.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Overview of the Board’s Quality Management Plan. Topics in this Session  Quality System Overview  Overview of the contents of the Board’s Quality Management.
Bureau of Land Management Regulations Washington State Association of Counties Cooperating Agency & Coordination Training November 22, 2013 – Vancouver,
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
Identifying and Selecting Projects
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Office of Migrant Education: Comprehensive Needs Assessment Pilot Arizona Component.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Opportunities for RAC Participation. Three Part discussion General presentation; Example of oil and gas decision making; and Panel Discussion of RAC involvement.
Comprehensive Guidance and Counseling
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Draft RMP/EIS. Objectives Write a draft land use plan and EIS. Issue a draft land use plan and EIS for public review.
Quality Improvement Prepeared By Dr: Manal Moussa.
REVIEW AND QUALITY CONTROL
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Legal Framework for BLM Planning. Objective Describe the major laws and regulations that guide and influence planning at BLM.
1 Cooperating Agency and Coordination Training Washington State Association of Counties Friday, November 22, 2013 Victoria Barr, Oregon/Washington State.
Implementation of DOE Order 450.1: Self-Declaration and Report Letters Steven R. Woodbury US Department of Energy March 9, 2005.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Training of Process Facilitators Training of Process Facilitators.
Vision, Goals, Objectives, and Alternatives. Objectives  Define vision, goals, objectives, and alternatives within the planning context.  Describe collaborator.
INTOSAI Public Debt Working Group Updating of the Strategic Plan Richard Domingue Office of the Auditor General of Canada June 14, 2010.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Cooperating Agencies & Coordination Federal Land Policy and Management Act (FLPMA) and BLM Regulations Federal Coordination with Local Government Hosted.
Risk and Subaward Management under the Uniform Guidance U.S. Department of Education.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Bilingual Students and the Law n Title VI of the Civil Rights Act of 1964 n Title VII of the Elementary and Secondary Education Act - The Bilingual Education.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Copyright 2008  Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling.
Introduction 1. Purpose of the Chapter 2. Institutional arrangements Country Practices 3. Legal framework Country Practices 4. Preliminary conclusions.
2.2 Acquisition Methodology. “Acquisition methodology” – the processes employed and the means used to solicit, request, or invite offers that will normally.
Planning for Travel and Transportation Management National Training Center Course # Unit Four Travel Management Plans.
1-2 Training of Process Facilitators 3-1. Training of Process Facilitators 1- Provide an overview of the role and skills of a Communities That Care Process.
Guide for Rural Local Officials Evaluating Your Input into the Statewide Transportation Planning Process Developed by the National Association of Development.
Office of Performance Review (OPR) U.S. Department of Health and Human Services (DHHS) Health Resources and Services Administration (HRSA) Stephen Dorage.
On Site Review Process Office of Field Services.
On Site Review Process Office of Field Services Last Revised 8/15/2011.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Cave and Karst Management Through Land Use Planning James Goodbar Sr. Cave Specialist Bureau of Land Management Cody, Wyoming May 12-16, 2014 Aaron Stockton.
Planning for Travel and Transportation Management
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
Monitoring and Evaluation. Objective Identify appropriate monitoring techniques. Identify approaches to evaluating plan implementation and effectiveness.
Continual Service Improvement Methods & Techniques.
Session 2: Developing a Comprehensive M&E Work Plan.
IMPLEMENTING LEAPS IN CENTRAL AND EASTERN EUROPE: TRAINERS’ HANDBOOK Monitoring and Evaluating Results.
FUNDING YOUR PROGRAM How do you make it all happen?
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Data Collection & Management: Observational Data Plan (ODP) & Data Management Plan (DMP) Sarai Piazza Craig Conzelmann.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
BLM Decision Making Process
“The people’s forests” Public Participation in National Forest Planning Susan Jane Brown, Staff Attorney Western Environmental Law Center The National.
Nursing Process Applied to Community Health Nursing
Assessment and Feedback – Module 1
TechStambha PMP Certification Training
Project Charter I want to design a project
National Environmental Policy Act (NEPA)
IS YOUR LOCAL GOVERNMENT PREPARED
Presentation transcript:

Preparation Plan

Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss key processes in its preparation. Identify important information sources when developing a preparation plan.

