WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.

Slides:



Advertisements
Similar presentations
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
Advertisements

ERCOT Update on PUCT Posting changes DEWG Meeting 11/27/07 Matt Mereness.
DSWG Update to WMS May 17, DSWG Goals Update.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
Loads Acting as a Resource Relationships with QSEs and LSEs
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
NSRS deployment April John Adams ROS – May 12, 2005.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Review of Proposed Zonal Market Improvements ERCOT Board of Directors Meeting February 17, 2009 Dan L. Jones Potomac Economics Vice President Director,
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
ERCOT Emergency Interruptible Load Program Paul Wattles Steve Krein WMS Oct. 13, 2006.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Congestion Management Working Group WMS update 11/7/2012.
EILS Cost Comparison WMS Jan. 28, Background ERCOT procures Emergency Interruptible Load Service three times annually by Contract Period –February-May.
Unit-Specific Bid Limits based on Modified Generic Cost.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee October 9, 2003.
Discuss Options to Improve Market Visibility to RTBES Presented by: Matt Mereness Friday, October 27, 2006.
ERS Update – DSWG Presentation September 21, 2012.
1 TAC Report to the ERCOT Board February 16, 2005.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
Emergency Interruptible Load Task Force Report to TAC November 3, 2006.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
14 Minute Ramp Period Testing Workshop June 30, 2009.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
1 New MO Projects June COMS Extract, Report & Web Services Monitoring & Usage Statistics Jackie Ashbaugh.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee September 4, 2003.
AMIT/DSWG Workshop ERCOT Demand Side Working Group Meeting September 30, 2011 Jay Zarnikau, Frontier Associates.
ERCOT Update on Day-Ahead Extract and other PUCT Posting changes DEWG Meeting 10/29/07 Matt Mereness.
Emergency Interruptible Load Service Paul Wattles ROS Subgroup Feb. 7, 2006.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
Load Participation in Nodal Training Session Update DSWG December 7, 2007.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
QSE Managers Working Group Meeting Notes 9 October, 2008 Report to WMS 22 October, 2008 David Detelich - Chairperson.
COPS PRR 599 Notification for Mismatched Inter-QSE Energy Schedules WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher September 27, 2005.
1 WMS Report To TAC October In Brief One Working Group Report One Working Group Report One Task Force Report One Task Force Report Three Staff.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
TAC Report to the ERCOT Board
Presentation transcript:

WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners

1 DSWG Goals Update

2 Voluntary Load Response and Price Certainty Working Group discussed options to improve visibility to RTBES –Matt Mereness from ERCOT provided DSWG with the technical options for providing closer to real-time pricing information when Non-Spinning Reserve Services (NSRS) are deployed PRR650 was effective 9/1/06 which requires ERCOT to: –Send an emergency notification to all QSEs when NSRS is deployed –Send an emergency notification to all QSEs when NSRS is discontinued –Manually recalculate the MCPE when NSRS is deployed and post new MCPE the next business day ERCOT runs a custom program that creates a market file without NSRS schedules (which are combined with the energy schedules) ERCOT re-runs the market clearing process with these modified schedules to generate the adjusted MCPEs Not performed if there are any binding CSC constraints

3 Voluntary Load Response and Price Certainty (cont.) Modified Competitive Solution Method (MCSM) was removed 10/1/06 by PUCT which removed price corrections, except for held intervals and shadow price errors ERCOT was asked by PUCT staff to look at two alternatives to provide a pricing signal closer to real-time: 1.Running two Market Clearing Engines (MCE) in parallel, one for dispatch, one for pricing » 1a) Run two Market Clearing Engines in parallel, one for dispatch, one for pricing » 1b) Run two passes of the Market Clearing Engine with two different SPD files » 1c) Have vendor modify MCE to add additional step to create separate pricing 2.Post remaining Balancing Energy Services bid stack when NSRS is deployed for Market Participants to download and derive an estimate of revised MCPE Not pursuing at this time

4 Price Certainty Option Summary

5 October 26 th Price Adjustments and Next Steps This summer ERCOT employed a desk procedure that deploys NSRS when reserves are diminishing resulting in more common scenarios of NSRS deploying before the hitting the 95% bid stack (on October 17 th prices decreased) ERCOT’s use of Replacement Reserves may be minimizing the amount of Non-Spin deployed due to bid stack depletion. October 26 was first case of NSRS depletion since PRR650 ERCOT’s intra-day updates (via the ROS exploder) publicize shortfalls in supply. This may be resulting in market behavior that is minimizing the amount of Non-Spin deployed ERCOT needs market participants to formulate PRRs to facilitate desired outcome

6 Current LaaR Participation

7 Full Market Subscription of LaaR at 1150 MWs

8 October 3 rd LaaR Performance Highlights 22 minutes to reach compliance One LaaR trips at 59.8 LaaR manually deployed 17:37:43

9 Aggregate LaaR Response Using IDR Data

10 ERCOT Requesting Update to LaaR Qualification Initial Qualification Enhancements: –Actual interruption required during first 90 days –No notification prior to test Annual Recertification of LaaR Resources: –Actual interruption once a year –Response to Operator VDI that complies with Protocols in lieu of testing Periodic Command and Control Tests: –Hot line call to QSEs with response verification back from party that actually trips the load Formalize Disqualification Criteria: –Failure to meet 10 minute response (two occurrences in 365 day period)

11 Next DSWG Meeting At our last meeting we scheduled our final DSWG meeting for the year on December 8 th Subsequently, the PUC has scheduled additional workshops regarding Demand Response Programs in ERCOT on Friday December 8 th, Monday December 18 th, and Tuesday December 19 th beginning at 9:30 in the Commissioners Hearing Room DSWG will be rescheduled to Friday December 15 th