Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.

Slides:



Advertisements
Similar presentations
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Advertisements

Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
Status of ATF/ATF2 and machine schedule in this fall Impact of the earthquake Recovery status, alignment Schedule in this fall N. Terunuma, KEK.
ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
FFS Issues in the 2011 autumn continuous operation Toshiyuki OKUGI (KEK) 1/13/2011 The 11 th ATF2 project meeting SLAC, USA.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
June 30, th ATF2 Project Meeting Andrei Seryi for the ATF2 team May 2010 Continuous Run Operation.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Operational Experience with ATF2 Beam Diagnostics Glen White, SLAC On Behalf of ATF2 Collaboration TIPP, Chicago, June
EXT: Summary of activities, software development, and tuning performance 11th ATF2 Project Meeting, January M. Woodley1/29.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Mark Woodley, SLAC5th ATF2 Project Meeting (December 19, 2007)1 ATF2 Layout/Optics (v3.8) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing.
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Wakefield effect in ATF2 Kiyoshi Kubo
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
ATF2 Status N.Terunuma, KEK
Special ATF Session - ATF/ATF2 day on 28th September -
Expected hardware status and Priority of the commissioning task
Emittance Diagnostics
Philip Bambade, Andrei Seryi, Toshiaki Tauchi
13th ATF2 Project Meeting Summary
Emittance Dilution and Preservation in the ILC RTML
Auxiliary Positron Source
Beam-based alignment measurements
Status of ATF/ATF2 and machine schedule in this fall
Junji Urakawa (KEK) for ATF International Collaboration
Strip-line Kicker R&D at KEK-ATF
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
ATF2 Layout/Optics (v3.6) Existing ATF Extraction Line
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008

Beam line commissioning DR study ( fast ion, DR emittance … ) Hardware study at the extraction line ( FONT, Laser Wire … ) Device Commissioning for ATF2 (cavity BPM, Mover, Guarder, Magnet PS ) Extraction line tuning and study ( dispersion, coupling correction, emittance growth at extraction… ) ATF2 final focus line study ( beam size tuning, stabilization … ) ATF2 Start early 2009 ~ ? Schedules of ATF2 commissioning Reduction of radiation loss early December Radiation Inspection Fast Kicker Study ?? ( Not yet decided ) The “fast kicker study” will be used the special setting. Injection stabilization We are here ! Toshiyuki Okugi, ATF2 beam commissioning meeting ( 2008/7/9 )

January 2009 Fast Stripline Kicker study If possible, - DR fine tuning - DR optics diagnostics and BBA - Cavity Compton study and other DR studies Cold Cavity BPM study / RF gun at linac. Beam time ( Two weeks, 21 shifts ) Hardware works Install and uninstall of fast kicker and in-vacuum septum magnet. Install the QS2X Calibrate the stripline BPM readout electronics Fine alignment of ext. and ATF2 line magnets Install the wide aperture QM7R Install the post-IP C-band BPM

February – March 2009 Hardware works Realignment of linac and BT line Beam time ( 5 weeks, 60 shifts ) 30 shifts will be able to spent by DR and other ATF R&D. DR optics diagnostics FONT Laser wire Fast Ion Study Cavity Compton Install the IP-BPM ? Install the FONT kicker and BPM Install the laser wire DR emittance tuning and so on.

ATF2 beam time in February – March ( 30 shifts or more ) Priority studies are hardware related works Calibration of BPM and BBA (EXT and FF) Commissioning of carbon wire scanner Optics modeling and magnet strength test with beam Physical alignment check with beam ( kicker, chamber, … ) Commissioning of IP-BSM Beam tuning developments Beta matching from DR to EXT ( check of QM7R ) Coupling correction with 2 skew quads Dispersion correction Beam size tuning with carbon wire Slow orbit feedback Beta matching from EXT to FF

April – May 2009 Hardware works Install the sweeping magnets ? Beam time ( 5 weeks, 60 shifts ) First trial to beam size tuning with IP-BSM IP feedback test ? Install the IP-BPM ? DR and other ATF R&D. DR optics diagnostics and tuning FONT, Laser wire, Fast Ion, Cavity Compton, … ATF2 studies Coupling, dispersion correction Beam size tuning with carbon wire Slow orbit feedback Beta matching

Discussions When we should install IP-BPM ( hardware is ready ) ? How to manage the beam time and visiting schedule for outside of KEK collaborators ? - We’d better to discuss the beam time and visiting schedule on Feb. and March. ( now or meeting on early January 2009 ) - We’d better to have the meeting around Feb. to March to discuss the beam time and visiting schedule of April and May. When IP-BPM is installed, - cannot switch back to “Radiation Inspection” optics. “Radiation Inspection” optics is easy for cavity BPM calibration and BBA. - may make the background large. Small aperture ( 6mm full height ) and difficult to align to center. What kind of beam optics will use ? Milestones ? -Long term ( by May 2009 ) -Short-term ( every 1 or 2 month )