Fehr & Peers | December 13 th, 2011 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.

Slides:



Advertisements
Similar presentations
Transportation Impact Analysis Presented By Katy Flynn, P.E. Fehr & Peers February 19, 2008.
Advertisements

How Costcos Mega Gas Station Will Create Traffic Congestion An Analysis: Text and Pictures.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri
NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
Bailey Hill Road Safety Coalition Report to Churchill Area Neighbors Julia Pommert and Sue Palsbo January, 2008 Contact:
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
1 Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area Township of West Windsor September 8, 2008 Urbitran | DMJM Harris.
General Overview of Parking Requirements. Standard 8 ½ x 17 feet Parallel 22 x 6 ½ feet 8.5 feet 17 feet 6.5 ft 22 feet.
West Contra Costa Unified School District
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
Reston Master Plan Thoughts on transportation. Focus is important Without the proper transportation groundwork other plans will fall through.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
1 Evaluation of Ports of Entry (POE) for the International Border in the El Paso MPO Study Area.
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
Wimbledon Station - a station fit for Chris Chowns (Principal Transport Planner) Nick Greenwood (Transport Planning Manager) LB of Merton Transport.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Miller Road Feasibility Study & Reconstruction Project Information and Kick-off Meeting Presented by: The Corradino Group of Michigan, Inc. ROWE INC. Genesee.
Traffic Lights Road Signs Road Markings
NORTHFIELD COMMUNITY SCHOOL Middle School Entrance Mill Road Side NORTHFIELD POLICE NJ 1.
Transport.tamu.edu Northside Parking Garage Study TSAC April 3, 2013.
School travel planning an engineer will love. School travel in Moonee Valley Need: A more planned and coordinated approach to active travel program delivery.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Measure 27 City Centre Access Control Katerina Oktabcova Usti nad Labem Municipality.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
Tshwane Line 1 Traffic Simulation Results October 2012.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
Outside Behavior. Be Respectful Play fair – so that others will want to play with you again.
Company LOGO Traffic Impact Study Case: Al-Irsal Center Project in Al-Bireh City Under the Supervision of: Pro.Sameer A. Abu-Eisheh Prepared by: Mohammad.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
DVRPC TMIP Peer Review Dynamic Traffic Assignment (DTA) Oct. 29 th, 2014.
Pinole Valley High School (PVHS) Project Status 1 Facilities Subcommittee Meeting February 10, 2015.
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
FACILITIES MASTER PLAN FMP Review October TIME LINE 2014November 2015 February March April May October / November December Education / Facility.
Travel Reliability – Reliable traffic flow is more important than reducing congestion – traffic congestion is often a sign of an area’s economic vitality.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Fehr & Peers | March 13 th, 2012 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.
Ingress and Egress The means of entering and leaving the site Regulated by state and local governments Width Slope Drive radius Pavement composition Encroachment.
Signs, signals,& Road Markings
INTEGRATING ASSESSMENT OF THE ECONOMIC BENEFITS OF TRANSPORTATION IMPROVEMENTS IN PROJECT-LEVEL ALTERNATIVES ANALYSIS Meiwu An, Pikes Peak Area Council.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
 May 1, 2012 City Council approved lease of premises at MLK to the Lycée Français La Pérouse (the “Lycée Français”)  Under section 16.5, Traffic and.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
FOOTHILL ELEMENTARY TRAFFIC PROBLEM SOLVING May 19, :30 p.m.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
Parking Lot Design Civil Engineering and Architecture
Private Bus Regulations
Montana Driver Education and Training Traffic Control Devices and
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Citrus Park Drive Extension
FM 518 By-pass Traffic Review
Traffic Impact of Pedestrianisation in Stellenbosch
Traffic Flow Improvement at the Gate 1
Elapsed Time.
Proposed Driscoll Expansion Brookline, Massachusetts
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Colorado Avenue University of Colorado, boulder
Evacuation Modelling of Stadia using MassMotion
Presentation transcript:

Fehr & Peers | December 13 th, 2011 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction

Presentation Overview 1.Scope of Work 2.Data Collection and Existing Conditions Analysis 3.Guiding Principles for the Future Access Plan 4.Alternatives Considered 5.Current Plan 6.Discussion / Questions

Scope of Work 1.Data Collection and Field Observations 2.Existing Conditions Traffic Model Development/Validation 3.Development of Access/Circulation Alternatives 4.Analysis of Alternatives 5.District and City Review 6.Selection of Preferred Alternative 7.Construction Period Traffic and Parking Management Plan

Data Collection and Field Observations February 9, 2011 Counted autos, pedestrians, bicyclists, buses 7:00 – 9:00 AM, 2:15 – 4:00 PM Observed directionality, parking behavior, traffic queuing, jaywalking, and unsafe maneuvers AM Peak Hour Observations Traffic queues extend back to shopping center Unsafe pedestrian movements Poorly regulated traffic flows PM Peak Hour Observations Traffic jams on-site Traffic queues from north end to Ramona Unsafe pedestrian movements Poorly regulated traffic flows

Existing Observations

Development of Access/Circulation Alternatives Reduce congestion during peak periods Accommodate drop-offs and pick-ups on-site Accommodate more parking on-site Separate ingress and egress traffic flows Separate traffic flows to/from parking lot and to/from drop-off aisle Provide for safe, controlled pedestrian crossings on Pinole Valley Road Goals:

Alternatives Analysis All alternatives have a new signal at the northern parking lot driveway Alternative 1 : Traffic signal at School Exit/Estrella only Alternative 2 : Traffic signal at Shea/Granada only Alternative 3 : Traffic signal at School Exit/Estrella and Shea/Granada Alternative 4 : No traffic signal at School Exit, Shea/Granada as existing

Alternatives Analysis

Evaluation Matrix

Current Plan: Alternative 3