AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.

Slides:



Advertisements
Similar presentations
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
Advertisements

Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Construction and Installation of the CLIC Experimental Area
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
LRT2004 Sudbury, December 2004Igor G. Irastorza, CEA Saclay NOSTOS: a spherical TPC to detect low energy neutrinos Igor G. Irastorza CEA/Saclay NOSTOS.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Francois BUTIN CERN EN/MEF.  Future of AD is clearer and deserves investment  New AEGIS experiment being prepared, requires new control room  Existing.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
ELENA Hardware Baseline Current Document Status T. Birtwistle EN-MEF-DC.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
The integration of 420 m detectors into the LHC
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
ELENA installation progress F. Butin / ELENA collaboration.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
Kitakami Side AHCAL Assembly or anywhere in any detector.
ELENA Integration F. Butin / ELENA collaboration.
Vacuum System P. Chiggiato TE-VSC
Experimental Hall in Mountain Regions
Bending crystals for magnetic and electric dipole moment measurements
ELENA installation and commissioning status
EXTENSION ELENA = BUILDING 193 Status of integration
AD consolidation activities in LS2
News and brief overview of Beamline plans for the next few months
Accelerator and Experiment Interface Session: LS2, LS3
ELENA Technical Coordination
A very first look at siting issues
East Hall under construction
Tas and Q0: Simple parametric study for Tas 15/03/07
Overview of Day One – 29 Feb 2016
Experimental Areas – LS2 planning
Laser Und XFEL.EU Experiment
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
Presentation transcript:

AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration

Current layout 1 F. BUTIN / ELENA collaboration Sketch: O. Choisnet / JM. Lacroix Gbar ?

Current layout 2 F. BUTIN / ELENA collaboration Sketch: O. Choisnet / JM. Lacroix Gbar ?

Main integration challenge F. BUTIN / ELENA collaboration Fit ELENA ring and experimental areas in here !

How to split the challenge F. BUTIN / ELENA collaboration Four main directions of work: 1. Plan to relocate the existing workshop, kickers and experiments devices into a new building 2. Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) 3. Plan circulation, access, space for racks etc 4. Anticipate on future possible experimental areas

How to split the challenge F. BUTIN / ELENA collaboration Four main directions of work: 1. Plan to relocate the existing workshop, kickers and experiments devices into a new building 2. Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) 3. Plan circulation, access, space for racks etc 4. Anticipate on future possible experimental areas

1. Relocate the existing workshop F. BUTIN / ELENA collaboration Workshop: Approx 50 m2

2. Provide short term storage F. BUTIN / ELENA collaboration Delicate physics equipment stored all over the place…

Solution : New building proposal F. BUTIN / ELENA collaboration 530 m2 AD hall extension Sketch: A. Kosmicki

TT2 TTL2 TT7 Booster 193 Extension 181 Sketch: A. Kosmicki F. BUTIN / ELENA collaboration

Accès 193 Extension Blocs à évacuer Butte à excaver Sketch: A. Kosmicki

New building details F. BUTIN / ELENA collaboration Complete CE project by A. Kosmicki and L. Lopez on EDMS# Sketch: A. Kosmicki

New building schedule Boundary condition: Re-start AD in 04/2014, with kickers in their new location  Building approval in 02/2012  MS/CfT process 03/2012 – 01/2013 (10 months)  CE works in 01/2013 – 10/2013  (10 months)  EL/CV/ kickers etc: 11/2013 – 03/2014 F. BUTIN / ELENA collaboration

Conclusions for the new building  The site is identified  The pre-project and cost estimates are ready  No technical issues identified, schedule is tight but achievable  RP gave green light wrt operation of TT2 line and possible re-use of TT7 line with neutrinos  CfT stage can be started with no delay  GTPE approved the project  Financing must be secured / manpower must be made available (concurrence with LS1): discussions with directorate in progress  Approval of site committee is expected end Feb 12 F. BUTIN / ELENA collaboration

How to split the challenge F. BUTIN / ELENA collaboration Four main direction of work: 1. Plan to relocate the existing workshop, kickers and experiments devices into a new building 2. Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) 3. Plan circulation, access, space for racks and services etc 4. Anticipate on future possible experimental areas

Confirm space usage F. BUTIN / ELENA collaboration  Validate overall geometry (shape and dimensions of the machine, transfer lines, etc).  Structure built in Catia ready to integrate layout  Draftsman team is operational: S. Maridor, JM.Lacroix, N. Joannon, O. Choisnet S. Maridor / JM. Lacroix

Confirm space usage F. BUTIN / ELENA collaboration  Magnetic measurements were performed by TE/MSC to understand possible restrictions caused by AD magnetic environment: background <2G, no problem anticipated (see report from M. Buzio and S. Russenschuck)  Location of H+ or H- source needs to be optimized wrt transfer lines. Integration is not expected to be problematic due to small surface required  Shielding required: hypothesis is 40 cm all around, 2.4 m high, no roof. Being computed by RP (J. Vollaire)

RP shielding simulations: Simplified geometry  40 cm thick walls 240 cm high  12 m x 12 m enclosure  Beam impinging on a Cu target Cu target F. BUTIN / ELENA collaboration Courtesy: J. Vollaire

Considering a full beam loss (1e8 pbar) 0.5  Sv 0.1  Sv PRELIMINARY F. BUTIN / ELENA collaboration Courtesy: J. Vollaire

How to split t he challenge F. BUTIN / ELENA collaboration Four main directions of work: 1. Plan to relocate the existing workshop, kickers and experiments devices into a new building 2. Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) 3. Plan circulation, access, space for racks and services etc 4. Anticipate on future possible experimental areas

Plan circulation scheme and space for racks/services  Anticipate on new needs for circulation inside AD hall  Propose new large gangway running along the shielding  Direct access into the new proposed building  Integrate visits possibilities  Use this gangway for visits. Try to avoid roof over ELENA.  Plan space for racks and services (water, electricity, gas, cranes upgrade)  This new gangway could be partially used for installing racks and as support for services underneath F. BUTIN / ELENA collaboration

New gangway proposal O. Choisnet

F. BUTIN / ELENA collaboration Direct access to new building O. Choisnet / N. Joannon

How to split the challenge F. BUTIN / ELENA collaboration Four main directions of work: 1. Plan to relocate the existing workshop, kickers and experiments devices into a new building 2. Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) 3. Plan circulation, access, space for racks and services etc 4. Anticipate on future possible experimental areas

Anticipate on future needs for experimental areas Many possibilities Listing best ones… F. BUTIN / ELENA collaboration ? ? ? ? ?

Conclusion  With the ELENA Project approved, antiproton physics will continue for the next 15 to 20 years  A new multipurpose building is urgently needed for :  Short term storage for delicate physics detectors, for existing and future experiments  Workshop for the experiments  AD kickers  Magnetic horn test bench  Based on this, and on a solid layout definition of the machine and transfer lines, we can progress on overall integration, shielding, accesses, services, etc… F. BUTIN / ELENA collaboration