WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January 20 - 22, 2015 1.

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Questions about AVR & PSS
WECC Standards Committee Joint Session
WECC Standards Committee Join Session Webinar Meeting September 5, 2013.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
NERC Footnote b / 12 – Load Loss
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Marv Landauer Report to TSS on RS Activities April 25-27, 2012 Salt Lake City.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Presented to PGDTF February 11, 2015
Steve Rueckert Director of Standards Standards Update June 5, 2014 Joint Guidance Committee Meeting Salt Lake City, UT.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Goshen Area Bus Reconfiguration
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
ERCOT PUBLIC 10/21/ RTP Scope and Process Review October 21, 2014.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
SPS Mis-operation – DRAFT Proposal for ERCOT procedures.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Project WECC-0100 Update Reliability Subcommittee February 2014.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
April 23 rd OWG UFLS Survey & Power Factor Review.
Victoria L. Ravenscroft Senior Policy Analyst Reliability Planning and Performance Analysis Information Sharing Policy Update March 25-26, 2014 Standing.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Standards Subject to Enforcement Currently Or Standards Subject to Future Enforcement TSS Meeting #169 May 6-8, 2015 By: Lesley Kayser-Sprouse.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT.
© Property of ERCOT /06/20041 Overview of SPS in ERCOT February 5, 2004.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Project Cyber Security Order 706 Version 5 CIP Standards Potential to Adversely Impact ERCOT Black Start Capability.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
1 Planning the CREZ 345 kV System for Multi-contingencies CREZ Technical Conference January 26, 2010 Bernie Pasternack AEP Service Corporation.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
ROSE Updates Marianna Vaiman, V&R Energy WECC JSIS Meeting Salt Lake City, UT September 9 – 10, 2014 Copyright © V&R Energy.
1 Progress Report Policies and Procedures Tom Green PCC Salt Lake City July 15, 2014.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Bert Peters Chair, Path Operator Task Force
WECC – NERC Standards Update
WECC Regional Standards Update
Path Operator Implementation Task Force
Updates to the Path Rating Process for Approval by the PCC
Western Electricity Coordinating Council
Merrill Brimhall – Engineer, Staff
Project WECC-0100 Update Load Modeling Task Force
Project WECC-0100 Update Reliability Subcommittee
Steve Rueckert – Director of Standards
TPL Voltage Guideline Presented to TSS Baj Agrawal Arizona Public Service Co. 8/21/2017.
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
Palo Verde-COI RAS Retirement
Standards Development Process
Bert Peters Chair, Path Operator Task Force
Presentation transcript:

WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,

A little history… WECC-0100 DT was formed (~ August 2013) to address the substance of WR3 Requirement of the previous version of TPL-001-WECC-CRT-2.1 (TPL) and Requirements R5 & R6 imposed by NERC TPL Requirements WR1,WR2,WR4 & WR5 were approved for retirement by ballot on October, Table W-1 will not migrate to this document, but its intent will be capture by the combined language of WR1,WR2 and WR3 (new criterion document). There has been some shuffling as to whether this should be a RBS, CRT or even a regional Standard – When the dust settled, Criteria took the title. The final product of the DT is the new WECC Criterion – TPL-001-WECC-CRT-3 document 2

TPL-001-WECC-CRT-2.1- WR1,2,4,5 (ret.) 3 WR1 = compliance w/ WECC’s disturbance/performance table W-1 + common mode of 2 adjacent ckts on separate towers if MTBF < 30 years  Category C + common mode of 2 generator units connected to the same switchyard  not cascade + loss of multiple bus sections due to failure or delayed clearing of bus tie or sectionalizing breaker  Category D + potential to adjust contingency category level after Board approval. WR4 = Performance for unsuccessful reclosing same as no reclosing WR5 = Category D contingencies must not result in cascading unless MTBF > 300 years. + any contingency that has resulted in cascading, must be mitigated to prevent cascading in the future or demonstrate MTBF > 300 years. WR2 = Option to apply different performance requirements than those in table W-1 for internal impacts: If less stringent other systems are permitted same performance in that part of the system If more stringent, these requirement may not be applied to other systems.

