1 APO Technical Workshop for LG Chemical Based on APO 3.10

2 LG Chemical : APO Overview 2 7777 liveCache 2222 3333 4444 5555 6666 Software Maintenance Sizing&Platform Interface APO&BW CIF 1111 Overview 9999 10 11 Optimizer Performance Others 8888 Backup&Recovery

3 LG Chemical : APO Overview 3 History of Resource Planning Systems: APS  Advanced Planning and Scheduling (APS) system features:  Separate system  Own data pool  Pros:  Optimized data structures  Main memory based planning models  Cons (through dependency on ERP):  Two systems, two data pools  Data must be downloaded and uploaded by batches  Data integrity difficulties through disintegration  Never the current status

4 LG Chemical : APO Overview 4 SAP APO System  APO is SAP’s APS solution  Based on SAP Basis System and mySAP BW  Powerful memory-resident analytical engine  Specialized and configurable data objects  Open interface to both SAP and non-SAP systems  Modules  Demand Planning (DP)  Supply Network Planning (SNP)  Production Planning and Detailed Scheduling (PP/DS)  Global Available To Promise (GATP)  Transportation Planning and Vehicle Scheduling (TP/VS)  Collaborative Planning (CP)  Network Design (ND)

5 LG Chemical : APO Overview 5 Application and Basis Components of SAP APO

6 LG Chemical : APO Overview 6 APO Planning Horizon Supply Network Planning (1-6 month) Demand Planning (6-24 month) Production Planning (4-8 weeks) Detailed Production Scheduling (1 week) Deployment (1 day) Planning horizon

7 LG Chemical : APO Overview 7 Example: Production Planning in APO (DP) SAP APOSAP OLTP System Sales Information System (SIS) Perform Material Requirements Planning (MRP) Manufacturing / Purchasing Demand Planning Data Load into APO Data Mart Execute Consensus Meeting Release to OLTP or SNP * Alternative steps, capacity constraint-based planning Confirmation of Final Forecast SAP BW Collaboration Partner Forecast / Promotion Data Collection/ Distribution Legacy / Flat File Extract Data Update Info cubes SNP * Constrained Demand Plan Forecast Accuracy Reporting Execute Forecast Run Execute Promotion Planning Determine Realignment Procedures

8 LG Chemical : APO Overview 8 APO System: Scalable Architecture Database Presentation Client Browser Dedicated HW/SW system for liveCache Low impact on OLTP performance Specialized and optimized solutions SAP APO APO Application App. Server Database Database Server APO Application BW Layer APO DB Optimizer SAP OLTP ITS SAP OLTP Web server

9 LG Chemical : APO Overview 9 APO Components APO 3.1 SAP APO 3.1 SAP BW 2.1C SAP BASIS 4.6D SAP Kernel 4.6D APO 3.0 SAP APO 3.0 SAP BW 2.0B SAP BASIS 4.6C SAP Kernel 4.6D 7.2.x 7.4.x APO 3.0 : >= PI 2001.2 patch level 4, >= SAPGui 6.10 APO 3.1 : >= PI 2002.1 patch level 4, >= SAPGui 6.20

10 LG Chemical : APO Overview 10 Data Distribution App Server Database Database Server Optimizer APO Application SAP OLTP Database APO APO-CIF All Master Data (all Fields, R/3 Key) All Transactional Data (all Fields, R/3 Key) All Planning-Relevant Master Data (Plan.-rel. R/3 & APO Fields without Texts, GUID) All Planning-Relevant Transactional Data (Plan.-rel. R/3 & APO Fields, GUID) APO DB All Planning-Relevant Master Data (all Fields, GUID) All Planning-Relevant Transactional Data (Texts, GUID) Mapping of Master and Transactional Data in Anchor Tables (R/3 Key  GUID)

11 LG Chemical : APO Overview 11 Performance Benefits of liveCache  Avoids/reduces disk I/O:  Data is kept in main memory, all operations run in memory so large data cache necessary  Disk based logging need not be used  Reduces dataflow between application and data management:  Application logic runs where the data is, avoiding network load  Reduces runtime of operations on data:  Application logic operates with COM routines on object data faster than SQL commands on relational data

12 LG Chemical : APO Overview 12 Client Concept with APO 3.10  APO 3.10 is Client-Specific with Condition  Current Restrictions  BW InfoCubes generate coding (client-independent) –InfoCubes can only be used within one single client, which is determined through the first call of a BW-dependent application –It is not possible to change the productive client at a later stage  All APO applications using BW InfoCubes are client-independent –Demand and Supply Planning (planning area) –Product allocation check (global ATP), if using BW InfoCubes –Collaborative Demand and Supply Planning –Network Design if data supply through BW InfoCube  InfoCube-dependent applications such as DP and/or SNP are restricted to one client!  Exception  SAP BW 2.x / SAP APO 3.x : Working in several Clients (note.384057)  SAP BW 3.0 within SAP SCM 4.0 : Working in several Clients (note.522569)  Too many considerations !!!