BCT’s for beam protection L. Søby On behalf of D. Belohrad, L. Jensen and P. Odier 6/12/15Internal workshop ON MPP readiness for MJ beams 1.

Slides:



Advertisements
Similar presentations
Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.
Advertisements

Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Status and plans for LHC DC BCT systems P.Odier DC BCT hardware modifications Proposal for choice of acquisition system (VD80 or 24- bit ADC) for the CCC.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
ERL Differential Current System Status Peter Cameron with contributions from Michelle Wilinski and Christophe DeFrance (Bergoz) 17 Sep 07.
Preconditions for operating at 5 TeV in 2010 Session th January 2010 J. Wenninger BE/OP How to safely reach higher energies and intensities? Settings.
ICS – Software Engineering Group 1 The SNS General Time Timestamp Driver Sheng Peng & David Thompson.
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
B. Todd et al. 25 th August 2009 Observations Since v1.
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
V. Kain AB/OP1Sep 12, 2007 Summary of Discussion on Injection Protection Issues Injection Protection Issues – meeting 22 nd of June V. Kain, A. McPherson,
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
BT/BP AB/CO/MI 17 th September 2008 Safe Machine Parameters Status & Update.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
1 Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag Jörg Wenninger AB-OP-SPS Introduction to ‘injection flags’ Machine.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
AC-Dipole Upgrades LHC Optics Measurement and Corrections review June CERN N. Magnin – TE/ABT/EC Thanks to E.Carlier, R.A.Barlow, J.Uythoven.
1 Commissioning and Operation of the machine protection system L. Ponce Acknowledgements: M. Zerlauth, J. Wenninger, D. Wollmann, V. Chetvertkova, G. Valentino,
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Improvements to the LHC DCCT system P. Odier, C. Barschel, J.-J. Gras, L. Jensen, J. Longo, M. Ludwig, S. Thoulet P.Odier BI day /18.
LCLS MPS Upgrade Gasper Jansa, Luciano Piccoli, Jeff Olsen, Garth Brown, Sonya Hoobler, Stephen Norum, Stephanie Allison, Kim Kukhee Adding BSA.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
The LHCb Online Framework for Global Operational Control and Experiment Protection F. Alessio, R. Jacobsson, CERN, Switzerland S. Schleich, TU Dortmund,
Beam Wire Scanner (BWS) serial link requirements and architecture
Beam instrumentation MDs
Status of the FPGA Firmware of the HF FE
Dependability Requirements of the LBDS and their Design Implications
Status of Interlock BPM
Injectors BLM system: PS Ring installation at EYETS
-9:00: Test IP transverse adjustment (CMS) and optics verification.
ATLAS-AFP interlock validation
Operational Issues L. Ponce.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Collimator Control (SEUs & R2E Outlook)
Remote setting of LHC BLM thresholds?
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Global Post Mortem Event Event Timestamp: 15/06/12 15:54:
LHC dry-runs (BE-BI view)
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Chamonix Workshop XIV CERN - 17th-21st January 2005
1v1.
LHC BLM Software audit June 2008.
Thursday 17/3 Morning: evaluation of the origin of the timing problem occurred over night and the implication on machine protection 09:00 – 12:00 Dry ramp.
What systems request a beam dump? And when do we need them?
Monday 152 bunch operation summary
Presentation transcript:

BCT’s for beam protection L. Søby On behalf of D. Belohrad, L. Jensen and P. Odier 6/12/15Internal workshop ON MPP readiness for MJ beams 1

Outline DCCTs LS1 upgrades and status SBF BCCM (FBCT) LS1 installations and present status First results Summary 6/12/15Internal workshop ON MPP readiness for MJ beams 2

DCCT upgrades and status New CPU and FESA class New ADC: VD80 MTT module driver update by BE-CO 6/12/15 Internal workshop ON MPP readiness for MJ beams 3 Fibers to CCR modified MPS changes on receiving end as well Good collaboration between, CO, MP, and BI to solve all issues.

