Magnetically Levitated Propeller Bernie Garcia (Me, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachory Louison.

Slides:



Advertisements
Similar presentations
The Why, What and How of Disaster Recovery Plan Testing Presented By: Ed Deveau.
Advertisements

Project Management Concepts
Project Scope Management
IT Strategic Planning Project – Hamilton Campus FY2005.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
Projmgmt-1/35 DePaul University Project Management I - Getting Started Instructor: David A. Lash.
Innovation Leadership Training Day Five Training Recap / Capstone February 20, 2009 All materials © NetCentrics 2008 unless otherwise noted.
Project Management Tools Utilized in Tech Transfers Morning Session #1 Robert Beall, PMP.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Underwater Robotic Fish Week 3 Review Presentation Project #15029 Multidisciplinary Senior Design Rochester Institute of Technology Phase II: Buoyancy.
Charting a course PROCESS.
The BIM Project Execution Planning Procedure
Marcos Esterman, Associate Professor Industrial and Systems Engineering Department Rochester Institute of Technology Multidisciplinary.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
P14006 Bath Tub Lift Phase V Review Amos Baptiste Jeremy Czeczulin Andrew Hughes Richard Prilenski.
Problem Definition Review Reciprocating Friction Tester.
Leadership and Culture SEA Managed Process Continuous Improvement Process Presented May 24, Phone: 1(203)
Multidisciplinary Senior Design Project Charles Alexander, Tom Christen, Kim Maier, Reggie Pierce, Matt Fister, Zach Mink Underwater Thermoelectric Power.
SacProNet An Overview of Project Management Techniques.
Office of Process Simplification May 20, 2009 Planning an Improvement Project.
Cook Stove for Haiti Enhancements System Level Design Review Friday, January 14 th :00 AM – 12:30 PM Project
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
Marcos Esterman, Associate Professor Industrial and Systems Engineering Department Rochester Institute of Technology Multidisciplinary.
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
P16415: Human Powered Centrifuge Amanda Johnson Nathan Corr Pieter Werner Joanna Jayawickrema Laura Pratt.
Sami Lottes Team Leader Electrical Engineer David Sawyer ElliottChief Engineer Mechanical Engineering Coty Winchell Mechanical Engineering Michael Ballow.
Software Life Cycle The software life cycle is the sequence of activities that occur during software development and maintenance.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
P16453 Problem Definition Review Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio.
Quality Criteria : Are you and your team capable of communicating the shared vision to whom it may concern so that it make sense to all relevant stakeholders.
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
P16453 Subsystem Design Loading, Measurement, Control, and Test of a Journal Bearing Test Platform Kris Kidder | John Dolan | Shay Stanistreet | Anthony.
Automated Microfluidic Cell Separator
P16221 – FSAE Shock Dynamometer Problem Definition Review.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Subsystem Design Review Bernie Garcia, Zach Louison, Mike Purcell, Joe Bernardini, Elijah Sensenig.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Team Work Contents: Effective Teams Working as a Team Some Team Tips.
Magnetically Levitated Propeller Bernie Garcia (ME, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachary Louison.
Smart Power Supply Test Bench P16203 ANDRE PELLETREAU, KERRY OLIVIERA, JEREMY WILLMAN, RADOSLAW MASLANKA, VINCENT STOWBUNENKO.
Preliminary Detailed Design Review Group P16228: Mike, Zach, Joe, Elijah & Bernie.
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
Automated Microfluidic Cell Separator Project Group:
Electrophotographic Cascade Development Apparatus Zachary FoggettiBridget Kearney Dalton MeadRuishi Shen Michael WarrenThomas Wossner.
Detailed Design Review Group P16228: Mike, Zach, Joe, Elijah & Bernie.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
List 3 – 5 guiding principles that will serve as foundation and guide rails for the project. See slide 4 for further details ObjectivesGuiding PrinciplesKey.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Change Management A process for process change by Cory R. Peters Exelon PowerLabs.
Developing a Monitoring & Evaluation Plan MEASURE Evaluation.
Subsystem Build & Test Review
P16512 – 3D Printing Ink Development Test Rig
Turbomachinery Flow Visualization P08453
CASE Tools and Joint and Rapid Application Development
LEAN ORGANIZATION SUMMARY
Multidisciplinary Senior Design I: Problem Definition Review
Chapter 3: The Project Management Process Groups: A Case Study
Right Move, Right Place, Right Time
P14551: Multi-Process 3-D Printer
P15073: Autonomous IV Stand Michael Binger, Caitlin Conway, Nick Goddard, Nicholas Jacobs, Christina Pysher, & Ethan Whritenor Mike September 11, 2014.
P07107: Mission Control Procedures Aerospace Systems and Technology
TRANSPORTATION SYSTEM DESIGN CHALLENGE
P07122: Autonomous Quadcopter
Employee engagement Delivery guide
P16228 Magnetically Levitated Propeller
Team P16228: Magnetically Levitated Propeller
P15661 Reciprocating Friction Tester Base Subsystem Problem Definition Review Matt.
Presentation transcript:

Magnetically Levitated Propeller Bernie Garcia (Me, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachory Louison (ME, Facilitator), Mike Purcell (EE, Site admin)

Overview The idea behind the magnetically levitated propeller is to us magnets to stabilize and control the propeller, eliminating the need for conventional bearings and seals that eventually wear out and leak. The goals of this project are to design and create a working prototype mag lev propeller where there is no contact between the moving and stationary parts. Existing magnetic bearings may be used, or an entirely new design may be created. The end result is expected to be real-world adaptable in order for Boeing and other stakeholders to utilize in submersible ROVs.

Team Vision Summarize: Our team had several goals planned for this phase. We wanted to meet with our customer and conduct an interview ensuring that the customer’s goals were communicated clearly with the team and that any confusion was sorted out. We also wanted to create a problem definition that could be agreed upon. Our third goal was to create a practical user scenario that our project might end up being part of. Our last goal, was to allow time for team bonding, which would create the best environment to complete the project in. During this phase we accomplished or began to accomplish each of the goals listed above. We met with our customer twice, going over a list of questions ensuring that there was no confusion and that our ultimate project goal was clear. Our problem definition has been create and agreed upon. The third goal of completing a practical user scenario can be seen in the flow chart below. Lastly, as a team we have started to bond through our meetings, classes and work time spent together.

Project Summary A magnetically levitated propeller is a single axis propeller lifted through a magnetic bearing system. The purpose of this device is to remove the need for any physical contact between the rotating and stationary pieces of the propeller system. This is incorporated into a machine to prevent wear and tear of the propeller. It should remove the need for shafts, seals, and allow the propeller to be used in a submersible machine. Currently the levitated propeller design has been used on ROVs to go for deep sea diving and retrieves items in the water, and the overall design has been used since the 1980s. Also trains have used similar technology called Maglev, which integrates the magnetic bearings and currently two maglev trains are operated with the newest opening to the public in 2005.This project includes the goals of creating either a fully levitated propeller or just partially levitated. It can either be completed by creating an entirely new design of a magnetic bearing system or altering one that was previously made. Other deliverables included for the project are all documents, measurements of performance, thrust (rpm & velocity), weight, power consumption, velocity, non-dimensional analysis of results, and participating at Imagine RIT. This design should make the propeller more efficient, have a longer life, prevent wear and leakage, and only has one point of contact. The desired result is to preferably create a fully magnetically levitated system that can be used for submersible ROVs for Boeing. Overall it should follow limitations of the intellectual property and allow Boeing to gain an advantage in the ROV market. For more information take a look at the Project charter.

Use Cases (1)

Project Goals and Key Deliverables

Stakeholders Below is a list of potential stakeholders for this project; they can all be affected by the outcome of this project.Boeing (sponsor) Dr. Day (Customer) RIT MSD Group Military ROV Manufacturers Safety Agency

Costumer Requirements (Needs)

Engineering Requirements (Metrics and Specs)

House of Quality

Constraints

Benchmarking

Plan for next phase

Questions?