Dipole review, 20-21 January 2011 1 Dipole design review: outlines of talks Gijs de Rijk, Francois Kircher and Jean- Michel Rifflet.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
F. Savary. FSY - ColUSM #51 – Outline Mandate of the review panel Composition of review panel Programme Main outcomes/recommendations Actions.
EuCARD’13, Progress--HFM, 11 th June 2013, GdR 1 Progress in EuCARD and plans for EuCARD2 Gijs de Rijk 11 th June 2013 CERN.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
HFM High Field Model, EuCARD WP7 meeting, 18/03/2010, Pierre Manil, 1/20 EuCARD-WP7-HFM MPWG Bending Test Pierre MANIL CEA/iRFU/SIS March 18, 2010 at Wroclaw.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
F. Savary. Click here to add footer 2 Outline Context Constraints & Boundary conditions Project plan Production strategy A few words on QA Conclusions.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
HFM High Field Model, EuCARD WP7 review, 20/1/2011, Philippe Fazilleau, 1/16 EuCARD-WP7-HFM Dipole Conceptual Review Nb 3 Sn dipole protection Philippe.
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
HFM High Field Magnet, Engineering Design, 20/01/2011, Pierre Manil, 1/24 EuCARD-WP7-HFM ESAC Review of the dipole design Engineering Design Pierre MANIL.
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
CERN Accelerator School Superconductivity for Accelerators Case study 3 Paolo Ferracin ( ) European Organization for Nuclear Research.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
FRESCA II dipole review, 28/ 03/2012, Ph. Fazilleau, M. Durante, 1/19 FRESCA II Dipole review March 28 th, CERN Magnet protection Protection studies.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
CEA DSM Irfu - J-M Rey - EUCARD WP 7 Meeting - GRENOBLE 22/03/ HTS insert preliminary design and solenoid prototypes Mélanie Bruchon, Sandrine Cazaux,
Fresca2 Technical meeting, 9 th june 2015, Gdr, relevance for FCC 1 Relevance of SMC/RMC/Fresca2/Inserts for FCC Gijs de Rijk 9 th June 2015 CEA Saclay.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
HFM High Field Magnets, Search on documentation, 29/09/2009, Pierre Manil, 1/6 HFM Search on documentation related to the project Pierre MANIL CEA/iRFU/SIS.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
TABLE IV Stress Evolution in the External Tube for Je = 250 A/mm²
Closing Session Report
CERN, 11th November 2011 Hi-lumi meeting
Responses to the recommendations of the first ESAC dipole review
HL-LHC Magnet components and assemblies
Lucio Rossi (CERN) WP10 coordinator
The R&D programme on High Field Magnets (HFM)
CSP 25th November 2010 Technical agreement number 3: overview
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
ESAC Review February 2013 CEA Saclay
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CERN-INFN, 23 Febbraio 2017 Stato del programma 16 T Davide Tommasini.
Status report on MQYY (Q4)
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Mechanical Modelling of the PSI CD1 Dipole
FRESCA2 Update on the dipole design and new calculations
To be presented at Nb3Al R&D Review,
Insert - dipole common issues
SMC Design overview of the construction and project issues
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
EuCARD2 WP 10.2 HTS Conductor
HIGH LUMINOSITY LHC: MAGNETS
Presentation transcript:

Dipole review, January Dipole design review: outlines of talks Gijs de Rijk, Francois Kircher and Jean- Michel Rifflet

Dipole review, January 2011 Dipole design review Date: January 2011 Place: CEA Reviewers: –Giorgio Ambrosio (FNAL) –Lucio Rossi (CERN) –Shlomo Caspi (LBNL) –Akira Yamamoto & Tatsu Nakamoto (KEK) –Yuki Iwasa (MIT) –Pasquale Fabbricatore (INFN Genova) 2

Dipole review, January 2011 Draft agenda (day 1) Introduction 9h00I-1) EuCARD-HFM and its context. (GdR) 15’+5’ II) Technical part 9h20II-1) Overview of the dipole (J-M Rifflet) 15’+10’ 9h45II-2) Conductor choice, properties and procurement strategy (L. Oberli) 20’+10’ 10h15Coffee break 15’ 10h30II-3) Conceptual design (A. Milanese) 30’+10’ 11h10II-4) Engineering design (P. Manil) 30’+10’ 11h50II-5) Quench protection (P. Fazilleau) 15’+10’ 12h15Lunch break 1h45’ 14h00II-6) SMC as preparatory project (J-C. Perez) 20’+10' 14h30II-7) Fabrication process study (M. Durante) 30’+10’ 15h10II-8) Winding and tooling tests and insulation choice (F. Rondeaux) 20’+10’ Coffee break 15’ 15h55II-9) Cooling, heat transfer and cool-down issues (S. Pietrowicz ) 20’+10’ 16h25II-10) Insert interfacing (M. Devaux) 10' + 10’ III) Scheduling and project management 16h55III-1) Magnet design and construction schedule (GdR) 20' + 10' 3

