Projects and topology Ádám Balogh Adviser How does your data submission translate into a Project in the topology TYNDP 2017 SJWS Energy Community.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
CMEF Requirements for the Monitoring tables as part of the Annual Report RD committee 24/10/2007.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session January 24, 2006.
Ex-ante conditionality – General guidance Workshop on strategic programming, monitoring and evaluation Ilse De Mecheleer, DG EMPL Madrid, 22 February 2013.
Upcoming TIEDI ® OMB Changes Q&A Session Implementation date: March 31, 2015.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Concept of Data Collection Vincent Scherrer Junior Adviser, System Development ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Centurio Partner Regions' Meeting 5 May AER CENTURIO CONFERENCE Centurio Partner Regions’ Meeting 5 May 2005 Azores.
MT+ GUIDE FOR BENEFICIARIES. 1. GENERAL INTRODUCTION.
Infrastructure projects Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 April 2012.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Supplier Invoicing North America
Electronic EDI e-EDI. The EDI has been in use since 1999 using a paper-based system and computerized spreadsheets to collect and manage EDI data. Over.
Cost-Benefit Analysis Modelling: indicators & Monetization TYNDP/CBA SJWS 6 – 13 May 2014.
CBA Results Files Analysing the results. 2 We highly encourage you to >Read the CBA Methodology:  Annex F on Methodology of TYNDP 2015
Market Integration & SoS Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 March 2012.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
|Date faculty of law groningen centre of energy law 1 Security of Supply – EU Perspective and Legal Framework First EU-Russia Energy Law Conference,30.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Community Services Programme Strand 1 & 3 Business Planning Re-contracting April 2014.
Validating your data Webpage:
15-17th September 2005 Common Voice Workshop, Budapest 1 Common Problems 1. Implementation and enforcement of governance principles 2. Coordination between.
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
TYNDP SJWS #1 Infrastructure Projects -- Supply & Demand TYNDP st SJWS 24 January 2012 ENTSOG offices -- Brussels.
NERC Data Collection & Coordination. Rules of Procedure: Section 1600 Overview  NERC’s authority to issue a mandatory data request in the U.S. is contained.
TYNDP SJWS #2 Security of Supply – Market Integration TYNDP – 2 nd SJWS 15 February 2012 ENTSOG offices -- Brussels.
Discipline, Crime, and Violence August New DCV Application The DCV application and submission process has been revised beginning with the
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
1 Interoperability of Spatial Data Sets and Services Data quality and Metadata: what is needed, what is feasible, next steps Interoperability of Spatial.
Module 5: Data Collection. This training session contains information regarding: Audit Cycle Begins Audit Cycle Begins Questionnaire Administration Questionnaire.
FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Cost-Benefit Analysis Economic Performance Indicators TYNDP/CBA SJWS 6 – 13 May 2014.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
Transparency Platform Project introduction Panagiotis Panousos Business Area Manager, System Operation ENTSOG’s Transparency Workshop Brussels – 11 September.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
State of Georgia Release Management Training
September 12-14, 2006OECD-Eurostat Expert Meeting1 OECD-Eurostat Expert Meeting on Trade in Services Statistics Foreign Affiliates Statistics in Eurostat.
Basic Navigation in Oracle R12 BY: Muhammad Irfan.
Responding to Invitation to Tenders Michael Fowler Category Manager – Procurement Brian Davies Senior Procurement Officer.
Provider Information Request (PIR) Staff Data Collection.
STREAMLINING CLIMATE CHANGE AND AIR POLLUTION REPORTING REQUIREMENTS TFEIP – Dublin 23 – 24 October2007.
How the PCIs are developed Céline Heidrecheid System Development Business Area Manager TYNDP perspective on project progress Copenhagen – 24 June 2016.
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
40th IG meeting 29th November 2016
The revised Periodic Reporting Questionnaires: general features Alessandra Borchi Policy and Statutory Meetings Section UNESCO World Heritage Centre.
Nominations.
Online Training Course
WIGOS Pre-operational Phase
Ex-ante conditionality – General guidance
Gibraltar Financial Services Commission
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
Provided by the Hartnell College Outcomes and Assessment Committee
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
40th IG meeting 29th November 2016
Provided by the Hartnell College Outcomes and Assessment Committee
Costas VOYIATZIS DG EMPL - Evaluation and Impact Assessment Unit
The establishment of the 2nd list of Projects of common interest
Using AIM (for Instructors)
Presentation transcript:

