Systems Integration EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011 Systems Integration EGN 5623 Enterprise Systems Optimization.

Slides:



Advertisements
Similar presentations
Master Data for SCM (1) Master Data for Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Advertisements

TAC Vista Security. Target  TAC Vista & Security Integration  Key customer groups –Existing TAC Vista users Provide features and hardware for security.
Get Detailed with SAP Expense Planning Wayne Kirkendall Session Code 1610 GB Enterprises.
University of Southern California Enterprise Wide Information Systems Functionality and the Reference Model Instructor: Richard W. Vawter.
Supply Chain Design Problem Tuukka Puranen Postgraduate Seminar in Information Technology Wednesday, March 26, 2009.
Introduction to SAP R/3.
Operate a Logistics Company EGN 5621 Enterprise Systems Collaboration (Professional MSEM ) Fall, 2011.
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Integrated Distribution & Production Planning (DP/PP) EIN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013 Integrated Distribution & Production.
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
Overview of the Database Development Process
IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS LECTURER : NOUF ALMUJALLY 3 – 10 – 2011 College Of Computer Science and Information, Information Systems.
Deployment & Available-to-promise (ATP) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
SAP Overview SAP? Company ERP Software package –R/2 –R/3.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Controlling (CO) SAP University Alliances Authors Bret Wagner
Materials Management (MM) Organizational Structure EGN 5620 Enterprise Systems Configuration Fall, 2015.
1 Material Requirements Planning or as we in the business like to call it - MRP Constrained Lot Sizing.
Rough-Cut Capacity Planning in SCM EIN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization Fall, 2012.
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Detailed Scheduling (DS) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Transportation Planning EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
Integrated Distribution & Production Planning (DP/PP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011 Integrated Distribution &
Transportation Planning EGN 5623 Enterprise Systems Optimization Fall, 2013.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Systems Integration EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012 Systems Integration EGN 5623 Enterprise Systems Optimization.
Assets Management Concepts & Theories
Integrated Distribution & Production Planning (DP/PP) EIN 5346 Logistics Engineering Fall, 2015 Integrated Distribution & Production Planning (DP/PP) EIN.
Rough-Cut Capacity Planning in SCM EIN 5346 Logistics Engineering Fall, 2015.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
Transportation Planning EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Systems Integration EGN 5623 Enterprise Systems Optimization Fall, 2013 Systems Integration EGN 5623 Enterprise Systems Optimization Fall, 2013.
Rough-Cut Capacity Planning in SCM Theories & Concepts
Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA USA :
Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA USA :
SAP SUPPLY CHAIN MANAGEMENT(SCM) ONLINE TRAINING.
Materials Management (MM) Organizational Structure EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2013.
WM Organizational Structure, Master Data, Process Management and Control, and Physical Inventory SAP Implementation.
Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA USA :
APO Technical Workshop for LG Chemical Based on APO 3.10.
Sap Apo Online Training And Certification Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA.
www. magnifictraining.com Online | classroom| Corporate Training | certifications | placements| support Online | classroom| Corporate.
YPO - Optimization-Based Supply Network Planning
SAP Overview.
ERP & APO Integration Theories & Concepts
Schlenker, H. , R. Kluge, and J. Koehl
Rough-Cut Capacity Planning in SCM Theories & Concepts
SAP University Alliances
1 Overview 8 Backup&Recovery 2 Software Maintenance 9 Optimizer 3
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
ERP & APO Integration Theories & Concepts EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Deployment & Available-to-promise (ATP) in SCM Theories & Concepts
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning Theories & Concepts EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Enterprise Systems Optimization Spring, 2012
Integrated Distribution & Production Planning (DP/PP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Integrated Distribution & Production Planning (DP/PP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning EGN Enterprise Systems Optimization Fall, 2012
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization Fall, 2012.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering Fall, 2015.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering Fall, 2015.
Presentation transcript:

Systems Integration EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011 Systems Integration EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011

ERP & APO Integration Theories & Concepts EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011 ERP & APO Integration Theories & Concepts EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011

Outline of ERP & APO Integration 1.Core interface (CIF) CIF Overview CIF Configuration 2.Integration models for data transfer Object and data transfer Initial and delta transfer 3.Master data integration 4.Transactional data integration

Integration of ERP & APO via CIF (Review) Alternative Scenario Base Scenario

CIF Overview Core interface (CIF) is the central interface that connects SAP SCM to the existing SAP ECC system environment. Data transfer between the ECC and SCM systems is defined and controlled using the Core Interface (CIF). CIF is an integrated part of the ERP system (in SAP ECC 6.0) and also is an integrated part of SAP APO, 5.0.

CIF Overview CIF enables transferring master data from SAP ERP to SAP APO in one way only, and transferring transactional data in both ways between ERP and APO In the Core Interface, the user selects the objects to be transferred to SCM via the “integration models.” Only the planning-required parameters are transferred from the SAP ECC dataset to SAP SCM. Technically, the transfer is performed via the queued remote function calls (qRFC).

