Status of ATF2 final focus prototype ( emphasizing French involvement ) Philip Bambade LAL-Orsay Andrea Jérémie et al. (LAPP) Marc Verderi & Hayg Guler.

Slides:



Advertisements
Similar presentations
Nick Walker KEK-DESY meeting 7 th March 2005.
Advertisements

PARTICIPATION IN THE DESIGN AND R&D ACTIVITIES FOR A FUTURE LINEAR COLLIDER: A. Faus-Golfe IFIC - Valencia Accelerator and Detector aspects FPA
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Status of ATF2 final focus prototype ( emphasizing French involvement ) Collaboration with China : Jie GAO, Sha BAI (IHEP, Beijing) Philip Bambade LAL-Orsay.
1 ATF2 Tuning and its application to ILC and CLIC FFS/IR region ASTeC and MAN : working together on tuning methods for the ATF2 and ILC IR/extraction design.
ATF2: the linear collider final focus prototype at KEK - an international telescope for nanometre size beams - Philip Bambade Laboratoire de l’Accélérateur.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
1 LAPP in ATF2 Extraced from ANR bid A.Jeremie. 2 LAPP in ATF2 Current activities related to accelerators: The LAPP-Annecy team is currently developing.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Budget requests from French Institutes for ILC (machine) funding in 2007 (EU funding excluded). T. Garvey - European GDE meeting, DESY, 10 th May 2006.
First investigations of ATF2 at SLAC Axel Brachmann, Thomas Himel, Tom Markiewicz, Janice Nelson, Toshiyuki Okugi, Mauro Pivi, Tor Raubenheimer, Marc Ross,
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Intermediate  configurations at the IP for commissioning and optimization Sha BAI IHEP/LAL Philip BAMBADE LAL.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
LET in the ILC DRs with Minimal Tuning Knobs and other assorted information James Jones Deepa Angal-Kalinin and Frank Jackson.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
FP7: EuCARD after a year of preparation… A.Jeremie.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
A_RD_2 The ATF2 KEK Final Focus prototype of the linear electron machine May 16 th 2008 Marc Verderi (LLR) for KEK, Saga Uni., Tohoku Univ.,
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
25 October 2004O. Napoly, EU-GDE meeting in Oxford 1 French Funding Agencies CNRS/IN2P3 : National research Institute on Nuclear Physics and Particle Physics.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
1 A_RD_2A_RD_2 Design of the linear collider machine-detector interface and ATF-2 at KEK Ph.Bambade, J.Brossard, O.Dadoun, C.Rimbault, M.Alabau Pons, A.Jeremie,
A_RD_2 Collaboration on ATF2 final focus prototype and MDI for future linear colliders ILC & CLIC Philip Bambade LAL & KEK On behalf of colleagues from.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
LAL-IHEP collaboration on the linear collider final focus & ATF2 prototype Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
ATF2 Status Background for the installation planning of Collimator
Special ATF Session - ATF/ATF2 day on 28th September -
Expected hardware status and Priority of the commissioning task
Oversea collaborators
What Should We Do?.
CLIC-ILC BDS & MDI work.
Background study plans : from to ILC
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Presentation transcript:

Status of ATF2 final focus prototype ( emphasizing French involvement ) Philip Bambade LAL-Orsay Andrea Jérémie et al. (LAPP) Marc Verderi & Hayg Guler (LLR) ILC-GDE-France meeting Orsay, 29 January 2008 with

LC needs nanometer-size beams Linac repetition rate f << ring frequency  need tiny IP size  Beam-beam mutual focusing  beamstrahlung, disruption…  2   n  /  set  z   y H D = disruption enhancement f = linac repetition rate N e = bunch population n b = bunches per train  = RMS bunch size  = emittance  = power transfer efficiency 1. RF technology (gradient, efficient power transfer) 2. Beam phase-space control & stability  emittance  focus

ATF2 final focus KEK Goal A : nanometer beam size - obtain  y ~ 35 nm at focal point - reproduce reliably  y and maintain in time Goal B : trajectory stabilisation nm at focal point - intra-train feedback (ILC-like trains) 1. Expert training on real system 2. Instrumentation for nano-beams 3. Accelerator RD & operation by multi-partner collaboration 2008 end construction & installation october 2008 first beams 2009 commissioning COST : ~ M$  Asia, EU, US

ATF2 Construction Schedule Not changed since December 2006

Assembly hall before construction Assembly hall emptied for construction Construction of reinforced floor Construction of shielding Photos: Nobu Toge ATF2 construction

Pictures of installation 4. The last magnet is going to the destination 5. Installation is finished Dec concrete base blocks were installed Jan movers and 19 quad-systems were installed 3 dipoles and 3 sextupoles not yet… R. Sugahara (KEK)

LAPP: Mechanical support & stability of FD Characterisation & impact in beam operation A.Jérémie, G.Gaillard, N.Geffroy B.Bolzon  continues as ANR post-doc LLR: Background evaluation (algorithm, GEANT4) Instrumentation & experimentation for validation M. Verderi, H.Guler (ANR post-doc) LAL: Beam tuning & control / slow feedback controller Commissioning & operation / optimization “Flight simulator” tool, instrumentation studies P.Bambade, J.Brossard, C.Rimbault Y.Rénier, M.Alabau (Valencia), S.Bai (IHEP) + ANR post-doc to be hired in 2008 (quasi done) KEK direct partner + UK, SLAC, CERN, IHEP, Valencia

