ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.

Slides:



Advertisements
Similar presentations
Scott Coffin Adam Faucher Jason Graika Brian Voelz Client: Honeywell Advisor: Dr. Zhengdao Wang.
Advertisements

ECE 4334: Capstone Design Fall 2009 Welcome ! Facilitator: Dr. Len Trombetta.
Timed Traffic Light PCB Josh Angell June 1, 2011 IME 458.
Printed Circuit Board Design
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
IEEE-1394 Data Link Design Review Sherry Womack Erik Pace ECE 4040 Dr. Martin Brooke.
Barton St Peter’s Advent Calendar.
Wireless Speaker System ECE791/792 Oral Proposal Project Team: Robert Mamone, Brett O'Connor Faculty Advisor: Dr. Richard Messner Date: October 28, 2009.
深圳创至博发实业有限公司 shenzhen opcsun industry co.,ltd Patch cord’s Production Flow.
M N PHASES Photos of Moon Phases November and December, 2006.
Procedure 1: Determining Resistor Resistances Procedure 2: Circuit Experiment Board Procedure 2: Circuit Experiment Board #1 Procedure 3: The Potentiometer.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Project Checklist ◦ SyRs – Completed ◦ SDS – In progress ◦ Project-  GUI Cleanup – In progress  Hardware Replacement - Completed  Actual Testing – In.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Group 2 - Project Update April 1, 2004 Tyler Helble.
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
HB64: Course Evaluation Based on Enrollment & Performance Chairs & Directors November 19, 2016.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-
Tuesday December 4th 1. Review Game 2. Open Fall of the Roman Empire letter project Take notes from video 3. Fall of Roman Empire Video (40)
Community POWER Reporting Laurie Gustafson, Program Manager November 26, 2012 A program of the Solid Waste Management Coordinating Board.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #12  PROGRESS  Connectorized RX, Connectorized TX, & TX/RX Combo tested using 100m cable  Unconnectorized.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Indoor Localisation Sensor for Elderly People Student: Damien Reilly Supervisor: Dr. John Breslin.
STUDENT LED CONFERENCES FEBRUARY UPDATED SLC SCHEDULE Tuesday, Feb. 9 1st period8:00-9:15 (75) 2nd period9:20-10:35 (75) Lunch10:35-11:15 (40)
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
FALL SEMESTER 2015 DATES TO REMEMBER. DATES ACT Test DatesReg. Deadline September 12, 2015 August 7, 2015 October 24, 2015 Sept. 18, 2015 December 12,
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
The CED’s & DED’s role in the Tenure & Promotion of Agents
Scintillating Fiber BLM with PMTs
Space Communication Cross Support Architecture WG
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
22446: Microprocessors Introduction
West Mecklenburg High School
FEE Electronics progress
ECE4006 Group 6 – Presentation 9
Welcome Back NTHS!! August 9,2017.
ECE 4006 Group6 – Presentation 6
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
Math Monday, Oct 29th Check Envision pgs: 60-62/Grade
Presenter: Allen Duncan
Autonomous Rescue Vehicle (Team 10)
ECE 4006-C Presentation the almost Last (10th)
Faculty Champion Meeting
Gigabit Ethernet Design ECE 4006C – Spring 2003
ME 280 Lab Final Project Begins November 3rd for sections 3, 4 and 5, and November 7th for sections 1 and 2 Due December 1st for sections 3, 4 and 5 and.
Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.
ECE 4006 Group 6 – Presentation 8
UCAS 2018 Priestley College
Capstone Design Update
ME 280 Lab Final Project Begins March 20th for sections 4 and 5, and March 21st for sections 1, 2 and 3 Due April 17th for sections 4 and 5 and April 18th.
ME 280 Lab Final Project Begins March 26th for sections 4 and 5, and March 30th for sections 2 and 3 Due April 21st for sections 4 and 5 and April 22nd.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
ME 280 Lab Final Project Begins November 5th for sections 4 and 6, and November 9th for sections 1, 2 and 3 Due December 2nd for sections 1, 2 and 3 and.
GROUP 1 FINAL PRESENTATION
Welcome.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
ME 280 Lab Final Project Begins November 4th for sections 3, 4 and 5, and November 8th for sections 1 and 2 Due December 2nd for sections 3, 4 and 5 and.
ME 280 Lab Final Project Begins March 22nd for sections 4 and 5, and March 23rd for sections 1, 2 and 3 Due April 19th for sections 4 and 5 and April 20th.
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
ECE 135 – The Three Presentation 9
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Presentation transcript:

ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the alignment tolerance test on 1 st transmitter board Complete transmitter testing on 2 nd board with connectorized components on both design Complete the final report Progress to date: Planned Work: Return all the hardware components to Dr. Brooke Complete and turn in the course survey

Final Board Layout Receiver board Tx board design 1 Tx board design 2

Improved First Tx board Patch Cord, our ReceiverPatch Cord, Receiver box 100m fiber, our Receiver 100m fiber, Receiver box

Second Tx board Testing Patch cord, our Receiver Patch cord, Receiver box 100m fiber, our Receiver100m fiber, Receiver box

Have a great time in this class Good luck on your other finals !