Dipole review, January 2011 I-1) EuCARD-HFM and its context. (GdR) 15’+5’ EuCARD 11 WPs NED heritage HFM: 6 tasks Task 3 dipole, the need for a Fresca (existant 10 T + HF) cable test facility, prospecting for future accelerator magnets and HFM technologies Task 3 EuCard (only) specification for the dipole Task 3, budget situation and explication of budget links Work division between the partners 4

Dipole review, January 2011 II-1) Overview of the dipole (J-M Rifflet) 15’+5’ The specification (boundaries) Size considerations: coil, yoke (scaling laws) Conductor choice –NED heritage –1 mm strand in 40 strand cable choice –Maximize current to minimize L (reference to Luc, Philippe) History of the design Basic block coil (Picture 2D baseline) Shell bladder and key, basic reasons for this 5

Dipole review, January 2011 II-2) Conductor choice, properties and procurement strategy (L. Oberli) 20’+10’ 1 mm strand (detailed explanation) –Compromise between 1.25 mm and 0.8 mm –Cable size: 40 strands, reasons Available providers, history of strand development Procurement strategy Cable design parameters and cabling tests Prototype strands: first results Prototype cable: first results ( sample length ) Comparison with models Jc used for the design (plot) 6

Dipole review, January 2011 II-3) Conceptual design (A. Milanese) 30’+10’ Magnetic design (parameters, plots) –2D (some optimisation reasons, mid plane etc) –3D (max field etc) Mechanical design - Présentation générale de la structure mécanique - Design mécanique global 2D o dimensioning of components o quelques courbes de suivi de certains indicateurs, Option without tube (20 Febr.) Life cycle construction and powering Modèle de calcul mécanique 3D Global structure 7

Dipole review, January 2011 II-4) Engineering design (P. Manil) 30’+10’ Géométrie de la bobine : –Bending test –Saut de couche –Etude géométrique –Longueur de câble Présentation de la structure –Points critiques : support des têtes, bladders… Detailed engineering –Usinabilité / choix des matériaux : tube, tolérances, surfaces complexes… 8

Dipole review, January 2011 II-5) Quench protection (P. Fazilleau) 15’+10’ Only a feasibility study not yet design decisions Quench development, current decay, T max, T av, V max Circuit parameters : dump resistor Quench heaters : needed ?, test usage Quench behaviour at 1 T, 5 T, 10 T and 13 T Gradients T during quench (for later mechanical modeling) Parameter space 9

Dipole review, January 2011 II-6) SMC as preparatory project (J-C. Perez) 20’+10' Aim of the SMC series SMC description SMC program (table with magnets / coils, dates, 7 coils ) SMC1 test results Lessons learned up to now SMC3 progress Future work (SMC4 40st) and aims 10

Dipole review, January 2011 II-7) Fabrication process study (M. Durante) 30' + 10’ Question: which tooling is needed and what are the critical issues ? Insulating Winding Mould mounting Reaction Preparation for impregnation –Island manipulations –Splicing –Instrumentation sheets –Ground insulation Moulding Mounting the structure Coil pack mounting Bladder and key operations 11

Dipole review, January 2011 II-8) Winding and tooling tests and insulation choice (F. Rondeaux) 20' + 10’ First winding feasibility test April 2010 Winding tests foreseen Reaction mould design and tests Insulation schemes available Insulation scheme choice process Moulding material and tests 12

Dipole review, January 2011 II-9) Cooling, heat transfer and cool-down issues (S. Pietrowicz ) 20' + 10’ Temperature and heat model of the magnet Steady state heat deposition at 4.2 K Steady state heat deposition at 1.9 K Cooldown scenario Stresses in the magnet during cooldown 13

Dipole review, January 2011 II-10) Insert interfacing (M. Devaux) 10' + 5’ Insert layout Insert mounting Field with insert Quench of insert Quench of dipole Risk scenarios 14

Dipole review, January 2011 III-1) Magnet design and construction schedule (GdR) 20' + 10’ Task breakdown Design and construction flowchart with decision points Design and construction schedule (incl SMC4) Potential bottlenecks 15