AFP-HPS 240 15/03/2011 1 D. D. INFN To/CERN PH UCM HPS240. Integration of Moving Beam Pipe and detector box. 1. Re-collection Layout of moving beam pipe.

Slides:



Advertisements
Similar presentations
Thierry RENAGLIA / Ramon FOLCH FP420 Manchester Workshop December 2006 FP420 Connection Cryostat Mechanical Design & Construction Key capabilities of CERN.
Advertisements

CALICE - European DHCAL meeting Ciemat Mechanical Workshop and test of the Stainless steel plate machining for the CALICE-HCAL. Enrique Calvo Alamillo.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
1 MicroPot Prototype Work in Progress Jaak Lippmaa Helsinki Group, Helsinki Institute of Physics, University of Helsinki CERN, February, 2006.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
FP420 R&D Project – Brainstorming session on mechanics 28 March 06 1 D. D. INFN To/CERN PH CMM FP420 Integration Environment.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
The integration of 420 m detectors into the LHC
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
Movable beam pipe and NNC Study & prototype development Manchester 14/12/20091D. FP meeting.
SPS High Energy LSS5 Thermal contact & cooling aspects
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
LCWS11 WG4 Fully featured accelerating structure engineering design
Crab Cavity Technical Coordination meeting:
DT-LHCb coordination meeting 18 April 2016
SPL RF coupler: integration aspects
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Jaak Lippmaa HIP, Helsinki University
HPS: R&D issues Krzysztof Piotrzkowski (UCLouvain/CERN)
Ti/SS transitions A.Basti INFN-PISA*
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
HFM Test Station Main Cryostat
LARP Phase II Secondary Collimator RC1
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Wideband kickers Mechanical design and Fabrication
Challenges of vacuum chambers with adjustable gap for SC undulators
Preliminary Y-chamber specifications – First draft
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Dump Core Studied Design Solutions
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
The 11T cryo-assembly: summary of design and integration aspects
Challenges for FCC-ee MDI mechanical design
XFEL Collimation and Beam Switchyard Vacuum Issues
Phase II Collimators : design status
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
BGC Collaboration Meeting –
Simplified Procedure Draft
Presentation transcript:

AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS240. Integration of Moving Beam Pipe and detector box. 1. Re-collection Layout of moving beam pipe on New connection Cryostat 2. Beam Vacuum requirements 3. FP420 Beam Pipe design 4. New single window Beam pipe for HPS 5. Beam Position monitor integration on BP 6. Si tracker package 7. Detector box 8. Bellows 9. Motorization 10. HPS Prototype Work Package Torino ( Mechanics)

AFP-HPS /03/ D. D. INFN To/CERN PH UCM Layout

AFP-HPS /03/ D. D. INFN To/CERN PH UCM

AFP-HPS /03/ D. D. INFN To/CERN PH UCM

AFP-HPS /03/ D. D. INFN To/CERN PH UCM FP420 Moveable Beam Pipe Integration in New connection Cryostat

AFP-HPS /03/ D. D. INFN To/CERN PH UCM FP420 Moveable Beam Pipe on support table.

AFP-HPS /03/ D. D. INFN To/CERN PH UCM BEAM VACUUM REQUIREMENTS High conductivity copper internal coating, tapered angle< 15. Need close collaboration with CERN RF and AT/VAC experts Mandatory discussion on material and design from very early stage of conception.

AFP-HPS /03/ D. D. INFN To/CERN PH UCM

AFP-HPS /03/ D. D. INFN To/CERN PH UCM Coutesy of UC Louvain F.Benoit, K.Piotrzkowski Latest Prototype realized. Two pockets are now laser welded. FP 420 Beam Pipe (UC Louvain)

AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS 240 Beam Pipe. Torino Proposal Single thin window. Length 450mm. Machined by Wire Electro erosion from SS 316 LN solid bar. Present design of thin windows similar (20x20mm) to FP420 BP. Details to be discussed with CERN groups. Beam Position Monitor integrated by laser welding. STATUS: Material from CERN Store (following AT/VAC specification) already delivered in Torino mech. Workshop. Update design of thin windows, Flanges and BPM interface. FE Analysis. Validation. WEDM Machine available from mid April.

AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS Beam pipe design –DRAFT-- 1

AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS Beam pipe design –DRAFT-- 2

AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS Beam pipe design –DRAFT-- 2 det.

