Transpo 2012 Yan Xiao, Mohammed Hadi, Maria Lucia Rojas Lehman Center for Transportation Research Department of Civil and Environmental Engineering Florida.

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

Abstract Travel time based performance measures are widely used for transportation systems and particularly freeways. However, it has become evident that.
Analysis, Characterization and Visualization of Freeway Traffic Data in Los Angeles Alain L. Kornhauser Professor, Operations Research & Financial Engineering.
Project Prioritization - 1 Project Prioritization Using Paramics Microsimulation: A Case Study for the Alameda County Central Freeway Project Presented.
Los Angeles County Metropolitan Transportation Authority Simulating I-710 Corridor Presented in the Western ITE Annual Meeting Santa Barbara, California.
An Optimal Control Model for Traffic Corridor Management Ta-Yin Hu Tung-Yu Wu Department of Transportation and Communication Management Science, National.
Environmental Assessment Public Meeting
Dynamic Traffic Assignment: Integrating Dynameq into Long Range Planning Studies Model City 2011 – Portland, Oregon Richard Walker - Portland Metro Scott.
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
11October 19, 2011 Comparison of Queue Estimation Models at Traffic Signals Jingcheng Wu October 19, 2011 Presented at the 18th World Congress on ITS.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Evaluation of Scottsdale 101 Photo Enforcement Demonstration Program Simon Washington Kangwon Shin Ida van Schalkwyk Department of Civil and Environmental.
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
Coordinated Highways Action Response Team -Performance and Benefits- Dr. Gang-Len Chang Department of Civil Engineering University of Maryland February,
February 9, 2006TransNow Student Conference Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages.
1 Evaluation of Effectiveness of Automated Workzone Information Systems Lianyu Chu CCIT, University of California Berkeley Hee-Kyung Kim, Yonshik Chung,
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
June 16, 2004 Dr. Robert Bertini Michael Rose Evaluation of the “COMET” Incident Response Program Oregon Department of Transportation.
1 Statistics of Freeway Traffic. 2 Overview The Freeway Performance Measurement System (PeMS) Computer Lab Visualization of Traffic Dynamics Visualization.
1 Adaptive Kalman Filter Based Freeway Travel time Estimation Lianyu Chu CCIT, University of California Berkeley Jun-Seok Oh Western Michigan University.
An MPO “Big Data” Application Colorado Springs Metropolitan Planning Area Congestion Management Process 15 th TRB National Transportation Planning Applications.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
Optimal Adaptive Signal Control for Diamond Interchanges Using Dynamic Programming Optimal Adaptive Signal Control for Diamond Interchanges Using Dynamic.
Automatic loading of inputs for Real Time Evacuation Scenario Simulations: evaluation using mesoscopic models Josep M. Aymamí 15th TRB National Transportation.
13 th TRB Transportation Planning Applications Conference May 11, 2011 Risk Assessment & Sensitivity Analysis of Traffic and Revenue Projections for Toll.
An Experimental Procedure for Mid Block-Based Traffic Assignment on Sub-area with Detailed Road Network Tao Ye M.A.Sc Candidate University of Toronto MCRI.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
CREATING THE CASE FOR MORE TRAVEL CHOICES John Bartels, City of Port Phillip and Ainsley Nigro, GHD Cost Benefit Analysis for Implementing Separated Bike.
A Calibration Procedure for Microscopic Traffic Simulation Lianyu Chu, University of California, Irvine Henry Liu, Utah State University Jun-Seok Oh, Western.
Transportation leadership you can trust. presented to Talking Operations Webinar presented by Richard Margiotta Cambridge Systematics, Inc. June 28, 2006.
Evaluating InSync Performance in Microsimulation Aleksandar Stevanovic, PhD, PE Florida Atlantic University Transpo 2012 Bonita Springs, FL October 29,
May 10, 2011 Life-cycle Benefit-Cost Analysis of Alternatives for Accommodating Heavy Truck Traffic in the Las Vegas Roadway Network Dr. Alexander Paz,
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
ITS Sketch Planning Tool Webinar 2:00 – 4:00 PM January 8, 2009.
Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.
