MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

Vacuum Vessel Production Readiness Review
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
10 October 2006 MICE CM-16 at RAL 1 Distributed versus Lumped Coupling Magnets Michael A. Green and Soren Prestemon Lawrence Berkeley Laboratory, Berkeley.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
RF Cavity / Coupling Coil Module
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
Status of MICE Coupling Coil Magnets D. Li and M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory February 16, 2011 MICE CM29-Rutherford.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Overview of the RFCC Module and 201-MHz Cavity Design
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
Presentation transcript:

MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February 25, 2014

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 2 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Outline Cold mass Prototype vacuum vessel Prototype thermal shield Prototype cooling circuit

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 3 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 MICE Cooling Channel Two coupling coil magnets integrated into the RFCC modules Spectrometer solenoid magnets Focus magnets

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 4 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Coupling Coil Sub-assemblies

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 5 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Prototype Coupling Coil Cold Mass Preparation cold mass coil #1 finished at LBNL January 2013 Preparation of cold mass coils #2, #3 and #4 at LBNL to begin when coils arrive from China Strain Gauges Cernox Sensor Voltage Taps Quench Protection Superconductor Lead Stabilizers

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 6 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Prototype Cold Mass Magnetic Test at Fermilab The 1 st cold mass is currently undergoing magnetic testing at Fermilab

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 7 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Prototype Coupling Coil Vacuum Vessel LBNL mechanical shop is in the process of fabricating the first cryostat vacuum vessel Estimated completion the end of March (vacuum vessel, tower, warm bore) Drawings will be updated to reflect the “as built” cryostat

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 8 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Coupling Coil Coupling coil magnet integrated into the RFCC RFCC Module

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 9 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Prototype Coupling Coil Scallop Clearance Tight tolerance for vacuum vessel scallops Because of the tight clearance distance (2 mm) between the concave radius of the scallop and the O.D. of the RF coupler vacuum vessel spool a tight tolerance was placed on the final locations of the welded scallops. The tolerance is true position within mm Scallops

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 10 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Prototype Coupling Coil Scallop Clearance MLI superinsulation must also fit inside the 12.5 mm gap between the thermal shield and the inner surface of the scallop. Limited space between inner surface of the scallop and the thermal shield

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 11 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Prototype Coupling Coil Vacuum Vessel Tolerance Tight tolerance on the final locations of the welded scallops.

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 12 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Prototype Coupling Coil Scallop Original Scallop Design Original thin walled scallop deformed during welding Gap shows the distortion from welding the scallop to the vacuum vessel

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 13 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Prototype Coupling Coil Scallop New Scallop Design New design has thicker walls at location of welds to help minimize the distortion

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 14 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Alignment Fixture for Welding Scallops Scallop alignment fixture LBNL shop developed a go/no go alignment fixture to ease the welding process for the scallops Scallop alignment fixture Nominal and ± indicators

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 15 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Prototype Vacuum Vessel Welding Complete Next steps for vacuum vessel LBNL shop will machine the central bore and the tower flange Finish machine the tower Complete the warm bore roll- up Vacuum check the vessel, the tower and the warm bore Ports and bore shown covered due to the bead blasting process

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 16 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Prototype Thermal Shield Status Initial thermal shield design and drawings were completed Reviewed by LBNL Superconductor Magnet Group Design is being revised for ease of fabrication and assembly (see following slides)

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 17 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 New Concept For The Thermal Shield Design concept from Fermilab shown Thermal shield fabricated in two symmetric halves Eliminates welding of TS as final assembly step Removes the risk of damage to the MLI wrapped around the cold mass New model and drawings will need to be generated

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 18 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 New Concept For The Thermal Shield Concept model of split thermal shield with edge lip for fasteners Lips joined by fasteners Half of assembly Full assembly

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 19 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Prototype Cooling Circuit Assembly Status Initial design drawings have been finished and reviewed by the LBNL Superconducting Magnet group Revisions required before requesting quotes from outside vendors Also requires addition of fiducial target mount points LBNL will ship cooling circuit as two sub-assemblies, to be integrated at FNAL in final assembly

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 20 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Cold Mass / Thermal Shield Mock-up A wood mock-up of the cold mass/thermal shield is being planned to assist in defining the coupling coil magnet assembly procedure

Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 21 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Projected Schedule Cryostat vacuum vessel components Completed end of March, shipped to FNAL in April Incorporation of red-lines into final drawings by ~mid-June Thermal shield Redesign & drawings to be completed by end of March Fabrication estimated complete by end of May Cooling circuit Drawing revisions to be completed by mid-April Fabrication estimated complete by July/August Cold mass mockup Design complete by end of February Fabrication complete by end of March

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 22 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 Prototype Coupling Coil Fabrication Update – MICE CM38 - Napa California Page 22 Allan DeMello - Lawrence Berkeley National Lab – February 25, 2014 Summary of Prototype Coupling Coil Cold Mass LBNL finished cold mass preparation work January 2013 Cold mass is currently being tested at Fermilab Cryostat Vacuum Vessel LBNL mechanical shop is fabricating the first cryostat vacuum vessel Scheduled to finish the end of March Thermal Shield Initial design drawings have been finished and have been reviewed by the LBNL superconducting magnet group New thermal shield concept introduced by Fermilab New model and drawings need to be generated prior to fabrication Cooling Circuit Initial design drawings have been reviewed by the LBNL superconducting magnet group Revisions required before requesting fabrication quotes LBNL will integrate components into two sub-assemblies to be shipped to FNAL this summer