Core Interface (CIF) (Review)

APO Core Interface Data transfer between the ECC and SCM systems is defined and controlled using the APO Core Interface (CIF). CIF is the central interface that connects SAP SCM to the existing SAP ECC system environment. It is available to the ECC systems through a plug-in. In the APO Core Interface you select the objects that you want to transfer to SCM via “integration models.”

APO Core Interface Only the planning-relevant parameters from the complex dataset of SAP ECC are transferred to SAP SCM. The APO Core Interface is used for both initial data transfer (initial transfer) and change transfer (transfer of data changes) to SCM.

Master Data (review) The relevant master data for production planning: Location Product Resources PPM and PDS Quota arrangement, Set up Group & matrix, and Interchangeability group. Resource views: SNP and PP/DS require a different view of the capacity. SNP – in time buckets PP/DS – time-continuous capacity

Master Data Object

Master Data Transferring

Transactional Data for Transferring

CIF Configuration The communication between ERP and APO systems is based on queued remote function calls (qRFC). To enable this communication, the user needs to configure the “Application Link Enabling” (ALE) settings and the parameters for communication (see Figure 25.1) The user needs to define the logical systems for both ERP and APO systems

CIF Configuration

In the ERP system, the APO logical system has to be defined as the target system by assigning the system type and release with transaction code NDV2 and the queue type with the transaction code CFC1. The remote function calls (RFC) destination defines the address of the target system and the access data (user for the target system, password). The RFC destination has to have the same name as the logical system of the target system and that the name is case sensitive.

Integration Models for Data Transfer The integration model is used to specify selection criteria for master data objects and the logical name of the target (APO) system. The same integration model can be used to transfer more than one type of object but it is a good practice to use multiple integration models (one per object type) to avoid complex maintenance of the selection criteria. When ERP sends orders to APO, the integration models check whether the active integration model exists. Integration models are created (T-code CFM1) and activated (T-code CFM2) on the ERP side.

Objects of Integration Models Two types of objects: Material dependent o such as orders Material independent o such as resources and suppliers. Table 25.2 lists some of objects that can be included into integration models and transferred to APO.

Objects for Integration Models

Master Data Objects in SAP APO and SAP ERP (review)

Objects of Integration Models While creating the integration model, the objects which match the selection criteria, are read in and assigned to the model. The integration model is unique in its name, the target system, the application, and its version. The user can freely name the integration model and denotes its application. The target system is selected from the APO system that is defined in the CIF configuration.

Objects of Integration Model A new version is generated for the integration model, each time when the user modifies it. The user and the date of generation are part of the version name. The transfer of objects is sequence-dependent. For example, plants must be transferred prior to the transfer of work center. The transfer of data is triggered by activating the model with the transaction code, CFM2.

Decision for Object Transfer

Initial and Delta Transfer Initial transfer During the initial transfer, CIF (the currently active version) transfers all objects to APO. Delta transfer If the new version is activated (while the older ones still remain active), CIF transfers only new objects (i.e., the objects that are not included in the old version). Usually a periodical delta transfer is used for data integration, to reduce the system load.

Initial and Delta Data Transfer

Master Data Integration Master data is usually one of the most crucial factors for the success of an implementation. Master data in ERP have to have a sufficient quality. Master data must be kept consistent between ERP and APO, otherwise planning will be inaccurate and lead to wrong results. Generally strongly recommend to maintain master data in ERP environment.

Master Data Integration The master data objects in SAP SCM are not identical to those in SAP ERP. During master data transfer, the relevant SAP ERP master data is mapped to the corresponding SAP SCM master data. The SAP ERP system is the owner of most of the master data. Only specific SCM master data (such as transport lanes) that does not exist in SAP ERP is maintained in SAP SCM.

Master Data Transfer Strategies

Transactional Data Integration The transfer of transactional data is working two ways, from ERP to APO and from APO to ERP. From ERP to APO, there is usually one initial upload and from then onward a continuous online transfer of data changes. From APO to ERP, the default setting for the transfer is “immediately’ for PP/DS order and “periodically” for SNP orders.

Dependencies for sequencing Integration Models

Systems Integration SAP Implementation EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011 Systems Integration SAP Implementation EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011

Transactions for System Connection

Create Integration Model in ERP

Activate/Deactivate Integration Model in ERP

Confirm Data Transfer in APO

Transactions and Reports for Data Transfer from ERP to APO

Exercises: HW 6: Module 10: Supply Network Planning (SNP) - (Section 3) 10.1 Supply Chain Modeling Supply Chain Master Data in Supply Chain APO Core Interface (CIF) Active Model and Version Supply Chain Engineer 10.2 Global Bike Company Supply Chain 10.3 Transactional Data used in Supply Chain 10.4 Planning Table 10.5 Supply Network Planning Heuristic SNP Heuristic Interactive SNP Planning Selection Profile Review Forecast Values for Production Planning at Plant level

Additional HW: 1. Use Graphic method to solve LP a problem 1) Draw a graph 2) Plot the constraint function 3) Outline the feasible solution 4) Circle the optimal solution point. 2. Solve a transportation LP problem 1) Define the objective. 2) Define the decision variables. 3) Write the mathematical function for the objective. 4) Write the constraints. 5) Solve the LP problem (for extra credit).