Cascina, Nov. 4 th, 2008 AdV review 1 AdV Injection system E. Genin European Gravitational Observatory.

Slides:



Advertisements
Similar presentations
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Advertisements

Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
CNMFrascati 12/01/061 High Power Laser System for Advanced Virgo C.N.Man Design goals Present technology Other activities in the world Virgo+ and Laser.
High Power Input Optics for Advanced Virgo Julien Marque, Benjamin Canuel, Richard Day, Eric Génin, Flavio Nocera, Federico Paoletti The European Gravitational.
Optical simulation – March 04 1 Optical Simulation François BONDU VIRGO Tools Goals Example: tuning of modulation frequency A few questions.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Measurement of the laser beam profile at PSL to Mode Cleaner interface for the 40 Meter Prototype Interferometer A table of contents 1. Introduction 1.1.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
Thermally Deformable Mirrors: a new Adaptive Optics scheme for Advanced Gravitational Wave Interferometers Marie Kasprzack Laboratoire de l’Accélérateur.
Stefan Hild, Andreas Freise, Simon Chelkowski University of Birmingham Roland Schilling, Jerome Degallaix AEI Hannover Maddalena Mantovani EGO, Cascina.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
GWADW 2010 in Kyoto, May 19, Development for Observation and Reduction of Radiation Pressure Noise T. Mori, S. Ballmer, K. Agatsuma, S. Sakata,
G D Initial LIGO improvements & Advanced LIGO P Fritschel PAC Meeting LLO, 18 May 2005.
Status of the advanced LIGO laser O. Puncken, L. Winkelmann, C. Veltkamp, B. Schulz, S. Wagner, P. Weßels, M. Frede, D. Kracht.
Plans for Advanced Virgo
ILIAS WG1 meeting, 19/06/07 IB Faraday Isolator 1 IB in vacuum Faraday isolator E. Genin, S. Hebri, S. Hamdani, P. La Penna, J. Marque EGO.
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
1 1.ISC scope and activities 2.Initial Virgo status 3.Design requirements 4.Reference solution and design status 5.Plans toward completion 6.Technical.
LIGO-G Advanced LIGO Detector upgrade is planned for »Factor of 10 increase in distance probed (‘reach’) »Factor of 1000 increase in event.
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
LIGO-G D Enhanced LIGO Kate Dooley University of Florida On behalf of the LIGO Scientific Collaboration SESAPS Nov. 1, 2008.
Paolo La Penna The New Virgo Injection BenchN5-WP1 4 TH MEETING, Hannover, 7/04/2005 The New VIRGO Injection Bench Paolo La Penna European Gravitational.
European Gravitational Observatory12/12/2005 WG1 Hannover 1 Mode Matching of the Fabry-Perrot cavities Julien Marque.
G Z LIGO R&D1 Input Optics Definition, Function The input optics (IO) conditions light from the pre- stabilized laser (PSL) for injection into.
DFG-NSF Astrophysics Workshop Jun 2007 G Z 1 Optics for Interferometers for Ground-based Detectors David Reitze Physics Department University.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
LIGO-G Z Guido Mueller University of Florida For the LIGO Scientific Collaboration ESF Exploratory Workshop Perugia, Italy September 21 st –23.
January 12, 2006ILIAS-WG3 Frascati1 Virgo+ & Advanced Virgo B. Mours With material from G. Losurdo, M. Punturo, A. Viceré and others.
Flat-Top Beam Profile Cavity Prototype
LSC August G Z Gingin High Optical Power Test Facility (AIGO) 1 High Optical Power Test Facility - Status First lock, auto-alignment and.
Pre-stabilized laser (PSL) for AdV Scope of the system Main tasks Requirements Reference solution and status of the design Plans towards completion Technical.
Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z.
1 1.Definition 2.Deliverables 3.Status of preliminary design 4.Risks 5.Tasks to be done 6.Decisions to be taken 7.Required simulations 8.Planning ISC workshop:
LIGO-G0200XX-00-M LIGO Scientific Collaboration1 eLIGO Input Optics Characterization and Performance Kate Dooley University of Florida.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
1st Advanced Virgo Review – November 3-4, 2008 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Substrates.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
Status of the Advanced LIGO PSL development LSC meeting, Baton Rouge March 2007 G Z Benno Willke for the PSL team.
LIGO-G M LIGO R&D1 Initial LIGO upgrade to 30 W: Implication for the Input Optics UFLIGO Group.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
AdV Thermal Compensation System Viviana Fafone AdV/aLIGO joint technical meeting, February 4, 2004.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
THE INPUT OPTICS OF ENHANCED AND ADVANCED LIGO D.B. Tanner, M.A. Arain, A. Lucianetti, R.M. Martin, V. Quetschke, L.F. Williams, Wan Wu, G. Mueller, and.
LSC meeting, 25/05/07 Thermal lensing simulation 1 Faraday thermal lensing numerical simulations Slim Hamdani EGO LIGO-G Z.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
Alessio Rocchi INFN Roma Tor Vergata Thermal Compensation System for Virgo+
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
The VIRGO detection system
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
High power fibered optical components for gravitational waves detector Matthieu Gosselin, PhD Student at EGO ELiTES : 3 rd general meeting February 10.
LIGO-G d April 24, 2007 Auxiliary Optics System (AOS) Technical Breakout Presentation NSF Review of Advanced LIGO Project Mike Smith, Phil Willems.
INJ ASPERA Technology Forum 21/10/ High power optics for the AdV INJ system Benjamin Canuel European Gravitational Observatory.
Advanced Virgo INJ: Faraday isolator, Electro-optical modulator, high power beam dump and Input mode-cleaner E. Genin for AdV INJ team European Gravitational.
Evolution of the Virgo detector: The Virgo+ plans
Design of Stable Power-Recycling Cavities
Virgo – Injection SYStem
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
Flat-Top Beam Profile Cavity Prototype: design and preliminary tests
Heavy IMC end payload requirements
Flat-Top Beam Profile Cavity Prototype
Presentation transcript:

Cascina, Nov. 4 th, 2008 AdV review 1 AdV Injection system E. Genin European Gravitational Observatory

Cascina, Nov. 4 th, 2008 AdV review 2 Scope of INJ subsystem ● The Injection system (INJ) of AdV takes care of the optics downstream of the high power laser, and of the interface of these optics with the laser and the ITF. ● The whole system must deliver : a laser beam at the ITF input port with the required power and size. a good quality beam (filtered by IMC cavity). frequency and angular stability sufficient to reach AdV sensitivity goal. ● It should provide : an EOM system able to modulate the laser beam in phase and amplitude (for ITF longitudinal and angular control) at the output of the laser. A vacuum compatible Faraday isolator (FI) able to withstand high laser power (up to 250W) and other FIs to be installed in air. Good quality waveplates and polarizers able to withstand high laser power.

Cascina, Nov. 4 th, 2008 AdV review 3 Main tasks ● In order to succeed in the completion of this subsystem, it has been divided into 5 tasks: Optical design of the AdV INJ system : –INJ Requirements: RF modulation, input power, beam jitter, IMC filtering, optical isolation, mode matching, scattering. –Optical design activity : INJ General Optical Layout, IMC cavity (thermal effects and scattering study, angular control), beam pointing control system, Mode-Matching telescopes (MMT),… Input optics components selection and realization: –Faraday isolator (1 vacuum compatible +other FIs for laser and external injection benches). –Electro-optical modulators (for ITF sensing and control purpose). –Polarisers and waveplates. –Optics (low scattering in-air optics selection, Mode-Matching Telescope (MMT) optics selection, New IMC mirrors selection,…). Input mode-cleaner : Mechanical design and realisation. –Design and realization of the mechanical parts related to the IMC on the Suspended Injection Bench (in collaboration with INJ optical and mechanical design groups, SAT and PAY subsystems) and if needed on IMC end mirror suspension. Design and realisation of mechanics needed for INJ subsystem: –In-air and in-vacuum injection benches mechanics : Optical bench selection, Optics mount design, Actuator selection. Design and realisation of electronics needed for INJ subsystem: –Define electronics needed for Advanced Virgo INJ system (sensors, actuators, driving electronics). –Modulation frequency electronics design and realisation.

Cascina, Nov. 4 th, 2008 AdV review 4 Subsystem requirements ● General requirements of the subsystem have been given (using LIGO requirements and our experience in Virgo) ● INJ subsystem team is working on the definition of the requirements for all the systems (Mode cleaner and SIB automatic alignment, Beam pointing control system,…)  a document gathering all these requirements for INJ subsystem is in preparation.

Cascina, Nov. 4 th, 2008 AdV review 5 Reference solution In-air optics: –EOM system for IMC and ITF control –IMC mode-matching telescope. –Power adjustment system (for locking purpose) –Beam pointing control system –Steering optics In-vacuum optics: – –Resonant Input Mode-Cleaner (IMC) – –HP Faraday isolator – –Mode-Matching Telescope (MMT) – –PSL intensity stabilization photodiode – –Reference cavity (RFC) – –Steering optics

Cascina, Nov. 4 th, 2008 AdV review 6 Status of the design : Faraday isolator ● Requirements : Withstand high continuous laser power on long periods (250W). Compensated in term of thermal lensing. Compensated in term of depolarization. Provide a good optical isolation (>40 dB; Impact of under vacuum FI isolation could be checked on Virgo+). Transmission > 95%. ● The solution has already been developped for Advanced LIGO by Institute of Applied Physics (Novgorod, Russia). ● A collaboration with IAP has started to design a Faraday isolator that fulfills AdV requirements and adapted to AdV Suspended Injection Bench. Input beam Rejected beam (ITF reflection)