AFP-HPS /03/ D. D. INFN To/CERN PH UCM Courtesy Ray Thompson and Manchester Group. Si detector package. Layout for FP420. Manchester group. TO DO: Silicon board design to be defined. Design. To be adapted to HPS240. Cooling still to be defined and integrated

AFP-HPS /03/ D. D. INFN To/CERN PH UCM Silicon 3d mounting proposal (FP420) Conical seat Flat seat V groove seat Synthetics ruby balls Carbon bearing system Carbon blades support on cap and synthetics ruby balls fixed on detector frame. Components act as reference system and thermal insulator. Cooling feedthroughs Electrical feedthroughs

AFP-HPS /03/ D. D. INFN To/CERN PH UCM Detector Box V2---DRAFT-- This New Detector Box host Quartic or Gastof and Silicon Tracker. Internal dimensions are: 230 x 510 x 125 (mm) The enclosed volume is vacuum tight (secondary vacuum). Definition of detector dimension, required services and feed trough is to be defined.

AFP-HPS /03/ D. D. INFN To/CERN PH UCM BELLOWS

AFP-HPS /03/ D. D. INFN To/CERN PH UCM Specification: Stainless steel AISI 316L or AISI 316Ti. Vacuum tight. Bake out to 250 C Lateral offset +/- 31mm Quantity 16 pcs. Life cycle expectancy >> cycles Bellows with intermediate tube allows extensive lateral movements minimizing stress. In this studio diameter is over dimensioned, D=107,4mm, to allows integration of RF screen. In case RF screen result not necessary, internal diameter can be reduced to 96mm; 93mm; or 85mm. Bellows Studio. Witzenmann Standard corrugated tube. (CERN Supplier) RF screen to shield the bellows from the beam? Develop design in close collaboration with AT/VAC. Validate and finalize design and manufacture to realize a prototype for tests. INFN To

AFP-HPS /03/ D. D. INFN To/CERN PH UCM Motor and controls hardware (lvdt, stops) are assumed to be the same of collimators. Nevertheless some aspect are not yet clear. Auto retraction in garage position in case of hardware or control failure may require feature not compatible with the present layout. A preliminary risk analysis is necessary to assess the validity of adopted solution. Motorization and controls.

AFP-HPS /03/ D. D. INFN To/CERN PH UCM Beam Position Monitor on Moveable Beam Pipe. The Beam Position Monitor on the Moveable Beam Pipe Station is now integrated on the Beam Pipe. In the figure a body of BPM used in LHC beam instrumentation is adapted. This body has been suggested as the most likely adaptable to our scope (FP420). Finalization of Beam Pipe design require also definition of this component. We need to re-establish contact in BE/AT group.

AFP-HPS /03/ D. D. INFN To/CERN PH UCM INFN Torino Prototype WP’s Collaboration.. INFN Torino group is involved from the very preliminary (2005) R&D studies of feasibility on FP420. We can offer collaboration on integration, engineering, design, manufacture, dimensional controls, assembly and installation of moving beam pipe and Si detector package. In particular concerning the realization of a complete prototype for HPS 240, we can take care to design and manufacture a new beam pipe with detector box, body of Beam position monitor, interfaces for motorization and supporting table.

AFP-HPS /03/ D. D. INFN To/CERN PH UCM Integration of various components still need effort to be effectively defined. Close collaboration with CERN group is mandatory and necessary to finalize the design. Collaboration with AFP would be very useful In Torino we can start production of aprototype beam pipe from April. Still many detail need to be agreed and finalized. Thanks. Conclusion.

AFP-HPS /03/ D. D. INFN To/CERN PH UCM Wire electrical discharge machining (WEDM) Some of the advantages of EDM : Complex and high precision shapes that would otherwise be difficult to produce with conventional cutting tools Wire-cutting EDM is commonly used when low residual stresses are desired. There is no direct contact between tool and work piece. Therefore delicate sections and weak materials can be machined without any distortion. A good surface finish can be obtained. This WEDM will be delivered in Torino Mech. Workshop by end of March. Max. Workpiece dimension: 1050 x 500 x 600 (mm)

AFP-HPS /03/ D. D. INFN To/CERN PH UCM Coordinate Measuring Machine (CMM) Poli Galaxy Maxi CMM Material: Granite Construction Capacity (mm) : X 2300; Y 1200 ; Z Accuracy: mm Software: DEA PC-DMIS ® Mitutoyo CRT Apex C574 Material: Granite Construction Capacity (mm) : X 505; Y 705 ; Z 405. Accuracy: mm Software: DEA PC-DMIS ® ZEISS Accura II (INFN PD) Material: Granite Construction Capacity (mm) : X 1200; Y 900 ; Z 700. Accuracy: mm Software: Calypso Equipped with Active Extension Stylus