1 Saturday 3rd November - morning
09:05 lost fill 3259 to a fault on RB.A67 energy extraction (on-going problem) 3259: 143 pb-1 in 9h27m Access for: ALICE – reasonably urgent 4 hour access P6 for MPE piquet and QPS expert, Bozhidar. A micro-switch was found faulty and exchanged. 13:45 Pre-cycle started 14:30 Cryo operator warns of the loss of two low pressure compressors at P2, potentially affecting the stability of the DFB's. LHC status

2 Saturday 3rd November - afternoon
15:45 The cryo problem is due to a faulty cable in a control card. Manage to fix the cable (worn insulation) and recover situation 16:10 Cryo give OK to proceed 16:42 Successful start-up of daughter number 2 3.55 kg, 50 cm Nappy fill #5 – commissioning in progress 16:40 Injecting physic beam Had attempted to run without batch-by-batch blow-up but not straightforward – settle for reducing target bunch length (thanks to Daniel Valuch for his help) Transfer line steering required – beam in OK but still not ideal LHC status

3 Saturday 3rd November - afternoon
19:15 Stable beams fill 3261 Initial luminosity: 7.27e33 cm-2s-1 00:55 Beams lost to possible spurious BLM trigger (tbc) Fill 3261: 105 pb-1 in 5h 42m refilled with similar conditions as the fill before Ib=1.66e11 ppb and emittances between 04:00 brought 3262 into PHYSICS with peak luminosities of ~7e33 cm-2s-1 04:30 that fill was lost after ~31 min. by a BLM trigger in P7 (RS1 on TCLA.B6R7) an instability in both planes of B1 was recorded by the BBQ-PM LHC status

4 Sunday 4th November Prepared the machine for the next fill and lost a vertical COD in S12 during rampdown, which could be reset and restarted Had two GPM on B2 probes while correcting the orbit, due to one or several bad BPM readings Before being able to verify the B2-probe orbit the SPS MKE4 switched to local control and the piquet was called to intervene 07:15 beam back in SPS Fun at injection ADT suspect – Daniel Valuch on his way LHC status

5 End fill 3262 LHC status

6 Beam 1 – ghosts & satellites
LHC status

7 Beam 2 – ghosts & satellites
large 5ns satellites LHC status

8 Instability end squeeze (out of interest)
LHC status

9 Instability end squeeze (out of interest)
LHC status

10 Instability end squeeze (out of interest)
LHC status

11 Bunch intensity LHC status

12 Incoming ALFA & TOTEM Injection still ropey – to be re-visited
If we can get a long-ish fill in Injection still ropey – to be re-visited Check ghost and satellite production in SPS LHC status