Present French support for ATF2 ANR ( ) : 400k€ project grant to fund 1) three 2-year post-docs at LAL,LAPP and LLR 2) equipment money for mechanical stabilisation work at LAPP AIL France - Japan : travel & equipment transport 1) 20k€ for LAL-LAPP-LLR in 2007, 25€ requested in 2008 AIL France - China : support for ATF2 including to KEK 1) 3k€ for LAL in 2007, 6k€ requested in 2008 AIL funds within IN2P3 institutional funds… IN2P3 “institutional” and other (at LAL) : 1) permanent & temporary staff (e.g. 1 2) additional travel & equipment LAL in 2007) 3) Eiffel ministerial 1-year PhD grant for S. LAL 4) Orsay university 3-year PhD grant for LAL

Y. Renier (LAL) Thanks to A. Seryi & measurements from KEK f

Design beam-based feedback at IP Y. Renier (LAL) f

ATF EXT emittance investigation  task force  Must make sure this won’t limit ATF2 !

First results with controlled bump in QM7 Learning control room work  will continue more systematically in 2008 M. Alabau (IFIC - LAL) J. Brossard (LAL)

Investigate emittance reconstruction methods: 1.Multiple wire scanners   2 minimisation (constraints ?) 2.Combine normal + skew quad scans  reliable xy coupling ?  Dedicated schemes for flat beams (error analysis…)  Develop practical tools for efficient control room work C. Rimbault (LAL)

1.Increasing  y  gradual approach with looser tolerances 2.Reducing  y  enhanced performance 3. Idem at displaced IP locations hosting other instruments 4. Prepare magnet knobs for orthogonal waist scanning S. Bai (IHEP / LAL) minimum nominal

Contribution to “flight simulator” for ATF2 (collaboration with CERN, SLAC and KEK)

ATF2 Background : what can we learn ? Background Photons inside 1m Background Photons inside 10cm Generated 100% flat HALO  E=0.1% Gaussian –From 0.1%  1% electron in Halo –Signal : Compton signal photons –  Use Collimator to eliminate the background photons On going studies: Trying to describe the background normalization  Better describe the HALO (Shape, population, energy distribution)  Include (design) collimator to eliminate background Further steps:  Background from the dump  Photons and charged particles  Neutrons  Special techniques  “event biasing methods” Photons spectrum from the Beam Position measurement device (Shintake monitor) H. Guler (LLR)

- Significant impact on ATF2 commissioning and beam experimentation, characterisation of IP stability, understanding and control of beam-induced backgrounds, instrumentation  presence at KEK… - Research within international collaborative environment for accelerator R&D, as HEP experiments Big labs Univ. group … project “tasks” practical learn by doing academic endeavour publish or perish… research bids / contracts Training impact : future leaders (ILC, other…) Present aims of French ATF2 involvement ( 2008 – 2010 )

Concluding remarks 2-3 exciting years ahead of us ! Scope for significant contributions towards a future linear collider  ILC & CLIC BDS+MDI interesting three-way collaboration: - UE team (France, UK, Spain…) - Japan + China - and our American colleagues and friends…

Additional slides

Main present French ILC activities Linac technology: SC cavities (processing & control), cryogenics, RF couplers Injectors, sources (Compton based e+) MDI & BDS  ATF2 (experimentation) Detector R&D: EM calorimetry (CALICE), Silicon sensors (vertexing & tracking), TPC Physics studies, phenomenology Communication & outreach International project framework and governance Established R&D programs contribute to global ILC project Emphasis on feasibility demonstration and risk reduction XFEL & DESY ?

Delays from recent ILC cuts ? 1) magnets, power supplies, beam position monitors, magnet movers, misc.  95% completed, KEK will help finalise : minor hardware, travel… 2) damping ring beam position monitor upgrade (needed for further DR emittance reduction)  unclear at present… 3) Commissioning & optimisation, “flight simulator”  More remote work & through link up with partner teams… 4) Beam instrumentation, feedback, commissioning & tuning  expect slower continuation under “generic LC R&D” (EUCARD) SLAC UK ATF2 startup should be on time Partners (we ?!) may be asked to do more…

Wasn’t FFTB sufficient ? 1.Not operated as dedicated facility  small beam sizes shown but little reproducibility and systematic study 2. Long-term stabilisation issues not addressed 3. Final Focus not based on new principle of local chromaticity correction ( )

Optical telescope to minimize  * local chromaticity correction with pairs of sextupole doublets  optical bandpass Focus in one plane, defocus in another: x’ = x’ + G x y’ = y’– G y Second order focusing x’ = x’ + S (x 2 -y 2 ) y’ = y’ – S 2xy Just bends the trajectory L ~ 300m l* ~ 5m +dp/p  dp/p

S. Bai (IHEP / LAL)

Fast ns rise-time kicker tests for train (de-)compression and production of ILC-like train T. Naito (KEK)