2017 Coastal Master Plan Overview Karim Belhadjali

Slides:



Advertisements
Similar presentations
UNSW Strategic Educational Development Grants
Advertisements

US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
US Army Corps of Engineers BUILDING STRONG ® Louisiana Coastal Area Modification of Davis Pond Study Overview Governor’s Advisory Commission on Coastal.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Update Bren Haase Louisiana Office of Coastal Protection and Restoration Presentation.
EEM Established in 1989 Section of the Streets and Highways Code provides the Legislature with the authority to allocate $10 million annually. Fiscal.
Tracie Billington, P.E. Chief Financial Assistance Branch Department of Water Resources.
Fiscal Year 2013 Annual Plan BRIEFING TO: COASTAL PROTECTION AND RESTORATION AUTHORITY Baton Rouge, LA January 18, 2012.
Budget Development Timeline (subject to change) Budget Process Kickoff  October 26. VP’s and deans determine how budget discussions will occur in their.
CONSERVATION AND RESTORATION PARTNERSHIP FUND FY 2012 Request for Proposals August 17, 2011.
LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Date: April 16, 2014.
US Army Corps of Engineers BUILDING STRONG ® Flood Risk Management Update Stephanie Bray 12/10/2013.
Watershed Council June 22,2010 BAIRWMP Update BAIRWMP Update State Funding: State Funding: Prop 50 Prop 50 Prop 1-E (Stormwater Flood Management), Prop.
US Army Corps of Engineers BUILDING STRONG ® North Atlantic Coast Comprehensive Study U.S. Army Corps of Engineers Coastal Storm Risk Management Planning.
Regional Flood Plain Management Council April 15, 2015 H-GAC December 2nd.
Integrated Ecosystem Restoration and Hurricane Protection: Louisiana’s Comprehensive Master Plan for a Sustainable Coast.
Louisiana’s 2012 Comprehensive Master Plan for a Sustainable Coast Path Forward on Nonstructural Program Implementation CPRA Meeting - October 17, 2012.
LCA Mississippi River Hydrodynamic and Delta Management Study (MRHDMS) Carol Parsons Richards River Studies Manager Governor’s Advisory Commission on Coastal.
CBA Viet Nam CBA Preparatory Workshop Bangkok, Thailand, Oct 2007.
Lower Mississippi Valley Joint Venture Management Board Meeting the Expectations and Challenges of Joint Venture Implementation Buras, Louisiana June.
Urban Planning II. Information sources City Development Authority Basic source of information Strategic plan for Prague.
Integrated Regional Watershed Management Plan Presentation – March 12, 2013 HLVRCD.
Land Building Sediment Diversion at Myrtle Grove: Evolution & Status Update Brian Vosburg Geologist Governor’s Advisory Commission Meeting August
QRIS Quality Improvement Grants Board of Early Education and Care March 9, 2010.
Oil Spill Restoration Planning – NFWF Proposal No.1 Kyle Graham Deputy Director CPRA July 17, 2013 committed to our coast.
Large Scale Nonstructural Programs - Louisiana’s Comprehensive Master Plan for a Sustainable Coast – 2012 Update Association of State Floodplain Managers.
Define the project identify potential funding sources gather information write and package the proposal submit the proposal to a funder Piece of cake?
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
SOUTHWEST COASTAL AND SOUTH CENTRAL PROJECTS – Update and Path Forward CPRA Meeting January 22, 2013 committed to our coast.
Great Lakes Environmental Research Laboratory Review – Ann Arbor, MI November 15-19, Click to edit Master text styles –Second level Third level.
Update On Mississippi River Delta Management Plan Presented at August 20, 2009, Meeting of Governor’s Advisory Commission on Coastal Protection, Restoration.
House Concurrent Resolution 171 (2010) Levee District Oversight Planning Study Report to the Senate and House Committees on Transportation, Highways, and.
Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.
Coastal Restoration Updates September 10, 2007 Coastal Restoration Updates September 10, 2007 Louisiana Department of Natural Resources Louisiana Department.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
HAZARD MITIGATION PLAN UPDATE LOCAL EMERGENCY PLANNING COMMITTEE.
Fiscal Year 2012 Annual Plan Integrated Ecosystem Restoration and Hurricane Protection in Louisiana Governor’s Advisory Commission on Coastal Protection,
Oil Spill Restoration Planning Part 2 (RESTORE Act, Criminal, NRDA, SEPs) Kyle Graham Deputy Director CPRA May 15, 2013 committed to our coast.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Overview.
CONSERVATION AND RESTORATION PARTNERSHIP FUND FY 2014 Request For Proposals September 18, 2013.
Fiscal Year 2012 Annual Plan Integrated Ecosystem Restoration and Hurricane Protection in Louisiana Coastal Protection and Restoration Authority Karim.
STATUS UPDATE FOR CPRA January 26,  Study combines Cong. Boustany Recon with LCA Chenier Plain Effort  Cost Share Agreement signed in Jan
STATUS UPDATE FOR CPRA September 21,  We are 2.5 years into the Feasibility Study  Study is being cost shared between the State and the.
Developing Resiliency Along the Coasts: Experiences of the Coastal States Kristen M. Fletcher Coastal States Organization
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
LCA Program State Concerns Moving Forward February 25, 2010 Kyle Graham Governor’s Office Coastal Activities.
DEEPWATER HORIZON $1B EARLY RESTORATION AGREEMENT Governor’s Advisory Commission May 11, 2010.
Gordon State College Office of Institutional Effectiveness Faculty Meeting August 5, 2015.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Middle Fork Project Relicensing Process Plan April 25, 2006.
Water.europa.eu Floods Reporting Drafting Group Progress report WG D Maria Brättemark WFD Team, DG ENV.D.1, European Commission.
U.S. Fish and Wildlife Service Office of Subsistence Management Federal Subsistence Board January 12-13, 2016 Work Session.
Science Translation, Conservation Adoption and Delivery: Revised process for needs and projects related to science translation and adoption Steve Fuller.
CPRA Program Update ACEC, New Orleans Chapter April 14th, 2016
Viet Nam SREX NGOs contribution Presentation to CCWG Dang Thu Phuong (Challenge to Change) Phan Manh Tuan (freelancer) 1 August 2013.
US Army Corps of Engineers BUILDING STRONG ® North Atlantic Coast Comprehensive Study Collaboration Webinar Series #5: Policy Challenges and Institutional.
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
Chesapeake Bay Program
Louisiana’s Coastal Protection and Restoration Update
GIWP New approaches to river basin management for sustainable development in China A global collaboration General Institute of Water Resources and Hydropower.
Update from the Faster Payments Task Force
CPRA Program Update ACEC, New Orleans Chapter April 14th, 2016
President’s Report Robert B. Gagosian October 15, 2009
Expert Panel on Diversion Planning and Implementation: Meeting #3
Louisiana Coastal Area
Preferences for Timing of Wetland Loss Prevention in Louisiana
U.S. Army Corps of Engineers Coastal Storm Risk Management
Diversions Update committed to our coast Kyle Graham, CPRA
North Atlantic Coast Comprehensive Study Collaboration Webinar Series #2: Ecosystem Goods and Services U.S. Army Corps of Engineers Coastal Storm Risk.
2023 Coastal Master plan committed to our coast
FUNDS PROVIDED TO TEXAS
Presentation transcript:

2017 Coastal Master Plan Overview Karim Belhadjali committed to our coast

Advancements and Updates Consider new project Project integration and timing Identifying keystone projects for each basin and outcomes Spatial distribution of and expectations for ecosystem outcomes Funding assumptions and allocations Continued public input Changing landscapes Review of uncertainties and assumptions Socio-economics and fisheries distribution analysis for areas in Barataria, Breton, and Terrebonne Coastal Protection and Restoration Authority of Louisiana

Advancing our Technical Analysis Coastal Protection and Restoration Authority of Louisiana

NEW: Project Development Program CPRA will accept proposals for new projects from any source to be evaluated in the 2017 Coastal Master Plan New projects can be proposed: That build and/or sustain land, through projects types identified in the 2012 Coastal Master Plan That provide significant Flood Risk Reduction, through structural or non-structural projects In response to radical shifts in the coastal landscape, resulting from hurricanes or other disasters that have occurred since the 2012 Coastal Master Plan That address future uncertainty challenges, such as climate change Coastal Protection and Restoration Authority of Louisiana

NEW: Project Development Program Screening Criteria: Like the 2012 plan, a screening process will be used to determine whether a project has the potential to be included in the 2017 analysis Size Threshold Geographic Area Consistency with Master Plan Objectives and Principles Duplicative Effects All proposals must be delivered electronically, in .pdf format, to MasterPlan@la.gov by August 21, 2014 Coastal Protection and Restoration Authority of Louisiana

The Master Plan Delivery Team

Timeline Key Dates: January-February 2017 – Draft Plan and Public Meetings April 2017 – Plan Submitted to Legislature