ZDC CRANE PROJECT Y. Onel September 28, 2011 1. Progress since last meeting Our Mock-up is found at CERN, inspected by CERN Engineering and found satisfactory.

Slides:



Advertisements
Similar presentations
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Advertisements

DOL AME Grant RFPs Manufacturing Lab Equipment Pre-Award Webinar July 25, 2013.
SAROND WELDING s.r.o. is a manufacturing company focusing on deliveries for power-, transportation- and construction engineering businesses. The company.
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Contrôle Interne Avancé-HEC Lausanne-2007/ Thème 9: Decision Making and Relevant Information.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
High Lights of SAP Business One for Manufacturing.
Zebra connectors KAREN PALMER SARAH JONES. Companies Company Price/100 connectors ($) Additional Charges ($) Estimated Delivery notes Fujipoly< 17.13*
. “Saving is the first step to ride a bike” Our Company is located at the heart of Cheaptown, the best stores to shop and nearly 100 thousand people.
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
Chapter 16 Using Math in Sales 1 Marketing Essentials Chapter 16 Using Math in Sales Section 16.3 Purchase Orders and Invoices.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
UNIT 2 - ECONOMICS Economic Responsibility Game. Dates used on each day of this project Day 1 – August 30 – September 5, 2009 Day 2 – September 6-12,
Application of Percents
Presentation of HanKing
Thomasville Quality, Design, Perfection. “Our exquisite furniture insures a transformation from hotel to a place your costumers can call home.” Michael.
Chamdor Plant Tungsten Street Plant Cobalt Street Plant Dedicated Welding And QC Facility Machine Shop THREE FOUNDRIES AND SUPPORTING PLANTS.
Lehtosen Konepaja Ltd is a mechanical engineering company that specialises in the heavy metal industry. The range of production areas includes system deliveries,
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Accounting for a Merchandising Business
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
(Un)employment in Austria by David Wechselberger.
Environmental Scrutiny Committee 16 th May 2005 Bill Taylor – Managing Director Urban Vision Partnership Ltd.
MODULE ? CUSTOMER CHOICE PROGRAM. The opportunity for a retail electric or natural gas customer to choose who supplies their electric or natural gas.
CS28310 An Introduction to Business Processes for Web Developers.
Advaned Planning and Scheduling J.Skorkovský, KPH.
Manufacturing Systems
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
Process Owner Form Company Info Minority and Woman Owned SDB AS9100/ISO 9001 Certified (Since 2004) DDTC/ITAR Compliant SEA Certified Multi-Axis,
Scope Development Component Specification Concept Development Design, Mockup, Engineering Prototyping Production This project timeline template is customizable.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
Construction Eng 221 Project Management and Administration.
Target Cost –Price Determined by Market Target Selling Price- Cost Plus Pricing Time and Material Pricing Transfer Pricing *Negotiated *Cost-based.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Technical Specification Handling Engineering Group.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
Objective Explain major factors to consider in planning new construction or repair work.
UCB Accounting System Review Prepared by: T. Dobson 6/28/01.
IENG 217 Cost Estimating for Engineers Product Estimating.
What is Robotics? Unit 1.1.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
User Interface Screen Shots Iron Wind Metals Shopping Cart Project.
Keith Roberts, P.E. Project Implementation Engineer IDOT – District 9.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
PRODUCTION MANAGEMENT SOFTWARE. WHICH DO YOU PREFER? 2.
Construction Planning and Estimating Construction Technology I Module 2 part 2.
Inventory Management Definition: STOCK:
Your Electricity Expenses During Winter and Summer Cooling fans are an essential component of any electronic system. The reason for this is that electronics.
HF - Fiber and PMT Purchases By Y. Onel U. of Iowa, Iowa City, IA CMS Meeting, CERN, Dec 1-8,01.
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
Unit 3 - The Marketing Mix
Unit 10 Orders Letter.
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
TABLE OF CONTENT INTRODUCTION OVERHAUL PROCESS DOCUMENT REQUIRED
Introduction to New Product Development (Documentation)
Different Types of Freight Shipping and Charges
Status of the PANDA Solenoid Magnet Production in BINP
Asset Development Engineer
Nurturing Maryland’s Growing Additive Manufacturing Sector
Reserved for Intro Picture
Housing Rehabilitation (Remodeling)
ELECTRICAL ESTIMATING SOLUTIONS, PROVIDING BEST SERVICES IN AUSTRALIA.
Marketing/ Sales/Quote Management/ Improvement
Visual inspection machine manufacturer visual inspection machine manufacturer free shipping coupon code: freeshipping on any order from sipotek.net
Status of the PANDA Solenoid Magnet Production in BINP
INVOICE Downloaded from
A FEW MINUTES TO INTRODUCE OUR COMPANY
Pulsar Construction Schedule
Presentation transcript:

ZDC CRANE PROJECT Y. Onel September 28,

Progress since last meeting Our Mock-up is found at CERN, inspected by CERN Engineering and found satisfactory. Our design is now finalized including shop drawings – machining drawings and welding drawings. We have ordered the material and signed a contract with a manufacturer in Iowa thru special University of Iowa contract. This company did an excellent job in the past for Iowa Space Physics Projects and Iowa Satellite construction. 2

Progress We have delivered our Sarco Design to the KU. We have delivered our Bars Design to CERN – Anne Laure. We have purchased small parts and items about 5K. We have to pay our manufacturer > 20K for the delivery. We have to pay to Pfaff-Silberblau >10K for Actuators. We have to also our shop, paint, laser-cutting, materials and shipping etc. 3

Progress Currently the components are being manufacured and/or ordered ( see pictures + Paul Debbins’talk). We have currently funding problem how to pay all these bills since the construction funding is kept at KU and they are not willing to move the funding to Iowa. All these items are under Iowa Contract with some special in- state arrangements for discounts and lower overhead etc for Laser-cuts, special machining at the company and UI machine shop. The shipping and customs will be another problem if the funding is not in Iowa. Iowa Enginnering cost is well covered thru MIT contract by Bolek. (Thanks to Bolek ). We are hoping to ship everything about in two weeks( including the painting). 4

Components and Welding 5

Components and welding 6