WECC Table W-1 4

TPL-001-WECC-CRT-2.1-WR3 to be addressed by new criterion document 5

TPL-001-4, R5 & R6 to be addressed by new criterion document 6

TPL-001-WECC-CRT-3 (WR1) 7

TPL-001-WECC-CRT-3 (WR1 cont.) 8

TPL-001-WECC-CRT-3 (WR1.3) 9

TPL-001-WECC-CRT-3 (WR1.4) 10

TPL-001-WECC-CRT-3 (WR1.4) 11

TPL-001-WECC-CRT-3 (WR2) 12

WECC-0100: WR3 WR3 states that "Each Transmission Planner and Planning Coordinator that uses a less stringent criterion than that stated in Requirement WR1 shall allow other Transmission Planners and Planner Coordinators to have the same impact on that part of the system for the same category of planning events (e.g., P1, P2).” Similar to prior criterion requirement. If you use a less stringent criteria or have developed an exception for certain part of your system, then you have to allow other transmission planners or planning coordinators to use the same less stringent criteria or exception for that part of the transmission system.

WECC-0100: WR4 WR4. Each Transmission Planner and Planning Coordinator shall use the following threshold criteria to identify the potential for Cascading or uncontrolled islanding. An entity is allowed to use these criteria to identify instability due to Cascading or uncontrolled islanding as long as it does not impose it on others: When a post contingency analysis results in steady-state facility loading that is either in excess of a known BES facility trip setting, or exceeds 125% of the highest seasonal facility rating for the BES facility studied. If the trip setting is known to be different than the 125% threshold, the known setting should be used. When transient stability voltage response occurs at any applicable BES bus outside of the criteria stated in Requirement WR1.3 of this document. When either unrestrained successive load loss occurs or unrestrained successive generation loss occurs.

WECC-0100:WR4 Rationale & Clarifying Points WR4 is not the definition for Cascading or uncontrolled seperation. WR4 essentially defines some of the precursors that could potentially lead to cascading or uncontrolled seperation. If any of the signs mentioned in WR4 are observed during a planning event, further investigation should be performed to ensure they don’t result in cascading or uncontrolled seperation. The 125% mentioned in bullet 1 of WR4 should only be used if the facility trip settings are unknown. The amount of successive load loss or successive generation loss is left upto the Transmission Planner or Planning Coordinator as this could be very prescriptive and could vary from system to system. A particular transmission planner could use WR4 as definition of cascading or uncontrolled seperation for its own system, but cannot impose the same definition on other Transmission Planners/ Planning Coordinators for the same system. (Just like WR2)

WECC-0100: WR5 WR5. Each Transmission Planner and Planning Coordinator shall use the following minimum criteria when identifying voltage stability: WR5.1 For transfer paths, all P0-P1 events shall demonstrate a positive reactive power margin at a minimum of 105 percent of transfer path flow. WR5.2 For transfer paths, all P2-P7 events shall demonstrate a positive reactive power margin at a minimum of percent of transfer path flow. WR5.3 For load areas, all P0-P1 events shall demonstrate a positive reactive power margin at a minimum of 105 percent of forecasted peak load. WR5.4 For load areas, all P2-P7 events shall demonstrate a positive reactive power margin at a minimum of percent of forecasted peak load.

WECC-0100: WR5 Rationale and Clarifying Points The intent of WR5 is to ensure the voltage stability of transfer paths as well as the system as a whole during peak load or peak transfer conditions. A positive reactive power margin can be demonstrated by a valid steady state power flow solution. –Solution includes actions of reactive devices and load tap changers appropriate for the time frame being studied. Higher margin required for the high probability events (P0, P1) and lower margin required for low probability events (P2- P7)

WECC-0100: WR6 WR6. Each Transmission Planner and Planning Coordinator that uses study criteria different from the base criteria in Requirement WR1 shall make its criteria available upon request within 30 days. The requirement ensure free flow of information between entities performing transmission planning analysis.

WECC-0100: Future Steps Fifth round of comment period for the “WECC Criterion – TPL- 001-WECC-CRT-3” closed on January 18 th, WECC-0100 Drafting team will address all the received comments. If substantive comments are received that require changes to the Criterion, then a new version would be posted for another round of comments, If not… Upon finalization of the criterion, it will be sent to WECC Standards Committee for approval and balloting.

Status of new Criterion Document day comment period for document version 5 ended on January 18 th

Questions ? 21