NA62 RICH Gas System V2.0 S. Haider PH/DT/DI LHC-Gas-Project.

Slides:



Advertisements
Similar presentations
Coach Air Conditioning
Advertisements

Operating Nitrox Systems 11 Presented by Nuvair. Operating Nitrox Systems2 Membrane systems produce nitrox efficiently Compressed air flows through the.
HEAT PUMPS.
technical data‘s of lubrication pumps of oil loaded gas compressors medium : lubrication oil with flare gas Low pressure compressors on oil platform 6.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Engineer Presentation
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
Normal Operating Parameters Maintenance Schedule Common Problems Normal Operating Parameters Maintenance Schedule Common Problems ClearWater Tech, LLC.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
Gas Turbine engines.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Scenario for the gas system 1.High cost gas (5 €/l of Xe) 2.High hydrostatic pressure over 7 m height 3.Light and large detectors, no big under- or.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
GD150 Liquid bulk contactless compressor. GD150 Compressors.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Hydraulic Drives and Actuators. Description A hydraulic drive consists of three major parts: The generator (such as a hydraulic pump) driven by an electric.
Design Criteria for LP BYPASS SYSTEM
Air Compressors.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
Installing Vapor Recovery Units to Reduce Methane Losses
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
Comparison of water supply systems Water supply system for MRC-1000
A. Perin, CERN, TE-CRG, 13 June ICL, 13 June 2012 Consolidation of the DFBX CL control system.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
CHAPTER 11 PNEUMATICS TRANSMISION
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Cooling of NA62 vacuum system November 11 th, 2014 E. Harrouch, EN-MEF, on behalf of the NA62 Vacuum Team.
Turbomolecular pump Vahid Bahrami Yekta MBE LAB UVIC.
New 100% oil-free operating elliptical rotary vane vacuum pumps / compressors E PV series with 2 separate compression chambers.
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
Vacuum Fundamentals High-Vacuum Technology Course Week 7 Paul Nash HE Subject Leader (Engineering)
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
R. Than J. Huang P. Orfin T. Tallerico Jan. 19, 2011
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
Oil-free Vacuum Pump / Compressor Today’s Instruments Co., Ltd.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
The PSI protium gas filling system (status report by Claude Petitjean to the Gatchina collaboration meeting June 14-17) Main components of the PSI gas.
Working group meeting 07/05/15. Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and.
New single-chip “box” to test laser soldering in vacuum WP6 meeting, 16/01/14.
Chapter 4 Training Package HCFC Phase-out RACSS – UNEP 2014 Servicing of HCFC/HFC Based Air-conditioners.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
P. M. Follmann, C. Bayer, B. Fischer, M. Wessling, T. Melin
He Plant, LN2 Systems and Commissioing
1.3-GHz Cavity Vacuum Furnace at IB4
SABRE PoP Fluid Handling
Gas system Commissioning procedures and status
Proximity Cryogenics P&IDs meeting
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Gas System Commissioning
Technical data‘s of lubrication pumps of oil loaded gas compressors medium : lubrication oil with flare gas Low pressure compressors on oil platform 6.
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
FIGURE 33-1 A typical fuel tank installation.
Types of Pumps and Film Evaporators Used in Industries
Cryo stop of P8 on 1st of November
SNS Cryoplant Commissioning Past Experiences
HYDRAULIC SCHEME PRESS G SERIES.
Presentation transcript:

NA62 RICH Gas System V2.0 S. Haider PH/DT/DI LHC-Gas-Project

Overview  Requirements  Gas system design  Cost estimate 9/2/20112 NA62 RICH Gas system V2.0, S.Haider

Requirements  Detector is a vacuum vessel (assumption)  V = 200 m 3 100% Neon  Absolute pressure regulation 0 to 1010 mbara  Max pressure 1200 mbara  Accuracy of pressure regulation +/- 1 mbar  Fill flow rate 3 to 10 m3/h  Gas density variations < 1%  Residual gas concentration:  CO2 < 1000 ppm  O2 < 1000 ppm  H2O < 1000 ppm  N2 < 5000 ppm 9/2/20113 NA62 RICH Gas system V2.0, S.Haider

RICH gas system V2.0 9/2/2011 NA62 RICH Gas system V2.0, S.Haider 4

Gas injection 9/2/2011 NA62 RICH Gas system V2.0, S.Haider 5  Two mayor modes:  Filling:  Max injection flow ~10 m3/h ie 20 hours of filling time  Leak compensation:  Small flow gas injection 400 l/h ie 2 mbar/hour compensation capability

Vacuum pump 9/2/2011 NA62 RICH Gas system V2.0, S.Haider 6  Rotary vane pumps  have high pumping speeds (1 day of pumping)  Minimal pressure ~ 0.1 mbar  Not oil free

High pressure pumping system for Neon recovery 9/2/2011 NA62 RICH Gas system V2.0, S.Haider 7  Two pump in series:  First stage: membrane pump that is able to produce suitable vacuum and ~ 2bar at outlet  Second stage: high pressure pump with 80 bar capability (Haug)  200 m3 of Neon need 2.5m3 of high pressure vessel at 80bar  Cleanliness important: completely oil-free compressor.

Cost estimate (rough) Cost estimate Gas injection modulefr. 21,000 High speed vacuum pumpfr. 24,000 1 st stage recovery pumpfr. 15,000 2 nd stage recovery pumpfr. 43,000 Cleaning cartridgefr. 9,000 Racks, valves, piping in racksfr. 30,000 Recovery vessel (3 batteries)fr. 18,000 Electrical modulefr. 25,000 Manpower for racksfr. 30,000 Total version 2fr. 215,000 Installation work in NA62 not costed 9/2/20118 NA62 RICH Gas system V2.0, S.Haider Total version 1 : fr (no under pressure protection)