Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Slides:



Advertisements
Similar presentations
Municipal Solid Waste Defined in 40 CFR Part 258.2
Advertisements

© Hyder Consulting Pty Ltd Local Government Waste Summit 2006 Total Cost Approach for Waste Management Christine Wardle 10 February 2006.
Application of ANI Guideline William Wendland, P.E. American Nuclear Insurers Glastonbury, Connecticut USA Philadelphia, PA June 2007 “ RETS – REMP.
NC SWANA FALL 2014 MEETING Presented by Ed Mussler P.E., Wilmington, NC October 2014 DWM Post-Closure Landfill Use Concepts and Considerations.
GASB 49 –Accounting & Financial Reporting for Pollution Remediation Obligations An Overview.
Josephine County / City of Grants Pass Solid Waste Agency
Long-term Management of Land Use Controls Mare Island RAB Meeting February 23, 2006.
Josephine County Solid Waste Agency Master Recycler Program March 1, 2010.
Promoting Renewable Energy Development on Closed MA Landfills Sarah Weinstein, Massachusetts Department of Environmental Protection, AEHS Foundation, UMass.
Environment Engineering I
The Process of Siting and Approving a New Landfill in Ontario
Complementing WTE A Proposal to Implement Recycling and Remediate the GT Landfill Complementing WTE A Proposal to Implement Recycling and Remediate the.
Sovereign Waters Lake Management Plan Outcomes and Recommendations 9 May 2013.
REGULATORY ACCEPTANCE OF POST-CLOSURE CARE INNOVATION Mr. Charles G. Johnson Colorado Department of Public Health and Environment Hazardous Material and.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Mass Wasting & Subsidence
6:00 ­- 6:30 p.m.Poster board display 6:30 - 6:40 p.m.Open Meeting/Introductions Ellie Donovan, MassDEP, Facilitator 6:40 - 6:45 p.m.Opening Remarks Michelle.
LEA Conference, Autumn 2007 Joseph Mello, Land Disposal Program Manager 1 WATER BOARD FINANCIAL ASSURANCE FOR KRFR.
Cash and Financial Investments. McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc., All Rights Reserved Internal Control Over --Cash Receipts.
Public Private Partnership- Identification, Viability and Implementation Prof. Yashvir Tyagi Prof. Yashvir Tyagi Department of Economics Department of.
Challenges to the Development and Commercialization of CCS Cheyenne A. Alabanzas 2009 ASME Intern University of Alaska – Anchorage.
Solutions for Declining Municipal Revenue in the City of Royal Oak Quick Policy Analysis By: John Girdwood Wayne State University For: Royal Oak City Council.
Proprietary Fund Operations For activities similar to profit-seeking businesses Provides goods and services on a fee or user charge basis Should be self-supporting.
AB 2296 Adopt Regulations by January 1, 2008 that:Adopt Regulations by January 1, 2008 that: –provide for an increase in the closure and PCM cost estimates.
The Plan KNOW WHERE YOU ARE HEADED mission statement identifies the nature of the business and the reason it exists All tactics and strategies should be.
EnE 301: ENVIRONMENTAL ENGINEERING
Training in Oil & Gas Production for BP Technical Interns Section 8 – General lease tasks A production technician has a number of general duties associated.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
Construction & Renovation of Amenity Turf. Planning Be Organized 1.Closure 2.Work with growing seasons 3.Organize materials 4.Notify relevant parties.
Natives of Kodiak, Inc. September 20,2014 Beth Stuart kpmg.com.
1 EU-Twinning Project RO2006/IB/EN-09 “ Implementation and Enforcement of the Environmental Acquis National Environmental Protection Agency– Phase II”
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
Landfill Decomposition Time (yrs) Anaerobic Bioreactor Landfill Dry Tomb Landfill (dry site) Containment Failure Gas/Leachate Generation.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Abcd General Insurance Spring Seminar May 2003 Scarman House.
October Mary Louise Hendrickson Solid Waste Section – Technical Lead
California Integrated Waste Management Board November 10, 2008 Item #2 Discussion And Request For Direction Regarding The Board's Fulfillment Of The Requirements.
Cal/EPA Building Room 550 Financial Assurances Phase II Informal Rulemaking Group Meeting May 12, :00 am to 12:00 pm Financial Assurances Phase II.
Landfill Closure Issues. Stormwater Retention  Florida Regulations - –must collect and detain runoff from first 1” of rainfall (for > 100 acres, 0.5”
California Integrated Waste Management Board August 19, 2008 Item 6 Discussion And Request For Rulemaking Direction To Formally Notice The 45-Day Comment.
California Integrated Waste Management Board Board Meeting June 16, 2009 Item #8 Consideration Of Adoption Of The Recommendations To The Legislature In.
California Integrated Waste Management Board Update On Long-Term Postclosure Maintenance And Corrective Action Financial Assurances Activities Permitting.
New activities Tour de Table – Lithuania Kestutis Kadunas, Geological Survey of Lithuania.
European Waste Management Presentation of Waste Disposal Company Halle Lochau (AWH) EWM Working Group Meeting Dundee, 3rd and 4th February 2005.
Chapter Seventeen Accounting for State and Local Governments, Part II McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights.
Update On Landfill Long-Term Financial Assurances Activities For Postclosure Maintenance And Corrective Action.
Landfill Closure SWANA November 2015.
Ministry of Science and Technology Taiwan, R.O.C Southeast Asia International Joint-Research and Training Program 『 To Promote Sustainable Protection.
May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed.
December 6, 2004CIWMB P&E Committee Workshop1 Postclosure Maintenance Postclosure Maintenance Beyond the Initial 30 Years and Financial Assurance Demonstrations.
Cal/EPA Building Room 550 Postclosure Maintenance Workshop March 10, :00 am to 12:00 pm Postclosure Maintenance Workshop March 10, :00 am to.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Critical Components July 26, 2012 John Carrigan MassDEP Northeast Regional Office.
Brick Township Landfill Superfund Site REUSED - Solar Panel Field Jon Gorin – EPA Region 2.
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
The Woodlawn Landfill Site A Case Study in the Values and Methods of Ecological Revitalization.
New Life for Landfills One Man’s Trash Another Man’s Treasure.
WATERSHEDS AND POLLUTION. What is a Watershed? A watershed is simply: an area of land where runoff collects and then is a water supply to a large lake.
Low-Level Radioactive Waste Forum Spring 2016 Meeting – Park City, UT
Long-Term Care After 30-Year Post-Closure Period
Low-Level Radioactive Waste Forum
Presentation Outline Background Summary of City Actions
Scientific or Engineered Landfilling of Waste
River Basin Management Flood protection
Erosion Virtual Lab Predictions (right side)
Solid and Hazardous Waste Chapter 21
Closure and Post-Closure
the path less traveled Termination of Post Closure Care
Presentation transcript:

Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1

Outline  Definitions  Post-Closure Objectives  Issues  Post-closure Activities  Minimizing Risk  Financial Planning

Post-Closure Care Objective  Monitoring & maintenance a landfill and all its components until it is biologically stable 2/19/2016Lesson 11 3

Post-Closure Period  Longest  conventional landfills  Shorter  Bio-reactor landfills  Minimal  25 to 30 years  Possible  indefinite 2/19/2016Lesson 11 4

Issues  Settlement  Cover erosion and failure  Groundwater contamination  Landfill gas emission & migration  Leachate outbreaks  Vegetation growth 2/19/2016Lesson 11 5

Environmental Risks 2/19/2016Lesson 11 6

Settlement  Breach of Final Cover  Disrupts final use activities  Potential for infiltration 2/19/2016Lesson 11 7

2/19/2016Lesson 11 8 Cover Failures Desiccation Shear settling Rotation settling Erosion Slope failure

Landfill Gas 2/19/2016Lesson 11 9

Leachate Outbreaks 2/19/2016Lesson 11 10

Plan For Closure in Design 2/19/2016Lesson Active landfill operationConceptual end-use plan

Design to Reduce Risk 2/19/2016Lesson 11 12

Conventional Design 2/19/2016Lesson 11 13

Bioreactor Design 2/19/2016Lesson 11 14

2/19/2016Lesson Post-Closure Activities  Final cover maintenance  Environmental monitoring  Operate leachate management systems  Operate gas management systems  Undertake remedial activities  Record Keeping

2/19/2016Lesson Inspection & Monitoring Plan  Final Cover Inspections  Spring and Fall  Drainage Systems  After intense rainfalls  Groundwater  2 x per year  Landfill Gas  Detection gov’d

Vegetation Maintenance  Irrigation  Weed control  Grass cutting  Replant damaged areas 2/19/2016Lesson 11 17

Monitoring & Remediation 2/19/2016Lesson 11 18

2/19/2016Lesson Corrective Action  Groundwater  Drainage systems  Leachate seepages  Corrective response  confirm  investigate  evaluate  implement

Financial Planning  GAAP – “Unfunded liabilities”  Estimate Closure Costs  Estimate Post-Closure Cost – 25 to 30 yr.  Invest in Reserves – finance from operating revenues  Private companies – assurance financing 2/19/2016Lesson 11 20

In Summary  Plan early  Design to reduce liability  Be prepared  Financial Security Funding 2/19/2016Lesson 11 21