Global Design Effort - CFS Oct-20-2010IWLC2010 1 ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.

Slides:



Advertisements
Similar presentations
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/2010 DRFS HLRF System KEK S. Fukuda Introduction: Basic Concept of DRFS Progress.
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 LCWS10 in Beijing DRFS Development (S. Fukuda) 27/03/2010 DRFS Development KEK S. Fukuda Introduction : DRFS R&D Plan Talks concerning with DRFS in LCWS10.
Marc Ross Nick Walker Akira Yamamoto XFEL – based HLRF scheme 07 Sept 2010 BAW 1 - Backup HLRF 1.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
Power Supply System for DRFS
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/ Hz Operation in DRFS HLRF System KEK S. Fukuda.
BAW1 RDR Confg For Mntn Rgn (S. Fukuda) 1 RDR configuration for Mountain Region S. Fukuda/KEK.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
ILC TRANSPORT AND INSTALLATION Questions from last CES: Beam height explanation, Transport implications of sloping access tunnels proposed for access to.
HLRF Webex09 (April.3, 2009) 3/4/ Distributed RF-source Scheme (DRFS) First Design Shigeki Fukuda (KEK) Introduction Possible RF-source General Cost.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
KCS and RDR 10 Hz Operation Chris Adolphsen BAW2, SLAC 1/20/2011.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
GDE meeting Beijing (Mar.27, 2010) 1 DRFS LLRF system configuration Shin MICHIZONO KEK LLRF lack layout for DRFS DRFS cavity grouping HLRF requirements.
June Recent Development of DRFS (Fukuda) SCRF-Meeting 1 1 Recent Development of DRFS (Based on Japanese CFS Tunnel Plan) S. Fukuda KEK.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
ESS Linac Upgrade Dave McGinnis Chief Engineer / Accelerator Division May 27, 2014.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Areal RF Station A. Vardanyan
ILC Power and Cooling VM Workshop
Americas KlyCluster Cost Analysis Overview
Q &A for the questions from CFS of April 29,2011
Summary of WG2 :CFS for staging
A frequency choice for the SPL machine: Impact on hardware
DRFS and Low Energy 10 Hz Option
General presentation about recent status of DRFS
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Presentation transcript:

Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto

Global Design Effort - CFS Oct IWLC Contents of Presentation -Boundary condition for single tunnel design - LHC, XFEL Example - Asian Team Design status

Global Design Effort - CFS Oct IWLC Main Linac (ML) RF Unit in RDR - Double-tunnel accelerator configuration - AC plug-in power: 150 kW Output pulse: 120 kV x 130 A = 15.6 MW peak, 1.6 ms, 5 Hz Averaged output power: kW Modulator Efficiency: 83% Power loss: 25.2 kW Input RF power: ~100 W Input DC pulse: 15.6 MW peak, 1.6 ms, 5 Hz Output RF pulse: 10 MW peak, ms, 5 Hz Averaged output power: kW Klystron Efficiency: 65% Power loss: kW Power Loss: ~5.6 kW (7%) Service Tunnel Beam Tunnel m e- ML294 RF units e+ ML290 RF units Total584 RF units Field gradient:31.5 MV/m Energy gain per RF unit :850 MeV (with 22% tuning overhead)

Global Design Effort - CFS Oct IWLC RDR ML RF Unit - Double Tunnel Section -

Global Design Effort - CFS Oct IWLC RDR ML RF Unit - Service Tunnel m Thanks to the FNAL Facilities Engineering Services Section for AutoCAD data!

Global Design Effort - CFS Oct IWLC Cryomodule Assembly with waveguides for DRFS (Beam Tunnel) (Drawing y Matsushita, KEK, RF group)

Global Design Effort - CFS Oct IWLC Clearance Height Transport Space Space reservation for survey Determination of Tunnel Diameter (for Single Tunnel in floor-mount DRFS)

Global Design Effort - CFS Oct IWLC ILC Cryomodule S1-Global Cryomodules are compatible with each other.