Importance of the Preparation Plan It is the starting point for the planning effort. Clarifies direction of the planning process and initiates the collaboration. Establishes the foundation for the plan by identifying preliminary planning issues and preliminary planning criteria. Defines data and information that are needed to support the planning effort.

Importance of the Preparation Plan Identifies what skills are needed to address the planning issues. Defines work priorities and responsibilities of the planning team. Provides a schedule for plan completion. Establishes internal and external coordination for involved agencies.

Key Contents of the Preparation Plan Scope of the planning effort (including the plan boundary) Anticipated issues and management concerns Work priorities Roles and responsibilities of the planning team Internal and external coordination for involved agencies (public participation plan)

Key Contents of the Preparation Plan (Cont.) Preliminary budget. Planning schedule and steps of the planning process. The preparation plan can form the basis for a statement of work if all or parts of the plan are to be completed by a contractor.

Anticipated Planning Issues and Management Concerns Anticipated issues and management concerns are initiated by the BLM field office staff and field office manager. Formal public participation activities, such as public meetings, are not yet considered at this stage. Preliminary issues are identified based on staff and managers’ knowledge of the planning area and its users. Management concerns are generally program- specific and may not be externally generated or controversial, but still deserve consideration in the plan.

Roles and Responsibilities  Develop a team list that includes the core interdisciplinary team, extended interdisciplinary team, and management team.  List roles and responsibilities for each member of the team.  Ensure that each team member fully understands their responsibilities.

Public Participation Plan  Identify desired outcomes of the public participation process.  Identify potential cooperating agencies.  Identify and describe the interested and affected public.  Identify and describe techniques to ensure meaningful participation by the public and cooperating agencies throughout the process.  Describe how public participation will be documented and used.

Budget  Identify costs associated with plan development including data gathering and management, BLM and contract staff, travel, public participation (scoping notices, scoping meetings, hearings, websites), publication, and any supporting costs.  Address the level and sources of funding provided by the field or state office, as well as increased funding needs.

Schedule and Planning Process  Provide an estimated schedule to complete the plan. Include general steps in the planning process and target completion dates.  Include direct planning actions and support actions and note whether they are expected to be developed concurrently or consecutively.  Allow for internal interdisciplinary team and management review, as well as reviews by the state office and Washington office, and any cooperating agency reviews.  Include contractor selection and award if applicable.

Information Sources for Preparation Plan GIS and other data Interdisciplinary team knowledge and experience Land use plan evaluation Collaborative groups Analysis of the Management Situation Pertinent laws, regulations, and planning documents (preliminary planning criteria)

GIS and Other Data Create a list of available data and explain the importance of the data in addressing anticipated issues. Identify potential data gaps. Create a realistic strategy for acquiring critically needed data. Appendix G of the Land Use Planning Handbook further addresses data management.

Land Use Plan Evaluation Purpose: to assess role of existing plan decisions in achieving presently desirable conditions. Assess validity of decisions relative to NEPA requirements. Identify which plan decisions can be carried forward into new plan. Follow guidelines on page 33, Section V, of Planning Handbook (H ).

Preliminary Planning Criteria  Planning criteria serve as functional sideboards to which all new planning decisions must conform.  They include a compilation of pertinent laws, regulations, program guidance, and existing studies.  Preliminary criteria are developed by the BLM interdisciplinary team and provided to the public for comment.  The planning criteria are further refined as part of public and agency scoping.

Preliminary Planning Criteria (Cont.)  These criteria provide the basis for data collection needs.  They also guide the development of the plan by ensuring identified issues are addressed.  BLM Planning Handbook, Appendix F-1, Section C.

Basic Sources of Planning Criteria FLPMA requirements BLM Planning Regulations (43 CFR ) Other federal environmental and resource management laws Cooperating agencies’ planning criteria Collaborating groups’ planning criteria

Remember to Identify Resources Needed to Prepare RMP and EIS Availability of BLM planning and technical staff Availability of cooperating agency staff Availability of funds for outsourcing: Planning Technical Public outreach Procedural