DCCT upgrades and status System B Beam 2 is twice more noisy than 3 other DCCTs. But still within 1% of one nominal bunch. P. Odier will try to improve during TS1. But only hysteresis can cure the problem of flickering of the SBF. M. Ludwig increased averaging from 1s to e.g.16s from 500GeV, implemented. Only active on system B B2. 6/12/15Internal workshop ON MPP readiness for MJ beams 4 Courtesy A. Apollonio

6/12/15Internal workshop ON MPP readiness for MJ beams 5 DCCT SBF System operational SBF “false” has on some occasions created beam dumps, even though intensity was safe. Status on VISTAR “False” with low intensity, not clear to BI why. To diagnostic SBF errors, logging in Timber (SBF, mode (e.g. forced), intensity.) is a must. This is a request

SBF reliability 6/12/15Internal workshop ON MPP readiness for MJ beams 6 BI writes intensity (22bits with a few verifications) into MTT driver (CO responsibility). From there on responsibility is unclear for me. BUT…Wrong scaling factors (FESA variables) and offset values (sequencer) will give wrong intensity and as consequence a wrong SBF. Currently mitigated by use of redundant system – SBF derived from highest intensity from 2 separate DCCT’s Short term improvement: Scaling factor hard coded in SW, but still need to read and correct offset Long term solution (specifications needed!) DCCT 24 bit system (BI VFC) with FPGA and direct fiber link to MPS. Implemented once the 24 bit system has been qualified (front-end in radiation area) Offset variations to be logged during the year (~5E9). Can they be hard coded to zero in firmware? Completely different hardwareas e.g. beam presence flag?

BCCM 6/12/15Internal workshop ON MPP readiness for MJ beams 7

4 units installed during LS1 Bunch and orbit clock, energy from BST fiber CIBU links commissioned Operational system (A) Development system (B) ICT, Beam1 and BCTW, Beam2 New stable firmware Realistic thresholds set to since 8/ New FESA class, still not 100% operational Data analysis and logging in Timber QT based Python scripts used to evaluate performance 6/12/15Internal workshop ON MPP readiness for MJ beams 8 BCCM status

6/12/15Internal workshop ON MPP readiness for MJ beams 9 Window [T] Noise floor [Bits] Scale [Ch/Bit] Threshold [Bit] Threshold [Ch] WC Threshold [Ch] E E104E E E 102.1E E E 91.1E E E 94.6E E E 92.1E E E 91.5E9 BCCM status Since beginning of Run 2 the 6 loss windows were set very high. Since Monday reduced to more realistic values and can be further decreased.

BCCM performance 1T 6/12/15Internal workshop ON MPP readiness for MJ beams 10 BCTFB1 A Threshold = 4E10 Pilot Noise floor Amplitude Difference ~2.5 E 11

6/12/15Internal workshop ON MPP readiness for MJ beams 11 BCCM performance 1024T Threshold =1.5E9 Triggered on all windows Pilot only triggered on 64,256 and 1024T BCTFB1 A ~2.5 E 11 Only triggered on 64,256 and 1024T. Slow loss?

6/12/15Internal workshop ON MPP readiness for MJ beams T FBCT / BCTI performance Pink = FBCT Brown = BCTI Limits threshold

FBCT / BCTW performance 6/12/15Internal workshop ON MPP readiness for MJ beams 13 Pink = FBCT Brown = BCTW FBCT sensitive to beam movements 1024T

Summary DCCT SBF System B2, 2 times more noisy, P. Odier will try to reduce. SBF: Not clear to BI why it goes unsafe at low intensity. Need diagnostics: SBF, mode, received intensity. SBF SIL level is low: Scaling factors, offsets For new system: specifications are needed. BCCM Thresholds set to reasonable values, can be lowered. System is “stable” and detects beam dumps/losses correctly, TBC. FESA class will be operational after TS1, very important for commissioning. The system will not be “operational” after TS1, but the complete system (FESA + hardware) is in its final configuration. We therefore propose to monitor the system “operationally” but without active interlocks until mid August (return of HW expert). Depending on the results we can then make them active. 6/12/15Internal workshop ON MPP readiness for MJ beams 14