New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.

Slides:



Advertisements
Similar presentations
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
 Installation: equipment, waveguides, water cooling, local cabling  Upgrade of LEP equipment  Contract follow up: new klystrons, spare circulators.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
 High Power RF Systems (352 MHZ - 12 GHz)  High Efficiency Power Sources  High Voltage Systems  High Gradient Accelerating Structures.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
Lutz Lilje DESY -MPY- SCRF Infrastructure for ILC EGDE Meeting Lutz Lilje.
Orsay, Sergio Calatroni - CERN 1 CERN facilities for Superconducting RF S. Calatroni, J.-P. Delahaye, J. Tückmantel, B. Vullierme.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
HINS Front-End R&D --- Status and Plans Bob Webber Fermilab Accelerator Advisory Committee August 7, 2007 Update of May 10 th – 12 th, 2006 AAC Presentation.
W. 5th SPL collaboration Meeting CERN, November 25, 20101/18 reported by Wolfgang Hofle CERN BE/RF Update on RF Layout and LLRF activities for.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
The LHC RF Power Systems Skip the intro… CWRF08 workshop - March'08 1 Presented by : Luca Arnaudon Slides by : Olivier Brunner & Luca Arnaudon Important.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Areal RF Station A. Vardanyan
CC LLRF SM18 test plan and BA6 infrastructure
HL-LHC IT STRING and Series test of SC link
WP5 Elliptical cavities
High Energy Proton Synchrotrons
RF-SRF Infrastructure: Operation,Maintenance&Upgrades
Uppsala Commitment to ESS and FREIA Planning
A frequency choice for the SPL machine: Impact on hardware
Second SPL Collaboration Meeting, Vancouver May 2009
on behalf of the RF group
Infrastructure inventory and use
SPL Collaboration Meeting PAC2009
Hosting Orsay Walid KAABI
The situation is far better than I had thought.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
352MHz Klystron Control for the 3MeV Linac test stand
Notes on Ramp-Up and Production
ESS RF Development at Uppsala University
ACS news Circulator TCU: control tests in progress All cavity racks
Superbeams with SPL at CERN
HIE-LINAC status report
HIE-ISOLDE contribution packages
FAIR pLinac RFQ Meeting pLinac RF Power Sources
The SPL-based Proton Driver at CERN
RF introduction Anders Sunesson RF group leader
Presentation transcript:

New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10

Scope of the presentation / framework  A word on the RF/KS section  Existing infrastructures  Actual activities  Upcoming activities  What is the best we can do (I believe) to take over these activities, and where?

RF/KS activities  LHC RF system operation  RF power  LHC  Linac4  CLIC&CTF3  Crab cavities in SPS  LEP RF equipment for external requests  SPL test stand  SC cavities & “clean room assembly”  LHC (3 spare cavities to be built soon)  HIE Isolde  SPL (WW’s activities)  CLIC & CTF3 structures  6 Engineers  5 Technicians  1 Fellows (Linac 4 -1/12/09) + 1 Fellow (½ SPL, ½ HIE Isolde)

A5 – high voltage test facility Equipment: -100kV – 15mA test station -overhead cranes -mechanical workshop Activities: -mechanics -HV controls -HV tests (low power) -LHC HV RF modulators HV switches HV cables thyratrons studies (repl. of tetrode) silicon oil comp. tests -Linac4 HV RF phase shifters HV tanks

B152 – 3MeV test stand, storage 3MeV structure test place -one Linac4 klystron -2 Hz modulator (prototype) Actual & Future use: - RFQ tests: No room for an additional power test place Storage area -20 LEP klystrons -circulators -WG system No picture

B112 LHC RF power (preparation and tests) -klystrons, circulators, RF loads -Main couplers -Water cooling -60kV, 10A power converter LHC & Linac 4 high power (low power tests, modification, prep) -LEP klystrons -WG -Circulators & RF loads -Chassis -Water & air cooling systems -Equipment from storage (klystrons, WG, circulators): B152 -A5 -External firms ≈ Linac4 high power tests place?? …to be investigated….

Sm18 -assembly of RF structures (cavities, Main couplers, …) -clean room assembly RF structures (cavities, Main couplers, …) -4 vertical test stands -2 bunkers -high power zone

Sm18 – assembly of RF structures (incl. clean rooms) assembly of RF structures (cavities, Main couplers, …) Clean room assembly of RF structures (cavities, Main couplers, …) -15meters class1000 and class10 clean rooms -”baldaquin” (clean 100) - Now being modified for HIE Isolde cavities Actual activities: -LHC cavities & modules -LHC main couplers -CLIC structures -HIE Isolde cavities Future (new) activities: -CTF3 structures? -HIE Isolde cryomodule? -SPL cavity or cryomodule?

Sm18 – vertical test stands New future plans: - Upgrade of cryo distribution -Upgrade V3 and V5 control system -Construction, installation and test of HIE Isolde cryostat (who?) -Test HIE Isolde cavities (matteo+fellow?) -Test SPL cavities (?? + fellow?) Four vertical test places (4.5K, 2K) -V3: SPL (not operational) -V4: resonator (operational) – Tobias, W.W. -V5: HIE Isolde (not operational) -V6: LHC (operational) – Pierre

Sm18 – high power tests facility Two bunkers: -Bunker A: 352MHz -Bunker B: 400MHZ -High power zone -100kV, 40A modulator -HV bunker -352MHz klystron -400MHz klystron, circulator & RF loads Bunker B = LHC bunker ->RF power system will not be moved -Future Plan: host HIE Isolde modules tests? -Dimensions (height) to be checked -Control system to be built -Powering to be defined -Manpower required…

Sm18 – high power zone modification Actual equipment of Bunker A -LEP klystron + circulator +WG -CW operation (max 230kW) Actual use: -Linac4 RF structure tests HV LHC LHC high RF power 100kV 40A PC SPL klystron (linac4?) Extension of RF zone to be requested for SPL: -Bunker -HV (50Hz modulator) Advantages: -Cryo -Re-use existing infrastructure (water cooling, bunker, etc) To be studied: -Linac 4 High Power test place in B112? -Extension of the RF zone in SM18

conclusions o Several activities in parallel –> priorities can change o B112 would be, a good place to host the Linac4 high power equipment (providing it can be installed there!) o Requires minimum hardware modification o Makes best share of the existing infrastructure o Would leave the possibility to install a dedicated high power RF test place in SM18 for SPL o Requires extending the existing RF zone o Bunker o High power zone o To do list: o Feasibility study of the Linac 4 test place in B112 o Will be installed in SM18 if not possible (also to be studied) o Detailed integration of the modification required in SM18 for the SPL high power tests (+Linac4 evt.) o 50Hz modulator footprint o Modulator – klystron cabling & max distance o Circulator, RF load, WG system o Control system o Extension of bunker o Request for additional space