NETWORK BASED PLANNING METHODS. Planning, What is it? A common mistake: Not involving in the planning process the people who must do the work.

Slides:



Advertisements
Similar presentations
Precedence Diagramming
Advertisements

Chapter 17 Project Management McGraw-Hill/Irwin
Developing the Project Plan
Project Management Project Management
Scheduling CTC-470.
X- FUNDAMENTAL SCHEDULING PROJESS
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
Developing a Project Plan
Advanced Project Management - CPH
Network Analysis and Duration Estimating Kathy S. Schwaig.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
إدارة المشروعات Projects Management
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
Management & Development of Complex Projects Course Code - 706
Dr. Hany Abd Elshakour 5/4/2015 3:55 PM 1. Dr. Hany Abd Elshakour 5/4/2015 3:55 PM 2 Time Planning and Control Activity on Node Network and Precedence.
AMERICAN SPORTS BUILDERS ASSOCIATION CRITICAL PATH METHOD SCHEDULING FOR SUCCESS December 6-8, 2008 New Orleans, Louisiana Presented By: Bill Pronevitch.
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Project Time Management
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
Time Planning and Con trol Precedence Diagram.  Precedence Diagramming  An important extension to the original activity-on-node concept appeared around.
Network Scheduling : Precedence Diagram Method
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Abeer Bin Humaid. Project management is “the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements”
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
Edward B. Farkas, Managing Director, Project Management Practice
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
MS project Abeer Bin Humaid. What is project management? Project management is “the application of knowledge, skills, tools, and techniques to project.
© Construction Management Association of America. Do Not Duplicate or Reproduce. Standards of Practice Course CPM Scheduling Lab.
Title of presentation goes here Name of presenter Location/date © 2005 MPA. All rights reserved. Task Management in MS Project Genea Mallow-Jensen President,
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services.
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Advanced Project Management Project Time Management Ghazala Amin.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Project Management Fundamentals - Planning Tools 1.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Network planning models These project scheduling techniques model the project's activities and their relationships as a network. In the network, time flows.
Project Management: PERT/CPM
CHAPTER 6 PROJECT TIME MANAGEMENT
Time Planning and Control Precedence Diagram
Project Time Management
Project Time Management
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
Project Time Management
Project Time Management
Project Time Management
Time Planning and Control Precedence Diagram
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

NETWORK BASED PLANNING METHODS

Planning, What is it? A common mistake: Not involving in the planning process the people who must do the work

The Lewis Method Project Management

Step 6 of The Lewis Method

The Methods Project planning consists of developing a schedule and a budget for the execution of the project. Among the most popular methods are Critical Path Method (CPM) and Precedence Diagramming Method (PDM)

Work Breakdown Structure In order to successfully planning and controlling a project, it has to be structured by decomposing it into manageable sub- activities of reasonable size and complexity which can be accomplished separately. For each sub-activities, a specification describing its objectives has to be provided. It has to be characterized of its duration, cost, and work content.

Having done with the decomposition process, the sub-activities and jobs determined can be arranged in a form of a tree with its root node corresponding to the complete project. The major sub-activities are depicted on the first level. On subsequent levels, each of them are decomposed again. The leafs of the tree correspond to the identified jobs. The resultant figure is called work-breakdown structure. Work Breakdown Structure …

A function-oriented approach: a sub- activity is divided according to the development or organizational function. A product-oriented approach: a sub-activity is broken into smaller ones referring to the technological structure of the product. A process-oriented approach: a sub-activity is decomposed according to its processing. Method for Decomposing a Project

A statement of work: defines the objective which has to be achieved by performing the job. To judge its successful completion, performance measures have to be established. The amount of labor, equipment, and materials required for executing the job have to be determined. Then, the expected duration of the job can be estimated. A budget for executing the job can be developed. Project’s Work Content

WBS, An Example The Project Function-oriented Process-oriented Product- oriented Bicycle Project Deliverable

Jobs or activities have to be processed in order such that precedence relationships among pair of jobs/activities are satisfied. Technological precedence: due to technological dependencies. Procedural precedence: due to guidelines defining how certain jobs have to be performed. Imposed precedence: due to restricted resource or budget availability. Activity-on-Node Networks

A finish-to-start precedence relationship is the most commonly used. AoN Networks…

It introduces a minimum time lag between jobs. A finish-to-start time lag, L ij FS, between job i and j indicates that at least L ij FS periods have to pass away after finishing job i before job j can start. A start-to-start relationship between job i and j with a time lag L ij SS indicates that job j cannot start before the processing of job i has been executed for at least L ij SS periods. Precedence Diagramming Method

A finish-to-finish relationship with a time lag of L ij FF indicates that job j cannot be finished until at least L ij FF periods have passed away after completing job i. A start-to-finish relationship with a time lag of L ij SF indicates that there must be at least L ij SF periods between the start of job i and the finish of job j. PDM …

Activity-on-Arch Networks

To determine the smallest possible project completion time which can be realized without violating the precedence constraints imposed by the project network. It computes earliest and latest starting and finishing times. It defines a time window for each job: –[ES j, LF j ] is the time window interval for job j. Critical Path Analysis

The Formulas

Other Method