Global Design Effort - CFS Oct IWLC m cryostats are combined in tunnel to form a “string”. ILC Cryomodule

Global Design Effort - CFS Oct IWLC Ceiling CM Example XFEL Design Report

Global Design Effort - CFS Oct IWLC XFEL Design Report  5200 mm 645 mm Ceiling CM Example

Global Design Effort - CFS Oct IWLC CM diameter is almost the same! 2335 mm 1700 mm 870 mm 1000 mm Floor CM Example LHC  3800 Tunnel

Global Design Effort - CFS Oct IWLC Floor CM Example LHC  3800 Tunnel # Equipment name# 1Machine cryostat20General services safety 2QRL jumper22General services phones 3Helium warm ring line DN10023Lighting 4Helium recovery line DN15024Electrical powering for transport 5EDA DN15026Space reserved for transport 6EDR DN15028Space reserved for survey 7Water filling DN6529Protection barriers 10Cable tray1 (general services)#Space reserved for an e- machine 11Cable tray3 (power and optical fibers)31Beam loss monitor 12Cable tray2 (signals)33Cable tray 5 (dispersion suppressors) 14Vacuum pumps42Vacuum pumping mobile group 15Electronics chassis81Cablefil 17 Optical fibers  40 83Telex 19Communications antenna cable

Global Design Effort - CFS Oct IWLC Floor CM Example FNAL Project X Test Facility 1846 mm 1222 mm 1219 mm 4826 mm CM1_TUNNEL_XSEC (Materials from Jerry Leibfritz)

Global Design Effort - CFS Oct IWLC Floor CM Example FNAL Project X Test Facility CM1_TUNNEL (Photos from Jerry Leibfritz)

Global Design Effort - CFS Oct IWLC Discussion at KEK for the clearance from Tunnel Wall

Global Design Effort - CFS Oct IWLC Clearance ~500 mm is minimum Current Conclusion for Clearance from Tunnel Wall-

Global Design Effort - CFS Oct IWLC Vacuum pump space was discussed. The present space seems enough to have it under the module body. Cryomodule Position (2) - Clearance from the Floor - Clearance ~960 Beamline height of ~1200 mm

Global Design Effort - CFS Oct IWLC Space Reservation for Alignment

Global Design Effort - CFS Oct IWLC Space Reservation for Alignment This area should be discussed with machine alignment people.

Global Design Effort - CFS Oct IWLC Transport Space XFEL CM Transporter 1400 mm

Global Design Effort - CFS Oct IWLC Transport Space for STEP files to convert design data from IDEAS to INVENTOR. Parts files exceed more than Thanks to XFEL design team !

Global Design Effort - CFS Oct IWLC Space Reservation for Alignment This area should be discussed with machine alignment people mm

Global Design Effort - CFS Oct IWLC Asian Team Design Status 3-D ML DRFS Tunnel Section

Global Design Effort - CFS Oct IWLC DRFS Single Tunnel Section Dimensiona 1800 mm 500 mm

Global Design Effort - CFS Oct IWLC DRFS 2-D Plan & Elevation

Global Design Effort - CFS Oct IWLC Single Tunnel with RDR-HLRF

Global Design Effort - CFS Oct IWLC Single Tunnel with RDR-HLRF

Global Design Effort - CFS Oct IWLC Single tunnel configuration was discussed with the RDR- type HLRF system and with the DRFS type. The ILC cryomodule positioning in the single tunnel was discussed referring to examples (XFEL, LHC, Project X, S1 Global) Asian Team design with 3-D approach has been well progressed during the half period of FY2010. Summary

APPENDIX Boundary conditions and guidelines for design works 30

ML Single-Tunnel Configuration - Distribute RF System (DRFS) - 31 Power Loss: ~5.6 kW (7%) Beam Tunnel e- ML282 RF units e+ ML278 RF units Total560 RF units Field gradient31.5 MV/m Energy gain per RF unit 850 MeV (with 22% tuning overhead)

ML RF Unit - Distributed RF System (DRFS) - 32 X m (~70%) m ~5.4 m (L) (every 4 th units) Beam / Service Tunnel m m Alcove (Every 4 th Units, 152 m) X X One big HV klystron replaced by 13 small klystrons Cooling Water Skid and Common Electricity 1.6 m (W) m (H) 11:30-12:00Shigeki Fukuda, HLRF Requirements

Safety XFEL Design Report