Projects and topology Ádám Balogh Adviser How does your data submission translate into a Project in the topology TYNDP 2017 SJWS Energy Community - Vienna 09 February 2016

2 1.Recap on the previous SJWS 2.How does Data Submission translate into a Project 3.Validation Rules and Monitoring Activities 4.Data Portal Project General Information 5.Data Portal Interface live presentation 1.Basic functionality – Create/Modify/Cancel/Submit Project, Submit Increment for existing/new Point 6.Point and Operator creation forms 7.Self-assessment of investment needs Content

3 Recap on the previous SJWS – The Data Collection schedule >Projects can be submitted within the Project Submission timeframe >During Data Consistency Check timeframe, only capacity modifications can be made for non- matching capacities Refresh on the SJWS #1 Coordination of Promoters shall start well before the Data Collection. Fully non-coordinated Projects will not be modelled – Lesser of Rule

4 There is an already existing network topology; available information:  Which Point  What capacities  Which operators How does data submission translate into a Project modelling A B Point Y

Missmatch 5 And a Project is submitted between countries B and C... >The minimum information to enable the assessment of the Project are seen below:  Point Name (if necessary create new point); Capacities; Commissioning Date; FID Status; Maturity How does data submission translate into a Project AC B Point X between country B and C Submission 1 Promoter B From 2021 Submission 2 Promoter C From from from 2023

6 Principles in the system >Online web-portal with user authentication – note the credentials update process >For projects already submitted to ENTSOG, questionnaires will already include latest version of project data (nevertheless Promoter will have to resubmit the Project) >Portal is permanently online and information can be updated at any time, however a deadline system is defined for inclusion in specific publications >Promoters can fill in their questionnaires in multiple sessions, with the portal saving the unfinished version as a draft >Segregation of the data : project promoters only have access to their data and eventually data that concern their network (adjacent capacity increments) >Excel is not used as a data entry mechanism as it is difficult to enforce strict data quality mechanisms >It is now easily possible to export the project information in Excel Data Portal general information

7 A rule applied on the submitted data (Project data or Incremental capacity data) – Examples: > Commissioning date should be in the future but within the TYNDP time horizon >The value of an increment shall be X>0 GWh/d >A Project with FID in the past cannot be Non-FID >Already submitted Projects have to be updated for a new TYNDP >Point and flow direction have to be submitted (active) for an Increment >Etc... Possible outcomes: >N/A – in the given context, on the given data >Warning (Minor) – the Rule is violated, but it does not deeply impact modelling >Critical Error (Major) – the Rule is violated, and that submitted data is not usable for modelling >Passed – The Rule is observed Validation Rules Rules can be read in the Validation Rules Document from 15 March

8 ENTSOG undertakes to monitor certain common data submission errors Examples of Monitoring Activities >Deal with Point creation requests >Deal with Operator creation requests >Projects which are not submitted and are only in ”Draft” submission status >Existing capacity must already be there, if increment submitted on an existing Point >Project with PCI status should submit minimum set of modelling data (individual exeptions can apply) >Projects with PCI status should not have critical mismatches >Rules can be read in the Monitoring Activities Document from 15 March >Some of the above might still be migrated to Validation Rule Monitoring Activities Please ensure to desingate reacheable contact person to engage with ENTSOG if contacted

9 Live presentation of the Data Portal for Data Submission >Project Creation, Modification, Submission, Increment Submission, etc. Data Portal Interface for submission

10 >Promoter request form – to receive credentials to access the Data Portal Presentation of Forms

11 >The Point creation form – to create new Points Presentation of Forms

12 >Operator creation form – to create new Operators Presentation of Forms

13 In line with the intetions of the COM to identify the investment gaps in the Regional Groups as a first step of the next PCI selection procedure, ENTSOG plans to: >Include in the Project Questionnaire a section where the Promoter can self-assess the Project, by describing which investment need(s) -as indentified within the TYNDP does the Project fulfil Self-assessment of investment needs

Thank You for Your Attention ENTSOG -- European Network of Transmission System Operators for Gas Avenue de Cortenbergh 100, B-1000 Brussels EML: WWW: Ádám Balogh Adviser, System Development