SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.

Slides:



Advertisements
Similar presentations
Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Acceptance Criteria for the Decay Solenoid Tom Bradshaw Mike Courthold Matthew Hills.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
MICE Spectrometer Solenoids Step IV running
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
K. Long Imperial College London/STFC
Requirements for the Software Group (and agreed actions)
Update on PANDA solenoid design
MICE Hall Summer Workplan
Collaboration Board Report
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Spectrometer Solenoid Fabrication Status and Schedule
How to turn on MICE Step IV
Presentation transcript:

SPOKESMAN’S UPDATE K. Long Imperial College London/STFC

Contents Update Step IV Construct/commission/operate/analyse Papers NuFact15 CM43 2 August

UPDATE Spokesman’s update 2 August

4

5

6

Permission to operate MICE is now operating under: “MICE Operating Instructions 01”: Finally signed-off (i.e. all signatures attached) 22Jul15 Method statements and risk assessments in place 12Jul15 OPI: Defines process by which safety assurance has been given Procedures, responsibilities, sign-off: “Safety Reviews” page on MICEmine MICE procedures for commissioning and operation Sign-off responsibilities for each step in magnet commissioning Update to procedures: Additional access arrangements being made Experience gained in magnet training now being applied Revision to some procedures being discussed This is within “MICE competence”: Revised procedures will be shared with ISIS 2 August

Magnet status Upstream spectrometer solenoid: Issues identified in tests prior to training start Warm-up to rectify: Issues (mis-wiring/insulation) addressed Now in pump-purge cycle Cool-down will begin soon Downstream spectrometer solenoid: Magnet and power supplies made ready for training; Initial training; 5 (of 15) quenches: Most recent 203A Last quench: Power-supply/control issues: Under investigation Requires: Modifications to electrical h/w E.g. lock-out/tag-out, magnet-off buttons Revision of some procedures Focus coil: Magnet cooled down to operating temperature Power supply systems ready to use Thermal issue: Boil-off of LHe too fast Thermal behaviour of cold mass and thermal shield unsatisfactoruy Many investigations Decision to warm up taken: Monitor pressure (vacuum) Gas composition Still need to diagnose cause of behaviour 2 August

Tracker Reconstruction: In good shape: Chris Hunt mentioned in dispatches In MAUS – used for first full processing (see later and DR) Readout: Essentially debugged: Ed Overton mentioned in dispatches! Period to establish stability end August early September: Ed Overton and Paul Rubinov (September) Hardware: outstanding issues: Hall probes in tracker volume: Installed, ready to go but: Not read out, not recorded Essential that this is complete before magnet training restart Leak in diffuser top-hat; requires removal of PRY end-plates A big deal Install gas monitor on exhaust lines; then fill with He gas 2 August

STEP IV Spokesman’s update 2 August

Cycles 2015/01a and 01b Data in the can: Field off data: Large number of events through to TOF2; Sufficient for straight-track alignment Field-on data: One night-shift’s worth with: No field in SSU; 100A in SSD Probably sufficient to work out magnetic axis of SSD Priority: Complete alignment; may need bespoke belows Shift crews: Working well; patience & flexibility; congratulations to all Expert cover: An issue; particularly DAQ and detectors “DOC” 2 August

Processing of data See Durga Rajaram’s talk: First consistent processing of Step IV data done. Excellent! Please use it! We need to know what is good, what is not so good; We all need to be working from the same source! 2 August

PAPERS Spokesman’s update 2 August

2 August EMR paper ready for collaboration; see F. Drielsma Pion contam: up to draft 3 of note (and paper) with wise people Work organised; KL/CR discussing how to expedite preparation Draft in preparation; wise people to be identified by EB Draft at advanced stage: issue in track-fit being debugged Draft assembled! Draft being assembled. Draft under review in the EMR group EMR paper in good shape. Pressure! KL paper catching up. The other papers …

NUFACT 2015 Spokespersons update 2 August

MICE talks at NuFact 2015 Opportunity to promote our experiment Ball dropped on circulation draft talks … Please circulate a draft of your talk for comment: Must be done sufficiently in advance for people to comment 2 August

CM43 Spokespersons update 2 August

2 August