Center for Advanced Transportation Education and Research University of Nevada, Reno Presenter: Cui Zhou University of Nevada, Reno Center for Advanced.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Incident Management in Central Arkansas: Current Settings and Proposed Extensions Weihua Xiao Yupo Chan University of Arkansas at Little Rock.
4-1 Model Input Dollar Value  Dollar value of time  Accident costs  Fuel costs  Emission costs.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System TAC Meeting December 13, 2006 Robert Bertini.
Estimating Traffic Flow Rate on Freeways from Probe Vehicle Data and Fundamental Diagram Khairul Anuar (PhD Candidate) Dr. Filmon Habtemichael Dr. Mecit.
Benefit-Cost Analysis of the SMART SunGuide Operations in Fort Lauderdale, Florida June 2006 Steve Corbin District ITS Operations Manager FDOT District.
I-394 MnPASS Technical Evaluation Preliminary Findings March 23, 2006 Doug Sallman – Cambridge Systematics, Inc.
NATMEC June 5, 2006 Comparative Analysis Of Various Travel Time Estimation Algorithms To Ground Truth Data Using Archived Data Christopher M. Monsere Research.
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Ardrey Kell High School February 23, 2012.
Client Name Here - In Title Master Slide Data Requirements to Support Road Pricing Analyses Johanna Zmud, Ph.D. NuStats Partners, LP Expert Forum on Road.
Prediction of Traffic Density for Congestion Analysis under Indian Traffic Conditions Proceedings of the 12th International IEEE Conference on Intelligent.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Georgia’s Regional Traffic Operations Program Christopher Barrow, E.I.T. Traffic Engineer II.
Robert L. Bertini Sirisha M. Kothuri Kristin A. Tufte Portland State University Soyoung Ahn Arizona State University 9th International IEEE Conference.
January 23, 2006Transportation Research Board 85 th Annual Meeting Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems.
Calibrating Model Speeds, Capacities, and Volume Delay Functions Using Local Data SE Florida FSUTMS Users Group Meeting February 6, 2009 Dean Lawrence.
ITS Lab Members  Ph.D Student in Civil Engineering  Areas of Interest  Freeway Management and Operation  Transit Operation  Intelligent Transportation.
DEPARTMENT OF CIVIL & ENVIRONMENTAL ENGINEERING Proactive Optimal Variable Speed Limit Control for Recurrently Congested Freeway Bottlenecks by Xianfeng.
1 Congestion Measurement Mark Hallenbeck TRAC. 2 Historical Use of volume data –AADT –AWDT, –Hourly volumes To estimate delays Can produce a reasonable.
Comparative Analysis of Traffic and Revenue Risks Associated with Priced Facilities 14 th TRB National Transportation Planning Applications Conference.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
1 Update on the Congestion Management Process (CMP) and Related Data Activities Wenjing Pu COG/TPB Staff Travel Management Subcommittee Meeting May 26,
Transpo 2012 Mohammed Hadi, Yan Xiao, Ali Daroodi Lehman Center for Transportation Research Department of Civil and Environmental Engineering Florida International.
Use of the Probability of Breakdown Concept in Ramp Metering Clark Letter Dr. Lily Elefteriadou October 30, 2012 University of Florida Transportation Research.
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
Performance Evaluation of Adaptive Ramp Metering Algorithms in PARAMICS Simulation Lianyu Chu, Henry X. Liu, Will Recker California PATH, UC Irvine H.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System Data Collection Plan / Experimental Design May.
I-270/MD 355 Simulator: An Intelligent Online Traffic Management System Dr. Gang-Len Chang Nan Zou Xiaorong Lai University of Maryland Saed Rahwanji Maryland.
Vermelding onderdeel organisatie February 16, Estimating Acceleration, Fuel Consumption and Emissions from Macroscopic Traffic Flow Data Meng Wang,
Transportation Systems Management and Operations: Technology Solutions and Active Management Presenter Name Date AGENCY LOGO Photo: © Shutterstock.com/iofoto.
Corridor Management Planning in California Jeff X. Ban CCIT, UC-Berkeley Rensselaer Polytechnic Institute (RPI)
Do Mobility-Based Performance Measures Reflect Emissions Trends? Congestion and Emissions Co-performance Alex Bigazzi & Dr. Miguel Figliozzi ITE Western.
Impacts of Reducing Freeway Shockwaves on Fuel Consumption and Emissions Meng Wang, Winnie Daamen, Serge Hoogendoorn, Bart van Arem Department.
Presentation transcript:

Transpo 2012 Yan Xiao, Mohammed Hadi, Maria Lucia Rojas Lehman Center for Transportation Research Department of Civil and Environmental Engineering Florida International University Miami, FL October 30, 2012 Estimation of Diversion Rate during Incidents Based on Mainline Detector Data

Introduction Literature Review Problem Statement Methodology Methodology Validation and Application Conclusions and Future Work 2 Outline

Diversion Rate One of the most important parameters for assessing the impacts and benefits of traveler information system. Diversion rate is needed to assess the impacts on alternative routes, allowing agencies to select better signal control and other traffic management strategies on these routes during incident conditions 3 Introduction

4 Previous Studies Stated Preference Surveys Revealed Preference Surveys Assume Certain Values Diversion Rate Up to 60% - 70% based on SP surveys 27% -50% based on field measurements or RP surveys

5 Problem Statement Rich Intelligent Transportation System (ITS) Data Traffic detector data Incident and construction data Challenge for Estimating Diversion Rate Off-ramp detectors are not installed due to the additional cost involved, preventing the direct measurement of volumes exiting the freeways during incidents. Research Goal Develop and evaluate a method to estimate the diversion rates based on freeway mainline detectors, without requiring measurements from on-ramp and off-ramp detectors.

6 Methodology Incidents Extraction Traffic Volume Estimation Diversion Rate Estimation Detector Data Preprocessing

K-means clustering method 7 Traffic Volume Estimation v j (t i ): time series measurement j at time interval i from detector data c k (t i ): centroid of cluster k at time interval i N k : total number of time series in cluster k

8 Example of Clustering Results Pattern 1Pattern 2 Pattern 3Pattern 4Pattern 5 Pattern 6Pattern 7

9 Diversion Rate Estimation

Incident Recovery Time Estimation Speeds of neighboring detectors around the incident vs their normal day values Traffic Direction Normal Day Incident Day 10 One-lane blockage Incident Location: I95SB Detected at 9/6/2011 2:18 pm Estimated ending time: 3:05 pm

11 Computer Program

12 Methodology Validation IndexDetected Date Number of Lanes Number of Lanes Blocked Incident 12/28/2012 8:45 AM42 Incident 23/26/2012 4:28 PM42 Incident 37/20/2012 3:06 PM41

13 Methodology Application I95 corridor between the Golden Glades Interchange and SR-836 Study time period: 6:00am-7:00pm on weekdays from Jan. 1, 2011 to June 30, 2011 Number of Lanes Number of Lanes Blocked Average Diversion Rate (%) Sample Size

14 Average Diversion Rate Average Diversion Rate vs Lane Blockage Ratio

15 Conclusions and Future Work A new methodology was developed to estimate the diversion rate during the incidents based on mainline traffic detector data. The validity of developed methodology was verified by comparing the estimated values with real-world data. Case study results indicate that the average diversion rate is about 10%-35% for 3-lane and 4-lane roadways depending on number of lanes blocked. A linear relationship between average diversion rate and lane blockage ratio was also developed The impacts of incident attributes, such as incident duration and time of occurrence, and traffic parameters, such as congestion levels on the corridor and alternative routes, will be further investigated.

16 Thank You