NA62 CV activities Piero Valente 5 th September 2012 1.

Slides:



Advertisements
Similar presentations
Page 1 Strategy & Technology Strategy & Technology Joe Gomez BEng (Hons), MSc, MBA, CEng, MEI, MInstR Joe Gomez BEng (Hons), MSc, MBA, CEng, MEI, MInstR.
Advertisements

Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Given Connections Solution
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LHC Hardware Commissioning Review May 2005 T.Pettersson - EDMS: TS Department Utilities Safety Access SU - a plea for co-ordination of co-activities.
University of Toronto Mississauga Campus Capital Projects University of Toronto Mississauga Campus: Capital Projects Erindale College Council | March 9,
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Trade Skills Print Reading and Ductwork. 2 Drawings are a useful tool in manufacturing and construction because most people find it difficult to.
N O R T H A M E R I C A C O M M E R C I A L TDP
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
PRESENTATION FOR POLO SETTIMO TORINESE PROJECT Nov.25 th.2009.
Global Design Effort1 September 20-22, 2006 MAC Review Power and Water breakout (mixed results) Marc Ross GDE.
Grow Your Business 1 st Annual Building Services Outreach Session October 18, 2013.
Refurbished Booster RF John Reid October 24, 2012.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Requirements for computing room A. Gianoli, M. Serra, P. Valente.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Cooling & Ventilation feed-back M. Nonis – EN/CV.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Installation of the T600 at Fermilab CSN2, September 22,
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Enhancing The Efficiency Of New And Existing Cooling Systems Dr Robert Lamb CEng FInstR Group Sales & Marketing Director Star Refrigeration Ltd.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Group Status Report 2 MIDTERM Waste Heat Recovery from PV Panels.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Update on the PSB Cooling and Ventilation Systems
Part 4 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Introduction to Mechanical Engineering
Schedule CM SPS G.Vandoni.
Home Energy Savings Program Wyoming
IT-4189 Supply and installation of a cryogenic distribution system
Francois and Lau EATM 17 July 2012
EHN1 Extension planning
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
EN-CV interventions during EYETS for PS and PSB
Insertable B Layer Cooling System
ACS news Circulator TCU: control tests in progress All cavity racks
Cryo stop of P8 on 1st of November
IBBelle: Status Commissioning at MPP Transport to KEK
EcoTech Heating and Controls LTD Commercial Boiler House Install
Operator Training Requirements
Aziz AMAMOU EACM – 21th May 2019
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

NA62 CV activities Piero Valente 5 th September

Building 918 HVAC – Contractor : ARCADE UK – Contractor is on site: corrective action, mainly concerning acoustic – First set of tests on next week – Need to evaluate the need of acoustic insulation in false ceiling 2

T10 cooling station – Contractor : Iniziative Industriali – Primary and secondary pipes are already installed – Electrical connection on time (begins today) – Skid on time (transported on site week 37) – Control: week 39 – Commissioning: week

Cryo pumps cooling – Flexible pipes to be connected only when compressor will be in place – The rest is ok 4

PPG Galleries – Definitive solution on-going (tight schedule) – Temporary solution has already been considered (alarm to be sent to HVAC surface control panel) – Need to have leakage tightness assesed (door) 5