TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: 2015-09-09 to 2015-09-13 Agenda Item: TP20, Item.

Slides:



Advertisements
Similar presentations
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to CoU V1a, 20 Jan 2012 Doc: Source: ETSI Agenda.
Advertisements

Date, Location, Host and Scope Date: 17 – 27 March 2014 Location: Automotive Campus, Helmond, Netherlands Host: TASS International Supported by EC Organized.
WG-2 - ARC TP #17 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Test WG (WG6) 2015 Planning TST 15 Source: JaeSeung Song, TST WG Convenor (TTA), Meeting Date: TST WG6_2015_planning.
Testing Framework TST 15 Source: Laurent Velez, ETSI, Meeting Date: TST Testing_framework.PPT.
SECURITY SIG IN MTS 28 TH JANUARY 2015 PROGRESS REPORT Fraunhofer FOKUS.
Date, Location, Host and Scope Date: 17 – 27 March 2014 Location: Automotive Campus, Helmond, Netherlands Host: TASS International Supported by EC Organized.
TST WG Progress Report at TP 15 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Miami, USA Agenda.
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
Progressing the Work on the MAS TR-0006, TR-0007 Group Name: Management Abstraction and Semantics Source: Tim Carey, ALU,
OneM2M Interop Test Event Announcement Group Name: TST 16.2 Source: Jiaxin Yin, Huawei Technologies Co., Ltd. Meeting Date: Agenda Item: TBD.
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Interoperability event proposal Group Name: WG TST Source: Sookhyun Jeon, TTA, Laurent Velez, ETSI, Meeting Date:
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Minutes of the Meeting IoT WG GISFI #7 New Delhi, Dec 19-22,
Recommendations for transfer from TISPAN to 3GPP SP For information Source: Goran Engstrom: TISPAN WG1 chairman Stephen Hayes: 3GPP SA Chairman.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
1 ITU-R Liaison Group Report - Session #67 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
OneM2M Interop Test Event Announcement Group Name: TST 16.2 Source: Jiaxin Yin, Huawei Technologies Co., Ltd. Meeting Date: Agenda Item: TBD.
OneM2M Interop Test Event Announcement Group Name: TST 16.2 Source: Jiaxin Yin, Huawei Technologies Co., Ltd. Meeting Date: Agenda Item: TBD.
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
PROMCODE Technical Committee Convener Call 14 February
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
Interoperability event Sept 2015 Group Name: WG TST Source: Sookhyun Jeon, TTA, Laurent Velez, ETSI, Meeting Date:
Technical questions on oneM2M certification Group Name: TST Source: JaeSeung Song KETI, TST WG Chair Meeting Date: Agenda.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
MoW&M&P Report Group Name: TP18 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
Draft Edge Conformity TG Draft Slide 1 Submission Title: OpenSG San Francisco Opening Report Date Submitted: January 28, 2010 Source: Edge Conformity Task.
ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES.
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
ATS code development workflow Group Name: TST WG Source: Mahdi Ben Alaya, TST WG vice chair, SENSINOV, Miguel.
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
TST WG Progress Report at TP 18 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18, Item.
A discussion on Release duration TP #14 Source: JaeSeung Song, KETI (TTA), Meeting Date: TP Discussion_on_Release_duration.
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Feedbacks on oneM2M certification Group Name: TP Source: JaeSeung Song KETI, TST WG Chair Meeting Date: Agenda Item:
WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item.
September 2002 Brian Mathews - AbsoluteValue Systems Slide 1 doc.: IEEE /554r0 Submission Publicity Committee /.15 Brian Mathews, PC Chair.
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
Discussion points for 2 nd Interop Event Group Name: TST WG Source: Keebum Kim, TTA, Meeting Date: TP#22.
ATS code development workflow Group Name: TST WG Source: Mahdi Ben Alaya, TST WG vice chair, SENSINOV, Miguel.
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
Discussion on Certification Group Name: TST WG Source: JaeSeung Song, WG6 Chair, Meeting Date: TST #21.
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
2 nd oneM2M Interoperability Event Prof. Song JaeSeung (KETI, TST WG Chair) TST Introduction-to-2 nd -interop-event.
Discussion for Testing related Activities Group Name: TP Source: JaeSeung Song, KETI, Meeting Date: Agenda.
TST TTCN-3_development_plan TTCN-3 development plan Group Name: TST WG Source: Easy Global Market (EGM) Meeting Date:
Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Issues on TST #28 (Overview)
6 March 2015 Webex IPv6 over the TSCH mode of IEEE e Chairs:
WG1 status report to TP#15 Group Name: oneM2M TP15
WPM ad-hoc group report TP#25
ETSI NFV POCS and PLUGTESTS
Submission Title: [Proposed project timeline]
9th meeting of the Expert Group on Reporting (22 March 2011)
Presentation transcript:

TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item 10, Reports from Working Groups TP TST Status Report at TP20

Items for INFORMATION  TTA and ETSI propose to co-organize the 2 nd consecutive oneM2M Interop. test event.  Time: A week before TP#23 from Tuesday afternoon (10.May) to Friday (13.May)  3 days and half  Location: TTA, Seongnam-city, Korea (close to Seoul, 20 mins)  Scope: Test specification: TS-0013 TS-0001, 0004, 0008, 0009 and 0010: The recommended specs. Version will be notified 1 month earlier at least. Conformance Testing Tool Demo (if available) TP

Items for INFORMATION TP TP23 TP22TP Online registration -NDA sign -Organizing test sessions - To Update and be stable Spec Preparing official report in TP Interop Follow ups after the event Test Event TP20 Start to discuss 2 nd event Announcement in TP21

Items for INFORMATION  Meeting objectives summary Collaboration on the outcome of the 1 st oneM2M Interop. event  DONE Handle input documents to TS-0013  DONE Handle input documents to TS-0015 & TS-0017 & 0018  DONE Handle input documents to Application Developer TR  DONE TP

Items for INFORMATION  oneM2M SC extends Certification Ad-Hoc.  New Chair and Vice chair have been appointed: Chair: Nielsen Bjarke (Qualcomm) Vice chair: JaeSeung Song (KETI)  Purposes: Discuss certification issues with wider group Consensus on certification related technical and non-technical issues Provide guideline for oneM2M certification to SC  Planned activities: Conference call: 27 th Nov 2015 F2F meeting: 11 th Dec 2015 TP

Items for Discussion  Finalise TS-0013 (interoperability testing). Ready to freeze within 10 days after TP#20 All the agreed documents will be integrated by next Tuesday (17.Nov) After taking one week approval for the final version, TS-0013 is ready to be approved by TP (if TP plans any conference call)  Finalise Application Developer Guide TR-0025 Ready to be included into point release All the agreed documents will be integrated by next Tuesday (17.Nov)  Propose to include both TS-0013 and TR-0025 into the point release TP

Next Steps  Keep working on developing conformance test specifications in particular TSS&TP  Working on analysing testing related requirements  Prepare 2 nd Interop. test event  Support SC certification ad-hoc TP

Action Items Status #Action Item DescriptionOwnerStatus A-WG6-TP20-001Test related requirements analysisMiguel Angel Reina Ortega STARTED A-WG6-TP20-002Prepare the updated TS-0013 and TR-0025 Laurent VelezSTARTED A-WG6-TP20-003Prepare 2 nd Interop. test eventSookhyun JeonSTARTED TP

Next Meetings / Calls Conference Calls – TST#20.1: 24. Nov, 2015, UTC 13:30-15:00 – TST#20.2: 05. Jan, 2016, UTC 13:30-15:00 Face-to-Face – TST#21.0: January 18-20, San Diego, USA – TST#22.0: March 14-18, EU TP