09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Fri – Sat - Sunday 30 Sept - 2 nd October Friday  06:00 Operator dump fill #2171, integrated lumi 75 pb-1.  90 m  * optics Optics ok, collisions at.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
● 08h00: Adjust mode for end-of-fill study. Scraping test for determining transverse beam profile (beam 2, vertical). As expected, beam dumped with BLM.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Wednesday
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Machine Coordinators: G. Arduini, J. Wenninger
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Report Week 40 (R. Assmann & E.B. Holzer)
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Summary week 18 Intensity ramp up & production
Saturday 3rd November - morning
Tue/Wed 12/ :00 Probe beam back again
Thursday – Morning Energy matching at injection with H CODs
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Summary for LPC (March 7th, Ralph Assmann)
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no PM data. 10:27 Try to reset Q4.R6. Not possible. Access needed. 11:03 Prepare access to UA area in point 6. 12:17 Prepare tunnel access in point 6. 14:27 Lost cryo conditions in the MSR6. 14:53 Q4.R6 problem solved (~5h impact).  The firing of the heaters has somehow affected the current lead instrumentation. Could not reset the QPS of the Q4. Was issue with the ELQA proximity box, on the current lead side. The fault was cleared by de-plugging and re-connecting the cable but it is not clear what the source was. The QPS and ELQA teams are still working to try and understand more in details what happened. Monday LHC morning report

Fill # LHC morning report

Fill # LHC morning report

15:36 Pre-cycle. Some RF cavity studies (Philippe). Some BLM thresholds changed. 16:55 Injection. 17:28 Optimization of transfer line is required (~1h impact). 18:40 Injector beam optimization (~0.7h impact). 19:36 Filling complete. 19:45 Ramp. 20:34 Stable beams. Fill #2180. Peak lumi ~3.2e33 cm -2 s :35 ALICE leveling started. 20:48 Beams dumped due to high losses in IR2 after vacuum spike. 21:41 Injection. 23:54 Stable beams. Fill #2181. Initial lumi 3.2e33 cm -2 s -1. Monday LHC morning report

Last 24hours LHC morning report

BLM threshold change for 10 triplet monitors at IP1 and IP5 the RS10-12 were set to the same value (in Gy/s) as the RS09 to allow for luminosity induced loss signals (and avoid having the BLMs constantly at warning levels during physics collisions). Thresholds consequently increased by up to a factor of 2.6. See LHC-BLM-ECR-0026 for details. Monitors concerned: BLMQI.01R1.B1E30_MQXA BLMQI.01R5.B1E30_MQXA BLMQI.01L1.B2E30_MQXA BLMQI.01L5.B2E30_MQXA BLMQI.02L1.B1I23_MQXB BLMQI.02R1.B2I23_MQXB BLMQI.02R1.B1E30_MQXB BLMQI.02R5.B1E30_MQXB BLMQI.02L1.B2E30_MQXB BLMQI.02L5.B2E30_MQXB BLM Thresholds (Barbara & Eduardo) LHC morning report

Modified BLM Thresholds LHC morning report

Transfer Line Issue: Oscillations LHC morning report

Losses in IR2 triplet LHC morning report

Losses in TCTH.4R2.B LHC morning report

IR2 Behavior LHC morning report

IR2 Behavior LHC morning report

IR2 Vacuum LHC morning report

Stable beams LHC morning report

Present tentative planning week 40 Mon/Tue:Physics. Tue (day):RF preparation for 25 ns & Abort gap cleaning (7h) Tue (pm/night):Physics Wed (day): Large pile-up MD (9h) Wed (pm/night):Physics Thu (day):25 ns MD (12h) Thu/Fri/Sat/Sun:Physics To be done: Loss map qualification for injection & physics R. Assmann 03/10/2011

Abort Gap Cleaning LHC morning report J. Uythoven

High Pile-Up MD (Werner Herr et al…) PS/SPS to prepare high intensity bunches for Wed morning. Hope for two fills with single/few bunches. Need RF, ADT, tune feedback experts. Fill #1:  1b per beam. >2e11 p/bunch. Norm. emittance < 2.5  m.  All interlock actives. Standard cycle.  Inject, ramp, squeeze, collide in ATLAS and CMS.  1-2h collision time – stable beams, depends on progress. Fill #2:  Same bunch parameters. More bunches possible: additional collisions in LHCb/ALICE with low intensity bunches, 10 high pile-up collisions in CMS, …  Leave for collisions – stable beams, depending on progress. R. Assmann 03/10/2011

High Pile-Up Parameter Space LHC morning report Werner Herr

25ns MD MD plan (G. Arduini & B. Goddard):  08: :00, beam setup and changeover in SPS and in transfer lines, injection of 12 and 24b trains to LHC.  10: :00, RF setup (observation of transient and eventual tuner fine adjustments, 1h/beam)  12: :00, damper setup with single bunch and 12b trains (4h beam time needed).  16: :00, increase of injected intensity 24b, 48b, 72b (with 144b, 216b, 288b as options). The objective is to be able to inject (and keep in) at least 1 train of 72b, for the subsequent MD sessions. Exiting the MD, a ramp attempt will be made with (12+2x24)b at 25 ns, as the experiments would like some collisions - this could therefore be between 19:00 and 01:00  stable beams. R. Assmann 03/10/2011

25ns - Detailed MD plan (G. Arduini & B. Goddard)  to be done in SPS before MD (KC/JW/..) establish 25 ns beam (1.1e11 p+/b, ~3 um) on cycle in SPS. 12b, 24b, 48b, 72b, 144b, 216b and 288b. check characteristics for all beams (trans/long emittances, scraping settings, intensities) if possible (when LHC off) extract 12b onto upstream TEDs (based on 25 ns cycle settings) and first steering if needed extract 12b onto downstream TEDs and check TL steering.  LHC RF preparation (PB) Modification to tuner firmware (Wednesday 5th - no access needed) Increase of klystron HT from 50 to 56 kV, and tests (1-2 h during rampdown or access) R. Assmann 03/10/2011

25ns - Detailed MD plan (G. Arduini & B. Goddard)  beam setup and changeover to 25 ns (2h) cycle change in SPS LHC damper settings to 25 ns 12b to downstream TEDs, check of steering inject with 12b at 25 ns and check steering and injection oscillations. correction of injection oscillations and steering for beamloss at TCDIs if needed. if required opening to +/-5 sig of most critical TCDI collimators in TI8. if required basic re-setup of most critical TCDI collimators, plus change of interlocks (*** as a last resort! ***) check losses with 12b injections for both beams  RF checks (1-2h) when 12b injection OK for each beam, check of cavity voltage/klystron power transients adjustment of tuner fine delays if needed not possible in parallel with ADT (can start ADT work when first beam done for RF) R. Assmann 03/10/2011

25ns - Detailed MD plan (G. Arduini & B. Goddard)  damper setup (4-5h) detailed setup of damper (4 h beam time needed) with RF and damper OK, accumulation of a few 24b batches in each beam to check losses etc.  increasing injected intensity (4h) when 24b injection OK for each beam, for nominal chromaticity inject 48b batch; if not OK due to instability, increase chromaticity to units; when 48b can be injected OK, inject additional 72b batch; if OK, inject additional 144b batch;  preparation for ramp attempt fill with (12+(2x24b)) scheme  recovery (after ramp attempt) revert all settings to 50 ns ones (if needed) revert all interlock thresholds to 50 ns ones, and make separate cross- check test injection of 12b at 50 ns still OK. R. Assmann 03/10/2011