Outline Definitions Post-Closure Objectives Issues Post-closure Activities Minimizing Risk Financial Planning
Post-Closure Care Objective Monitoring & maintenance a landfill and all its components until it is biologically stable 2/19/2016Lesson 11 3
Post-Closure Period Longest conventional landfills Shorter Bio-reactor landfills Minimal 25 to 30 years Possible indefinite 2/19/2016Lesson 11 4
Issues Settlement Cover erosion and failure Groundwater contamination Landfill gas emission & migration Leachate outbreaks Vegetation growth 2/19/2016Lesson 11 5
Environmental Risks 2/19/2016Lesson 11 6
Settlement Breach of Final Cover Disrupts final use activities Potential for infiltration 2/19/2016Lesson 11 7
2/19/2016Lesson 11 8 Cover Failures Desiccation Shear settling Rotation settling Erosion Slope failure
Landfill Gas 2/19/2016Lesson 11 9
Leachate Outbreaks 2/19/2016Lesson 11 10
Plan For Closure in Design 2/19/2016Lesson Active landfill operationConceptual end-use plan
Design to Reduce Risk 2/19/2016Lesson 11 12
Conventional Design 2/19/2016Lesson 11 13
Bioreactor Design 2/19/2016Lesson 11 14
2/19/2016Lesson Post-Closure Activities Final cover maintenance Environmental monitoring Operate leachate management systems Operate gas management systems Undertake remedial activities Record Keeping
2/19/2016Lesson Inspection & Monitoring Plan Final Cover Inspections Spring and Fall Drainage Systems After intense rainfalls Groundwater 2 x per year Landfill Gas Detection gov’d
Vegetation Maintenance Irrigation Weed control Grass cutting Replant damaged areas 2/19/2016Lesson 11 17
Monitoring & Remediation 2/19/2016Lesson 11 18
2/19/2016Lesson Corrective Action Groundwater Drainage systems Leachate seepages Corrective response confirm investigate evaluate implement
Financial Planning GAAP – “Unfunded liabilities” Estimate Closure Costs Estimate Post-Closure Cost – 25 to 30 yr. Invest in Reserves – finance from operating revenues Private companies – assurance financing 2/19/2016Lesson 11 20
In Summary Plan early Design to reduce liability Be prepared Financial Security Funding 2/19/2016Lesson 11 21