Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Probabilistic Cash Flow Analysis.

Slides:



Advertisements
Similar presentations
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 18-1 Developed.
Advertisements

Chap 8-1 Statistics for Business and Economics, 6e © 2007 Pearson Education, Inc. Chapter 8 Estimation: Single Population Statistics for Business and Economics.
Chapter 5 Discrete Random Variables and Probability Distributions
Contemporary Engineering Economics, 4 th edition, © 2007 Probabilistic Cash Flow Analysis Lecture No. 47 Chapter 12 Contemporary Engineering Economics.
Engineering Economic Analysis Canadian Edition
Lecture Presentation Software to accompany Investment Analysis and Portfolio Management Seventh Edition by Frank K. Reilly & Keith C. Brown Chapter.
Chapter 4 Discrete Random Variables and Probability Distributions
Chapter 8 Estimation: Additional Topics
(c) 2001 Contemporary Engineering Economics 1 Chapter 14 Project Risk and Uncertainty Origin of Project Risk Methods of Describing Project Risk Probability.
(c) 2001 Contemporary Engineering Economics 1 Chapter 14 Project Risk and Uncertainty Origin of Project Risk Methods of Describing Project Risk.
Flash back before we compare mutually exclusive alternatives.
(c) 2001 Contemporary Engineering Economics 1 Decision Tree Analysis A graphical tool for describing (1) the actions available to the decision-maker, (2)
Engineering Economics in Canada
AN INTRODUCTION TO PORTFOLIO MANAGEMENT
Contemporary Engineering Economics, 4 th edition, © 2007 Methods of Describing Project Risk Lecture No. 46 Chapter 12 Contemporary Engineering Economics.
Sensitivity and Breakeven Analysis
Contemporary Engineering Economics, 4 th edition, © 2007 Risk Simulation Lecture No. 49 Chapter 12 Contemporary Engineering Economics Copyright, © 2006.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 5-1 Chapter 5 Some Important Discrete Probability Distributions Statistics.
Chapter 6 An Introduction to Portfolio Management.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Chapter 5 Continuous Random Variables and Probability Distributions
Lecture No. 38 Chapter 12 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Chapter 10 Sensitivity and Breakeven Analysis. Handling Project Uncertainty Origin of Project Risk Methods of Describing Project Risk.
Methods of Handling Project Risk Lecture No. 30 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
AN INTRODUCTION TO PORTFOLIO MANAGEMENT
Monte Carlo Simulation 1.  Simulations where random values are used but the explicit passage of time is not modeled Static simulation  Introduction.
Engineering Economy, Sixteenth Edition Sullivan | Wicks | Koelling Copyright ©2015, 2012, 2009 by Pearson Education, Inc. All rights reserved. TABLE 12-1.
L30: Methods of Handling Project Risk ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
L30: Methods of Handling Project Risk ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Version 1.2 Copyright © 2000 by Harcourt, Inc. All rights reserved. Requests for permission to make copies of any part of the work should be mailed to:
Lecture Presentation Software to accompany Investment Analysis and Portfolio Management Seventh Edition by Frank K. Reilly & Keith C. Brown Chapter 7.
Investment Analysis and Portfolio Management Chapter 7.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Choice of MARR and Capital Budgeting.
Theory of Probability Statistics for Business and Economics.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Internal Rate of Return Criterion.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Risk Simulation Lecture No. 40 Chapter.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc.. Chap 5-1 Chapter 5 Some Important Discrete Probability Distributions Basic Business Statistics.
Engineering Economic Analysis Canadian Edition
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Project Volatility Lecture.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Methods for Finding the Rate of Return.
Investment Analysis and Portfolio Management First Canadian Edition By Reilly, Brown, Hedges, Chang 6.
Sensitivity and Breakeven Analysis Lecture No. 25 Chapter 10 Fundamentals of Engineering Economics Copyright © 2008.
L29: Sensitivity and Breakeven Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Risk and Capital Budgeting 13 Chapter Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Risk and Capital Budgeting 13.
QM Spring 2002 Business Statistics Probability Distributions.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Interest Formulas for Single Cash Flows
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Incremental Analysis Lecture No.
Uncertainty and Consumer Behavior Chapter 5. Uncertainty and Consumer Behavior 1.In order to compare the riskiness of alternative choices, we need to.
Statistics for Business and Economics 8 th Edition Chapter 7 Estimation: Single Population Copyright © 2013 Pearson Education, Inc. Publishing as Prentice.
Contemporary Engineering Economics
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
Summary of Previous Lecture Understand why ranking project proposals on the basis of IRR, NPV, and PI methods “may” lead to conflicts in ranking. Describe.
CHAPTER 3 RISK AND RETURN. ©Correia, Flynn, Uliana & Wormald 2 Learning Objectives By the end of the chapter, you should be able to; n Distinguish between.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Dealing with Uncertainty Assessing a Project’s Worth under Uncertainty or Risk.
Chapter 4 Discrete Random Variables and Probability Distributions
Statistics for Business and Economics 7 th Edition Chapter 7 Estimation: Single Population Copyright © 2010 Pearson Education, Inc. Publishing as Prentice.
Chapter 5: Evaluating a Single Project
Methods of Describing Project Risk
Probabilistic Cash Flow Analysis
Chapter 5: Evaluating a Single Project
Elementary Statistics: Picturing The World
Chapter 7 Present Worth Analysis
FINA1129 Corporate Financial Management
Presentation transcript:

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Probabilistic Cash Flow Analysis Lecture No. 39 Chapter 12 Contemporary Engineering Economics Copyright, © 2016

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Probability Concepts for Investment Decisions o Random variable: A variable that can have more than one possible value o Discrete random variables: Random variables that take on only isolated (countable) values o Continuous random variables: Random variables that can have any value in a certain interval o Probability distribution: The assessment of probability for each random event

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Types of Probability Distribution Continuous probability distribution o Triangular distribution o Uniform distribution o Normal distribution Discrete probability distribution Cumulative probability distribution o Discrete o Continuous f(x)dx

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Useful Continuous Probability Distributions in Cash Flow Analysis (a) Triangular Distribution (b) Uniform Distribution L: minimum value M o : mode (most-likely) H: maximum value

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discrete Distribution: Probability Distributions for Unit Demand (X) and Unit Price (Y) for BMC’s Project Product Demand (X)Unit Sale Price (Y) Units (x)P(X = x)Unit price (y)P(Y = y) 1, $ , ,

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Cumulative Probability Distribution for X Unit Demand (x) Probability P(X = x) 1, , ,4000.2

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Probability and Cumulative Probability Distributions for Random Variable X and Y Unit Demand (X)Unit Price (Y)

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Measure of Expectation Discrete case Continuous case E[X] = xf(x)dx EventReturn (%) ProbabilityWeighted % 9% 18% % 2.7% 5.4% Expected Return (μ)10.5%

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Measure of Variation  Formula EventProbabilityDeviation SquaredWeighted Deviation 10.40(6 − 10.5) (9 − 10.5) (18 − 10.5) Variance (σ 2 ) =25.66 σ =5.07%  Variance Calculation μ = 10.5%

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 12.5: Calculation of Mean and Variance XjXj PjPj Xj(Pj)Xj(Pj)(X j -E[X])(X j -E[X]) 2 (P j ) 1, (-400) 2 32,000 2, , , (400) 2 32,000 E[X] = 2,000Var[X] = 64,000 σ = YjYj PjPj Yj(Pj)Yj(Pj)[Y j -E[Y]] 2 (Y j -E[Y]) 2 (P j ) $480.30$14.40(-2) (0) (3) E[Y] = 50.00Var[Y] = 3.00 σ = $1.73

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Joint and Conditional Probabilities

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Assessments of Conditional and Joint Probabilities Unit Price Y Marginal Probability Conditional Unit Sales X Conditional Probability Joint Probability $ , , , , , , , , ,

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Marginal Distribution for X XjXj 1,600P(1,600, $48) + P(1,600, $50) + P(1,600, $53) = ,000P(2,000, $48) + P(2,000, $50) + P(2,000, $53) = ,400P(2,400, $48) + P(2,400, $50) + P(2,400, $53) = 0.30

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Covariance and Coefficient of Correlation

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Calculating the Correlation Coefficient between X and Y

