Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.

Slides:



Advertisements
Similar presentations
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Advertisements

Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Russ Rucinski, PPD/MD/DZero Ops DZero Solenoid status November 29, 2004.
EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Cryogenics Science Center/KEK (Nobuhiro KIMURA –20/April./2010 at ATF2 meeting ) 1 Resent Progress at KEK N. KIMURA, T. TOMARU, Y. AJIMA, T. KUME, A. YAMAMOTO,
Heat load study of cryomodule in STF
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
1 Cryogenic in Fusion Devices” Kavita Rathore MTech – NST Delhi University.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
CRYOGENICS FOR MLC Cryogenic Cooldown Scheme Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Review of PANDA Magnet Designs Reviewers A. Dael, D. Tommasini, and A. Yamamoto Held at GSI, th April, 2007.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Preliminary Design for the Coupling Coil Cryostat in MICE
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
He3 dilution refrigerator
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Subjects for SC FF magnet system at ATF2 Infrastructures at ATF2? How supply cryogen at ATF2 (set up cryogenic system?) (Gas helium recovery line?) Set.
To TT10 Nitrogen or helium gas LN2 Storage vessel buffer storage vessel G1G2 Magnet cryostat VALVE BOX Schematic diagram of the cryogenic system.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
MICE/MuCool Coupling Magnets ICST/HIT Progress and Schedule for the MICE/MuCool Coupling Coil Project HIT MICE CC Project Group.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Experimental study on heat transfer through a few layers of multilayer insulation from 300 K to 4.2 K Zhanguo Zong, Norihito Ohuchi, Kiyosumi Tsuchiya,
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
1 Cryogenic System of Interaction Region (SiD, ILD, QD0, QF1, Crab Cavity) in the Japanese Mountain Site WebEx meeting : June 19 th, 2012 IPNS/Cryogenic.
Final Design Cryogenic and mechanical configurations
Cryogenic behavior of the cryogenic system
MICE Meeting at RAL, Oct-23, 2005
Status of work on the cryostat design
LARP Vertical Test Facility
CRYOGENICS OPERATIONS 2008 Organized by CERN
Mathew C. Wright October 2016
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
A Complete System for Operation of a Superconducting Magnet*
Schematic diagram of the cryogenic system
PANDA The conceptual design of the control Dewar
Cryogenic behavior of the magnet
ESR2 Process Cycle Design
Cryogenics – The Basics
ESR2 Process Cycle Design
Presentation transcript:

Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet parameters 2.Stand alone operation

Magnet Parameters (1) Magnet & Coil Parameter

Magnet Parameters (2) Superconductor, Quench Protection

Magnet Parameters (3) Cryostat & Cooling Specification 5 ~ 10 W 15 ~ 30 W

Magnet Outlook and Drawing φ0.28 m L 1.84 m (coil 1.2 m) Cold Mass Coil : 630 kg <= Cu Iron Yoke : 4000 kg <= Fe LHe vessel: 860 kg <= Fe

LHe Dewar 2m 1m LHe Dewar 2m 1m Radiation cooling Vacuum Cap Commercial Transfer Tube Radiation cooling Stand Alone Case 1 Effective use of vapor helium gas. A vacuum cap is set on the multi-port of the cryostat. And vapor gas from LHe reservoir go to a thermal shield line through the by-pass tube. Commercial transfer tube is available. LHe consumption is 371 L/day. Cryostat modification \500,000 = ₡ 3,700 Stand Alone Case 2 Effective use of vapor helium gas. Multiple transfer tube with thermal shield is manufactured. Vapor gas flow through the thermal shield cooling line in the TRT and return to the magnet cryostat. It cools the thermal shield in the cryostat. LHe consumption is 274 L/day. Cryostat modification and new transfer tube need \4,000,000 = ₡ 30,000 Modification for Stand Alone Cooling

Pre-cooling & Necessary Cryogen Cold Mass Coil : 630 kg <= Cu Iron Yoke : 4000 kg <= Fe LHe vessel: 860 kg <= Fe Cu 630 kg, Fe 4860 kg Required Cryogen for Precooling 300 K -> 4.2 K Fe : LHe 33.6 L/kg Cu : LHe 31.2 L/kg 300 K -> 80 K -> 4.2 K Fe : LN L/kg, LHe 1.44 L/kg Cu : LN L/kg, LHe 2.16 L/kg Required Cryogen for Komag Precooling 300 K -> 4.2 K LHe : L <= Too large quantity 300 K -> 80 K -> 4.2 K LN2 : 3000 L, LHe : 8400 L

Cryostat Outlook with Service Ports Magnet was moved to an under ground hall (HELA-B) Magnet Outlook at Cryogenic Hall Drawings of Service Port is required. Joint Type of Pipes should be known.

Service Ports Outlook 1.LHe Supply 2.Vapor He Gas Return 3.LN2 Supply 4.Vapor N2 Gas Return

LHe Dewar 2m 1m Radiation cooling Commercial Transfer Tube Radiation cooling Steady State Radiation shield is kept at lower temperature of 30 K, which result in lower LHe evaporation. If heat load reduce at 1 W, LHe consumption is 250 L/day. Cryostat modification \2000,000 = ₡ 149,000 Precooling and Keeping at low temperature Precooling by using only the cryocooler takes about 1 month. But without LN2 handling. Keeping magnet at <70 K makes precooling time shorter. Stand Alone Cooling with Cryocooler Cryocooler + HEX 70 K 200 K Pump Cryocooler + HEX 70 K 200 K Pump