Cascina, Nov. 4 th, 2008 AdV review 7 Status of the design : Faraday isolator ● High power input optics R&D: Tests on TGG crystal have started. ● The gaussian laser beam is heating the TGG crystal and is responsible for: Thermal lensing. Depolarization. Modification of the faraday rotator polarization rotation angle (due to verdet constant change with temperature). Responsible for lack of FI isolation Responsible for mismatching on optical cavities

Cascina, Nov. 4 th, 2008 AdV review 8 Status of the design : Faraday isolator ● Thermal lensing. 2 TGG crystals that are identical to the one used in Virgo FI tested up to 84 W. Using a code based on a finite element model, we can estimate the crystal absorption (found to be around ppm/cm)  consistent with measurement performed on SIB faraday isolator.

Cascina, Nov. 4 th, 2008 AdV review 9 Status of the design : Faraday isolator ● Measurement of depolarization in a TGG crystal up to 125 W by placing a TGG rod between 2 crossed polarizers.  From 70 W, depolarization γ (in dB) is proportional to P 2 as already shown by Khazanov (Khazanov et al., IEEE Journ. Quant. Electr., Vol. 40, n. 10, (2004)).

Cascina, Nov. 4 th, 2008 AdV review 10 ● Measurement of faraday isolation change in air and in a vacuum tank up to 48 W.  As already seen in Virgo, FI isolation is worse in a vacuum than in air due to different thermal conditions (no convection in vacuum). This can be corrected by inserting a halfwave plate inside the faraday isolator to compensate for this rotation change (at 38 W, we rotated the half waveplate by 0.7° to improve the isolation by 3.5 dB). Status of the design : Faraday isolator

Cascina, Nov. 4 th, 2008 AdV review 11 Status of the design : EOM ● With 10 times more power respect to Virgo, thermal effects will become significant in EOM crystals: We have to choose a material that is less absorbing than KTP currently used in Virgo. RTP crystal seems the most appropriate material (confirmed by Advanced LIGO tests at high power). ● Tests are planed using the High power test facility installed in EGO optics lab. Characterization of several electro-optic crystals that are available in the lab (RTP, MgO doped LiNbO3 and KTP). Plan to buy a KTP crystal that seems promising and has properties close to RTP in term of absorption, damage threshold and EO coefficient. Work on the modulation electronics design will start soon.

Cascina, Nov. 4 th, 2008 AdV review 12 AdV IMC ● Reference solution: 144 m long resonant cavity. ● Next steps : IMC cavity simulation work in order to define all the specifications: Finesse (coming from frequency, amplitude and beam jitter filtering specifications), IMC locking frequency (given by ISC). Coating absorption, flat mirrors substrate absorption. End mirror surface flatness and roughness specifications to lower internal scattering problems. Study the way we hold the flat mirrors (independent suspension, dihedron or 2 mirrors optically contacted).

Cascina, Nov. 4 th, 2008 AdV review 13 AdV Suspended Injection Bench (SIB): preliminary design ● Optical design activity has started  to check that it was possible to integrate the 2 mirrors of the non-degenerate power recycling cavity. ● The main constraint since we are not going to change the tower structure is the SIB bench dimension (tower aperture diameter = 1 m).

Cascina, Nov. 4 th, 2008 AdV review 14 3D views PRM2 North input SIB

Cascina, Nov. 4 th, 2008 AdV review 15 Technical risks ● Pollution of injection tower by actuators, mechanics and optical devices  it could increase thermal effects particularly at the level of IMC flat mirrors and power recycling mirrors (in Virgo+, we are already experiencing this kind of troubles). ● We will have a lot of beam to manage (ITF reflection, PRM 3 transmission for PR cavity control, IMC flat mirrors beam for control, SIB local control system beams)  space constraints on the SIB, not that easy to put everything we want on this bench.

Cascina, Nov. 4 th, 2008 AdV review 16 Plans for the next future ● Big steps towards INJ design completion: (due date : mid 2009) Complete INJ subsystem requirements document (starting point of the design work) : ready for the beginning of IMC: –IMC cavity geometry definition. –Take a decision about the necessity to suspend IMC flat mirrors, keep a dihedron or try to optically contact 2 rectangular flat mirrors. SIB: –How to upgrade SIB suspension? Do we need to add 1 or 2 filters? Decisions have to be taken soon. Complete optical and mechanical layout for INJ system.

Cascina, Nov. 4 th, 2008 AdV review 17 Plans for the next future ● High power input optics R&D: In-vacuum high power compliant faraday isolator : –design ready (beginning of next year) –a prototype should be ready for mid-end EOM : –tests on EO crystals should be done (end of 2008-beginning of 2009). –EOM modulation electronics design should start soon (a critical point is the one concerning sidebands on sidebands generation). Hope to have a first prototype ready by mid 2009.