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Meanings of Coefficient of Correlation Case 1: 0 < ρ XY < 1 – Positively correlated. When X increases in value, there is a tendency that Y also increases in value. When ρ XY = 1, it is known as a perfect positive correlation. Case 2: ρ XY = 0 – No correlation between X and Y. If X and Y are statistically independent each other, ρ XY = 0. Case 3: -1 < ρ XY < 0 – Negatively correlated. When X increases in value, there is a tendency that Y will decrease in value. When ρ XY = −1, it is known as a perfect negative correlation.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating the Amount of Risk Involved in an Investment Project o How to develop a probability distribution of NPW o How to calculate the mean and variance of NPW o How to aggregate risks over time o How to compare mutually exclusive risky alternatives

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Step 1: Express After-Tax Cash Flow as a Function of Unknown Unit Demand (X) and Unit Price (Y). Item Cash inflow: Net salvage X(1-0.4)Y 0.6XY 0.4 (dep) 7,14512,2458,7456,2452,230 Cash outflow: Investment-125,000 -X(1-0.4)($15) -9X -(1-0.4)($10,000) -6,000 Net Cash Flow -125,0000.6X(Y-15) +1, X(Y-15) +6, X(Y-15) +2, X(Y-15) X(Y-15) +33,617

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Step 2: Develop an NPW Function o Cash inflow: o PW(15%) = 0.6 XY (P/A, 15%, 5) + $44,490 = XY + $44,490 o Cash outflow: o PW(15%) = $125,000 + (9 X + $6,000)(P/A, 15%, 5) = X + $145,113. o Net cash flows: o PW(15%) = X(Y − $15) − $100,623

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Step 3: Calculate the NPW for Each Event

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Step 4: Plot the NPW Distribution

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Step 5: Calculate the Mean

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Step 6: Calculate the Variance of NPW

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Aggregating Risk Over Time Approach: Determine the mean and variance of cash flows in each period, and then aggregate the risk over the project life in terms of NPW NPW E[NPW] Var[NPW]

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Case 1: Independent Random Cash Flows

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Case 2: Dependent Cash Flows

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 12.7: Aggregation of Risk Over Time  Given: Generalized project cash flows  Find: Mean and variance of NPW

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Solution: NPW Distribution

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Case 1: Independent Cash Flows

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Case 2: Dependent Cash Flows

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Normal Distribution Assumption

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved NPW Distribution with ±3σ

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Expected Return/Risk Trade-off

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 12.8: Comparing Risky Mutually Exclusive Projects Green engineering has developed a prototype conversion unit that allows a motorist to switch from gasoline to compressed natural gas.  Given: Four models with different NPW distributions at MARR = 10%.  Find: The best model to market.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparison Rule o If E A > E B and V A ≤ V B, select A. o If E A = E B and V A ≤ V B, select A. o If E A < E B and V A ≥ V B, select B. o If E A > E B and V A > V B, Not clear. Model TypeE (NPW)Var (NPW) Model 1$1,950747,500 Model 22,100915,000 Model 32,1001,190,000 Model 42,0001,000,000 Model 2 vs. Model 3 Model 2 >>> Model 3 Model 2 vs. Model 4 Model 2 >>> Model 4 Model 2 vs. Model 1 Can’t decide

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Mean-Variance Chart Showing Project Dominance

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Summary o Project risk: the possibility that an investment project will not meet our minimum return requirements for acceptability. o Our real task is not to try to find “risk-free” projects; they don’t exist in real life. The challenge is to decide what level of risk we are willing to assume and then, having decided on your risk tolerance, to understand the implications of that choice. o Three of the most basic tools for assessing project risk are (1) sensitivity analysis, (2) breakeven analysis, and (3) scenario analysis.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved o Sensitivity, breakeven, and scenario analyses are reasonably simple to apply, but also somewhat simplistic and imprecise in cases where we must deal with multifaceted project uncertainty. o Probability concepts allow us to further refine the analysis of project risk by assigning numerical values to the likelihood that project variables will have certain values. o The end goal of a probabilistic analysis of project variables is to produce an NPW distribution.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved o From the NPW distribution, we can extract such useful information as the expected NPW value, the extent to which other NPW values vary from, or are clustered around the expected value, (variance), and the best- and worst-case NPWs. o All other things being equal, if the expected returns are approximately the same, choose the portfolio with the lowest expected risk (variance).