A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Electrical Tests of HTS Twisted-pair Cables With Helium Gas Cooling Task 5. High Tc superconducting link Partners CERN R&D of HTS twisted pair cables Bruker.
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Superconductivity Practical Days at CERN
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
Superconducting Links for accelerator technology A.Ballarino CERN, TE-MSC-SCD Eucard’13, CERN With contributions from the SCD SL Team (B.Bordini, S.Giannelli),
EuCARD 2012 Collaboration Meeting Warsaw University of Technology 22 th April 2012 WP-7 / Task 4 Very high field magnet Introduction/objectives/partners.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
EuCARD2 Magnet Status and action plan
Status of CEPC Detector magnet
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
WP10.2 – where do we stand ? L. Bottura, C. Senatore Graphics by courtesy of A. Kario, KIT.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Review-LHC Interaction Regions - Upgrade Phase I Amalia Ballarino, 31 st July 2008 Cold Powering Options Conceptual Design Review of the LHC Interaction.
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
19./20. September 2007 Current leads for FAIR Cryogenic Expert Meeting 19./20. September 2007 Birgit Weckenmann.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
FET-OPEN proposal for a HTS fast cycled magnet for Energy Efficiency and Operational Flexibility Motivations SC magnets are the choice of reference to.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 Cold Powering New Baseline A.Ballarino 27/10/2015.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
A. BallarinoEucard MeetingCERN,20/03/2013 High-Tc Superconducting Links for the LHC WP 7 – Task 5 A.Ballarino, TE-MSC, CERN Task 5 participants : A. Ballarino,
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
Henryk Piekarz SC Magnets at Fermilab HTS Cable Test for a Fast-Cycling Accelerator Dipole Magnet E4R Test Goals and Arrangement Review September 10, 2009.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Superconducting Links R2E and Avalilability Workshop
Task 5: High-Tc superconducting link Summary of work-package
HL-LHC IT STRING and Series test of SC link
EuCARD2 WP10.2 main results and open issues
11 T Dipole Integration & Plans M. Karppinen
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
HO Corrector Magnets: decapole test and future plans
HO Corrector Magnets: decapole test and future plans
Lucio Rossi Project Leader
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
EuCARD2 WP 10.2 HTS Conductor
Block 4 and Cluster D - Safety
Superconducting Links and Cold Powering components for HL-LHC
TEST PLANS for HL LHC IT STRING
as a prototype for Super c-tau factory
Optical fiber based sensors for low temperature and superconductors
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration CERN, Bruker, Columbus, University of Southampton LASA,

A. BallarinoLASA, Milano,18/09/2012 Outline Task description Cable concept Progress since last meeting (April 2012): Cabling machines Test station Status of activity vs final deliverable Conclusions

A. BallarinoLASA, Milano,18/09/2012 Task 7.5: High-Tc link Deliverable of Task 5 - as described in the Eucard Grant Agreement: Superconducting link, 20 m long, containing 48 HTS cables rated at 600 A - DC.The Task includes design and assembly activities – but not the test of the final prototype The final application for LHC (P7) consists of two superconducting links, each about 500 m long, with the same configuration of the prototype CERN will test the 20 m long prototype in nominal operating conditions

A. BallarinoLASA, Milano,18/09/2012 Cable concept Elaboration of a cable concept that enables the use of pre-reacted superconductors available in the form of tape: MgB 2, YBCO and BSCCO 2223 The HTS cable design adopted for power transmission lines appeared not to be suitable for this specific application - few tapes and many cables in the same cryogenic envelope

A. BallarinoLASA, Milano,18/09/2012 Three HTS tapes per cable interleaved with copper strips A A 4 mm 1 mm Cable Concept

A. BallarinoLASA, Milano,18/09/2012 Cable/Link Concept (2/2) 24 × 2 × 600 A Multi-cable assembly Link: multi-cable assembly in cryostat  2 kg/m  200 m HTS /m cable

A. BallarinoLASA, Milano,18/09/2012 Prototype twisted-pair cables characterization (CERN and SOTON) Type-5: MgB2 Type-3: Y-123 Type-2: Bi-2223 Type-1: Bi-2223 NB The Ic in the plot refers to one single cable of the twisted pair unit  Measurement performed on twisted-pair cables made from different conductors  No cabling degradation observed (< 2 %)  Good homogeneity of Ic of cables in the same in the same twisted pair (  2 %) Self-field, Length of cables = 2 m 2×4.4 kA !

A. BallarinoLASA, Milano,18/09/2012 Cabling machine (1/2) For the controlled assembly of long cables a dedicated cabling machine has been designed, assembled and fully commissioned at CERN

A. BallarinoLASA, Milano,18/09/2012 Cabling machine (2/2) Rotating machine for the twisting of insulated cables Design and assembly completed. To be commissioned in October 2012.

A. BallarinoLASA, Milano,18/09/2012 Test station

A. BallarinoLASA, Milano,18/09/2012 Test Station – SM 18 CERN laboratory Refrigerator: K (18 kW for test of LHC magnets) LHe Dewar

A. BallarinoLASA, Milano,18/09/2012 Test CERN: Conceptual Design RT Cryostat with current leads Cryostat with superconducting cables

A. BallarinoLASA, Milano,18/09/2012 Test CERN: Conceptual Design RT LHe 4.5 K GHe Tv m ≤ 10 g/s 5 K ≤ Tv ≤ 70 K Vacuum Insulation LHe, 4.5 K GHe Instrumentation DAQ Quench Protection

A. BallarinoLASA, Milano,18/09/2012 Test CERN

A. BallarinoLASA, Milano,18/09/2012 Test CERN

A. BallarinoLASA, Milano,18/09/2012 Test station at CERN  The two cryostats are fully assembled  The cryostat with the leads has been commissioned – pressure and leak tested, cooled-down to nominal conditions, operated at some 3.5 kA and warmed up  The cryostat of the superconducting link was successfully leak tested last week, and it will be pressure tested this week  The connection of the two cryostats is planned to take place this month. A first cool-down, with a 20 m long twisted pair YBCO cable already integrated the in cryostat of the superconducting link, is planned to take place in October 2012

A. BallarinoLASA, Milano,18/09/2012 Status of activity vs final deliverable  The 20 m long semi-flexible cryostat with a supporting system and purpose-built terminations, is available today at CERN  A 20 m long 48 HTS cable assembly can be ready by end 2012 – when also the rotating cabling machine will have been commissioned This two components make the superconducting link which is the deliverable of the Task 7.5 In addition:  By the end of the year, the test station will have been fully commissioned and 20 m long cables will have been tested in He gas in a variable temperature range. The test of a 20 m long prototype will follow

A. BallarinoLASA, Milano,18/09/2012 Is the Task 7.5 on schedule ? Yes Assembly of prototype link: planned to be ready by end 2012.

A. BallarinoLASA, Milano,18/09/2012 Conclusions  A new cable concept has been proposed. Validation of the proposed twisted-pair concept was done with the assembly and characterization of short prototype MgB 2, YBCO and BSCCO 2223 cables  Two cabling machines have been designed and constructed for the controlled cabling of the 20 m long HTS twisted-pair cables  A new test station has been constructed at CERN for the test of the 20 m long prototype link  The task is on schedule – a full prototype is planned to be available by end The test in nominal operating conditions will follow. Single twisted-pair cables, 20 m long, will be measured this year

A. BallarinoLASA, Milano,18/09/2012 Thanks for your attention !